長江三峽工程 的英文怎麼說

中文拼音 [zhǎngjiāngsānxiágōngchéng]
長江三峽工程 英文
the three gorges project on the yangtze river
  • : 長Ⅰ形容詞1 (年紀較大) older; elder; senior 2 (排行最大) eldest; oldest Ⅱ名詞(領導人) chief;...
  • : 名詞1. (大河) (large) river 2. (指長江) the changjiang [yangtze] river 3. (姓氏) a surname
  • : Ⅰ數詞1. (二加一后所得) three 2. (表示多數或多次) more than two; several; many Ⅱ名詞(姓氏) a surname
  • : 名詞(兩山夾水的地方) gorge
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  • 長江 : the changjiang river; the yangtse river長江鱘 acipenser dabryanus
  1. This paper, in the light of the special geological environment and actual project situation of the three gorges reservoir area, puts forward a comprehensive analysis and evaluation system suitable for the stability analysis of the bank landslide of the three gorges reservoir area under the premise of thorough consideration of the water influence on the stability of the bank landslide, and obtains the following achievements in several aspects that have the practical application significance and certain scientific research value : ( 1 ) it is discovered that the water activity is the primary factor of the formation of the new landslide and the revival of the ancient landslide. on the one hand, the rising underwater level reduces the actual stress of landslide ; on the other hand, the long time soaking of the underwater reduces the mechanics intensity of the landslide and the slide belt, both of which reduce directly the landslide stability ; ( 2 ) in view of the special condition of the three gorges reservoir area, this paper analyzes systematically the forces acted on the landslide of the three gorges reservoir area and the force varieties acted on the divided landslide when the water level changes between 175 meters and 145 meters. thus it is more scientific and comprehensive for the analysis of the forces acted on the landslide ; ( 3 ) this paper summaries systematically 10 kinds of typical computation projects by organic combinations of different kinds of situations in the dry season ( nature statue ), rainy season ( rainstorm or rains for a long time condition ), with 175m water level in the reservoir, during the earthquake, with the water level of the reservoir adjusted from 175m to 145m and so on, and produces

    本文針對庫區特殊的地質環境與實際情況,在充分考慮水對庫岸滑體穩定性影響的前提下,提出了一個適用於庫岸滑坡體穩定性分析的綜合分析評價體系,並取得了如下幾個方面具有實際意義和一定科學研究價值的研究成果: ( 1 )研究結果發現,水的活動是新滑坡形成或古滑坡復活的主要因素,一方面是由於地下水位升高降低了滑坡體的有效應力,另一方面是由於地下水的期浸泡降低滑體及滑帶的力學強度,這兩方面的因素均將直接降低滑坡的穩定性; ( 2 )針對庫區的特殊條件,系統分析了作用於庫區滑坡體上的力系和庫水位在175m與145m間變化時滑體條塊的受力變化,從而使對作用於滑坡體上的力系分析更科學、更全面; ( 3 )通過對滑體處于旱季(天然狀態) 、雨季(暴雨或期降雨狀態) 、 175m庫水位、地震以及庫水位由175m調節下降至145m等各種不同情況的有機組合,本文系統地歸納總結出了10種典型計算況,並具體給出了相應的作用荷載的計算方法,使在庫區岸坡滑體穩定性分析評價時對計算況選擇及其作用荷載的計算更具規范性; ( 4 )具體運用c + + builder開發了關于滑坡體穩定性綜合分析評價系統,使對滑坡體穩定性分析計算更方便、更準確; ( 5 )將上述滑坡體穩定性綜合分析評價系統應用於重慶市豐都縣名山滑坡穩定性分析的具體事例中,分析結果表明,本文所提出滑坡體穩定性綜合分析評價方法對庫區的滑坡穩定性分析是實用可行的。
  2. Compute parameter data in rock mass quality assessment of the three gorge project dam foundation rock mass, and compare the results with former conclusion. the results accord with practical engineering projects

    大壩壩基巖體質量分級的參數指標數據進行試算,並將得到的計算結果與原結論進行比較,結果符合實際。
  3. In charge of one of major subjects of the national eighth five - year plan, i. e. " study on shotcreting techniques of polyacrylate emulsion cement mortar for impermeability coating of pu ding rcc dam ", the achievement of which has been appraised by the ministry of electric power and evaluated as reaching national leading level. 2. in charge of the major subject aided by the committee of national natural science funds, " study on durability of high bolumes of fly ash concrete ", the first phase achievement of which has been commended by the committee. 3. in charge of one of major subjects of the national ninth five - year plan, i. e. " study on high performance concrete in marine engineering, design and construction ". 4. acting as one of editors - in - chief of " technical specification for abrasion and cavities resistance of concrete in hydraulic structures ", which is issued by the ministry of water resources. 5. by providing the repairing and strengthening schemes on seepage and cracks of the basement of nanjing lukou international airport, the air traffic opening of the airport was ensured as scheduled. 6. consulting services on techniques of high performance and abrasion - erosion resistance concrete for three - gorges project, anti - corrosion of reinforced concrete strutures for the ore port of shanghai baoshan iron and steel works, mass fly ash concrete for jiangyin yangtze river bridge and pumping concrete for nanjing yangtze river second bridge

    主持國家「八五」攻關項目「普定碾壓混凝土壩上游面丙乳砂漿防滲層大面積施藝研究」 ,成果通過部級鑒定,評價屬國內領先水平; 2 .主持國家自然科學基金重大項目「高摻量粉煤灰混凝土的期性能研究「 ,階段成果獲國家自然科學基金委通報表彰與獎勵; 3 .主持國家「九五」攻關項目「海高性能混凝土成套技術研究」 ; 4 .水利部「水混凝土抗沖磨防空蝕技術規范」的主編之一; 5 .為南京祿口國際機場地下室修漏與裂縫補提出技術方案被采納並實施,為機場如期通航作出貢獻; 6 .為抗沖磨高性能混凝土技術、上海寶鋼礦石碼頭鋼筋混凝土防腐蝕技術、大橋大體積粉煤灰混凝土技術、南京二橋泵送混凝土技術等提供咨詢建議。
  4. In the construction period, the shiplocks are managed through the method of being entrusted to three gorges navigation administration of communication ministry by the proprietor of water conservancy project ( i. e. three gorges development company ), by which the project ' s construction smoothness and gezhouba dam ' s and three gorges dam ' s navigation

    水利樞紐施期船閘管理採取的是由業主(開發總公司)委託交通部所屬通航管理局管理的方式,該方式保障了順利和葛洲壩、航運暢通,但畢竟是期的過渡辦法,後必須建立武漢理大學碩士學位論文新的船閘管理體制。
  5. Review and prospect for the resettlement of tgp

    長江三峽工程移民回顧與展望
  6. China yangtse river three gorges project development corporation

    中國長江三峽工程開發總公司
  7. Research on reservoir - induced earthquake monitoring in three gorges area

    長江三峽工程誘發地震監測研究
  8. Shafanqi and the plan for the engineering of three gorges of changjiang river

    薩凡奇與長江三峽工程規劃
  9. The construction techniques and mechanics are approaching or even reaching the international advanced level in the asphalt concrete impervious deck of the recent completed tianhuangping pumped - storage hydroplant and the counter dam in the yangtze river which is being built with the height of 104 m, the volume of asphalt concrete core of 5x104m3

    最近建成的天荒坪抽水蓄能電站上庫瀝青混凝土防滲面板和正在建設的壩高104m 、瀝青混凝土心墻方量達5萬多m ~ 3的水利樞紐茅坪溪防護壩,施藝和施機械化度已達到或接近國際先進水平。
  10. The analyzed results are as follows : the late 1960 ' s cutoff of riverbends increased both the runoff amount and the sediment transport amount of the lower reach of jingjiang river, while the sediment deposition decreased in the lkngting lake area ; after the mid 1980 ' s, both the middle reach of yangtze river main stem and the dongting lake occurred a trend of decreasing annual sediment transport as a result of decreasing sediment releasing from the upper reach of yangtze river ; and in the recent 3 years ( 2003 - 2006 ), the three gorges reservoir first impoundment additionally reduced the sediment concentration in the middle reach of yangtze river flow with a long time, so a distance would be quite long for suspended sediment recovery, but the distance for bed - material load of suspended sediment recovery would be quite short

    分析結果表明: 20世紀60年代下荊裁彎后,口(松滋口、太平口、藕池口)分流分沙減少,下荊徑流量和輸沙量相應增加,洞庭湖泥沙淤積減少; 80年代中期以後,中游幹流及洞庭湖出口的年輸沙量呈減少趨勢,城陵磯至武漢河段河床由淤積轉為趨向沖淤平衡;初期蓄水運用后,中游含沙量沿恢復距離較,但床沙質部分恢復距離相對較短。
  11. Hydrologic monitoring event record of open diversion channel closure of tgp

    長江三峽工程明渠截流水文監測作記事
  12. The government has organized experts to work out the report on the impact of the three gorges project on the ecology and environment, and countermeasures, and has approved the environmental impact statement of the three gorges project

    中國政府組織有關專家完成了《長江三峽工程生態與環境影響及對策的論證報告》 ,批準了《環境影響報告書》 。
  13. However, when the yangtze gorges project is finished, it will sink in the yangtze river forever

    然而長江三峽工程修畢后,它將永遠地沉沒于底。
  14. Review of the appraisal work for million immigrants ' resettlement planning in the three gorges reservior area

    長江三峽工程庫區百萬移民安置規劃評估作回顧
  15. Some thoughts and suggestions about clearing reservoir area of three gorges project of yangtze river during its 3rd stage impoundment

    長江三峽工程庫區3期蓄水庫底清理作的思考及建議
  16. The yangtze river three gorges project is an eye - catching hydropower project, which has profound economic and social benefit in terms of its flood - prevention, electricity generation and navigation functions

    長江三峽工程舉世矚目的水電,具有防洪、發電、航運等巨大的經濟效益和社會效益。
  17. Upon completing the challenging internship in hong kong, the students will travel to xi an and beijing for a short cultural study trip and study at first - hand the yangtze river three gorges project

    在實習完畢后,他們將會前往西安及北京探訪交流並參觀長江三峽工程,暑期訓練計劃至此亦劃上句號。
  18. The world famous three gorge project was officially launched on december 14, 1994, and 26 700 mw hydraulic power generating sets were scheduled to be installed so that the first power generating set would start power generation in 2003 and the installation of all the 26 power generating sets would be completed by 2009

    舉世矚目的長江三峽工程於1994年12月正式開,安裝26臺700mw水輪發電機組,計劃2003年第一批機組發電, 2009年建成,是一項跨世紀的宏偉
  19. The three gorges project is a world - famous water conservancy center project. the main parts of it are the body of concrete dam, permanent ship casket, electricity - produce department, etc. these are all large volume concrete which influence the ageing resistance of the project directly, and they also have much to do with ( he concrete of moderate heal portland cement armature and concrete aggregate, etc

    長江三峽工程,是舉世矚目的特大型水利樞紐的主體:混凝土大壩壩體、永久船閘,發電廠房等均為大體積混凝土,這些混凝土的耐久性既與施質量有直接關系,也與組成壩體的小熱硅酸鹽水泥、骨料、鋼筋等原料有密切的關系。
  20. The research area, fengjie county, is located in the center of three gorge reservoir area and is a place with landslides frequently occurring in history, so it is of great practical meaning to investigate and study the forming and distribution regularities of landslides there

    長江三峽工程是當今世界上最大的水利樞紐,論文研究區重慶市奉節縣,位於庫區的腹地,歷史上就是滑坡多發地帶,調查研究滑坡的分佈、變化規律具有重大的實際意義。
分享友人