錨定力 的英文怎麼說

中文拼音 [máodìng]
錨定力 英文
anchoring force
  • : 名詞(鐵制的停船設備) anchor
  • : Ⅰ形容詞1 (平靜; 穩定) calm; stable 2 (已經確定的; 不改變的) fixed; settled; established Ⅱ動詞...
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  1. Fist of all, on the basis of the research of agone boffins, this author investigates the interaction mechanism of bolts and rock, and introduces the elastic ? lastic analytical resolution which is consist of the liner structure, the equivalent reinforced wall rock and the original wall rock in the simple loading from the equivalent well - proportioned view ; this solution is very important meaning for the engineering design. on the basis of coulomb friction model, the author introduces the finite element equation of the contact problem in order to provide the academic foundation for the application of msc. marc. finally, combining the engineering practice of the non - linear analysis of shield tunnel through yellow river of the south - north water transfer and using the model of friction, the author researched the evolution law of stress and displacement field in the structure of grouted rock bolts, and analyzed the effect to the stress and deformation of surrounding rock mass due to anchor supports

    首先,在前人研究成果的基礎上,對桿與圍巖的相互作用機理進行研究,利用全長桿的中性點理論,從等效均化的角度來考慮桿對圍巖的加固作用,並推導了在簡單荷載作用下,含有襯砌、等效加固后的圍巖、原始圍巖三者的彈塑性解析解,對工程設計有著重要的參考意義;在數值模擬方面,以考慮固圍巖滿足規則化庫侖摩擦模型為基礎,利用虛功原理推導了接觸問題的有限元方程的計算格式,為開發運用大型商用有限元軟體msc . marc提供了理論根據,也形成了本文的理論基礎:最後,論文以南水北調東線穿黃隧洞穩性分析項目為工程實例,利用本文所述的接觸問題的摩擦模型理論,對桿支護結構的應場、位移場的變化規律進行了研究,分析了加支護對隧洞圍巖應、變形的影響。
  2. Article 28 for cases of opening kilns, burning wasteland for growing crops, lay anchor, drag anchor, fishing by using explosives or dig sand in the legally demarcated power facility protection zone thus endangering the safety of power facilities in violation of the provisions of this set of regulations, the power administrative departments shall order the violators to stop operation, restore to the original and compensate for the losses

    第二十八條違反本條例規,在依法劃的電設施保護區內進行燒窯、燒荒、拋、拖、炸魚、挖沙作業,危及電設施安全的,由電管理部門責令停止作業,恢復原狀並賠償損失。
  3. They include the ship kelvin wave pattern and wave resistance, the interaction of surface waves with floating bodies, the seakeeping of ships high - speed vessels and offshore platforms, the evaluation of the drift forces and other nonlinear wave effects responsible for the slow - drift responses of compliant offshore platforms and their mooring systems designed for hydrocarbon recovery from large water depths

    這包含了船波和波的阻抗、波和浮體的交互作用、高速行駛船舶與近岸結構物之耐海性、拖曳評估及其他造成順應式近岸結構物緩慢飄移現象的非線性效應,與結構物設計于深海中以重獲碳氫化合物之系統。
  4. Stability calculation methods for grillage supporting structure with prestressed anchor and its application

    框架預應桿邊坡支護結構穩性計算方法及其應用
  5. The anchorage force of bolt, the displacement of deep surrounding rock, and the surface displacement of the gateway were comprehensively observed, indicating that the testing entry affected by dynamical mining pressure still keeps stable, achieving a good supporting effect

    桿受、圍巖深部位移、頂板離層及巷道表面位移綜合觀測表明,受回採動壓影響后,試驗巷道穩,支護效果好。
  6. The following skills can no longer be trained on trial accounts : anchoring, starbase tactical officer, cloaking, cynosural field theory, drug manufacturing, gas cloud harvesting and all field - specific r & d agent skills

    以下技能將不能在試用賬號上學習:、隱型、母星戰術指揮訓練、誘導場理論研究、藥品制備、氣體採集理論,以及所有領域的特研究製造方面的技能。
  7. The article structure the landslide prevention and cure, the structure of prestress anchors and its application in detail. basing on the geology condition of fabricating yard, we calculate the solid power and the length of anchor rope. we have worked out the experiment research scheme, and has carried on the earlier stage experiment, field demarcation experiment and has opened pulling the experiment on the spot. ten teams of steel rope to two teams of structure types twist the experimental data that thread internal stress and the total pulling force has been in progress research, and has put forward raising the measure of solid capability of prestress anchor and administering possessing

    本文以川藏公路滑坡路段為研究對象,對滑坡的治理、預應索的結構、作用及其在滑坡防治中的應用進行了詳細的分析;基於施工現場的地質條件,對索最佳固段長度進行了理論計算;制了實驗研究方案,進行了前期實驗、現場標實驗、實地張拉實驗;對兩組結構型式的十組鋼絞線內應及總張拉的實驗數據進行了研究,提出了提高預應固性能的措施,以及具體的施工方案和施工工藝。
  8. Standard test method for rock bolt anchor pull test

    石栓試驗的標準試驗方法
  9. The heat of the bodhisattva will often be so great that one will drip sweat from one ' s forehead or down one ' s back as the kundahlini flares while releasing karma, or anchoring space for an event or healing session

    菩薩級提升者經常會如此大量地出汗,當昆達里尼在釋放業或為一次活動及療愈會議空間而暴燃時,汗水甚至會滴落前額或洇濕後背。
  10. In this paper a new procedure is proposed for calculating the anchoring force required to stabilize slopes to a specified factor of safety

    摘要針對目前固邊坡穩性計算方法中的缺陷,提出一種合理且實用的方法直接計算邊坡
  11. The supporting mechanism of pre - stress anchor is given in following sentences in this paragraph : make full use of sectional stability, put - up steel - net shot concrete to the stratified earth as the trench is being excavated, and by this means, the little liding of soil layers and small broken slumps of rock slopes can be avoided

    預應板的支護機理:充分利用巖土層自身或預處理的局部的穩性,隨基坑開挖分層掛鋼筋網噴射砼,以避免土層幫片及巖石邊坡小的節理破碎滑塌,並把土壓傳給板,由桿集中受,通過桿的平衡土壓
  12. With the help of nonlinear finite element software adina, the distribution pattern and magnitude of back earth pressure of the anchor slab retaining wall with double layered anchor plate with various material parameters were analyzed, and the factors influencing the earth pressure ware discussed, also

    摘要應用adina非線性有限元軟體分析各種材料參數下,兩層板擋墻在重荷載作用下的墻背土壓的分佈規律及大小,探討了影響土壓的因素。
  13. In this paper the friction piles are used in zipingpu multi - purpose dam construction project, the spillway in the side slope is covered with overburden, the horizontal area is from sp. 0 + 200m to sp. 0 + 280m, the elevation is about from el. 810m to el. 950m, there is hard and integral rock under the overburden, which provides enough anchor ability, and it ' s requirement to set the friction pile at the appropriate place ; in order to improve the slope stability that suitable excavation or weeding off the disadvantage load on the landslide are good measures, for the scarp it ' s better to reduce the slope

    摘要紫坪鋪水利樞紐工程溢洪道樁號0 + 200 ~ 0 + 280 、高程810 ~ 950m范圍的內側邊坡為覆蓋層邊坡,坡體下部有較為完整堅硬的巖石,具備提供足夠的條件,在適當的位置可以考慮設置抗滑樁,再通過適量的開挖提高邊坡穩性,或將滑坡體上部不利於穩的荷載挖除,對于陡坡的坡面可以將坡削緩,則效果會更好。
  14. The designing principles were discussed. the calculation relating to the constructional type, frame, body, floating and gravitational forces, anchoring system and etc. was studied

    摘要本文論述了鐵木結構網箱系統的設計原理,提出了網箱結構型式、框架、箱體、浮沉系統等的設計與計算方法。
  15. According to the original work on the stability problem of the left side of the river and the elementary analysis on the model of geological mechanism, two section planes of rock group t33 and j have been chosen to carry out the stability evaluation ( the slope stability analysis utilized the sarma program ), both of which have the different rock characters. when loads are calculated, the internal force, underground water, earthquake force, their combination and measure to deal with anchorage force infliction are also considered

    根據左岸邊坡穩問題的前期工作和地質學模式的初步分析,並結合工程地質條件調查,選取巖性構成不同的t33巖組和j巖組的兩個剖面分別進行穩性評價(邊坡穩性分析採用sarma程序進行) ,計算載荷考慮了自重、地下水、地震及其組合以及施加的處理措施。
  16. The total normal stresses arc then modified by satisfying the rigorous equilibrium conditions for the whole sliding body, resulting in an closed form expression for the required magnitude of anchoring force

    再進行修正,使固后邊坡體滿足所有整體平衡條件,最後得到邊坡滿足給安全系數要求的解析表達式。
  17. Unanchoring time for structures that are placed outside the force field now only takes 1 minute

    裝配在場外的建築解除的時間現在只需要1分鐘。
  18. In the stability graphical method, the basic property of rock mass is understood by engineering geology survey, the stability is analyzed at first, then the supporting parameters are determined, and the anchoring force is checked according to the type of cable - anchor

    性圖解法通過巖體工程地質調查來掌握巖體的基本特性,首先對采場進行穩性分析,在此基礎上確其支護參數,並針對具體索型號驗算
  19. One is the " belt persistence ", which is defined as the total length of joints teace length in a 1m wide belt projected to a basic line ( eliminating the overlay section ) over the length of the basic line. another is the one called as " search persistence ", which is defined a as the total length of joints trace length on the searched potential slipe surface over the length of the slip surface. thus, the author establishes a measuring and calculation system to these definitions and finishes a great deal of field investigation aiming at the joints trace length and the " rock bridge " survey

    在此基礎上,針對a區邊坡的穩性,結合邊坡的破壞失穩模式,以邊坡節理巖體的連通特性的研究為突破點,從節理巖體的幾何參數的統計分析出發,採用monte - carlo隨機模擬原理形成節理網路模擬圖,以巖橋和節理組合破壞的內在機制為依據,以搜索節理巖橋組合的最短路徑為手段,通過帶寬投影法與路徑搜索法兩種方法的計算,獲得了sn向中緩節理的連通率分別為48 . 7和56 . 78 ,最終推薦60的連通率進行了邊坡的穩性分析與計算,並結合工程實際,計算了邊坡的推,最終為邊坡的支護設計提供優化建議。
  20. Ascension is a process by which we resurrect our biology to a crystalline state of being as we release our karma and transcend the human thought patterns that became anchored into our existence as humankind fell in consciousness

    提升是當我們釋放我們業並超越在人類意識下跌時入我們生存中的當前思想範式時,將生物體恢復到水晶形體的過程。
分享友人