長沙洞 的英文怎麼說

中文拼音 [zhǎngshādòng]
長沙洞 英文
changsa dong
  • : 長Ⅰ形容詞1 (年紀較大) older; elder; senior 2 (排行最大) eldest; oldest Ⅱ名詞(領導人) chief;...
  • : 沙動詞[方言] (搖動以清除雜物) shake
  • : Ⅰ名詞(物體上穿通的或凹入較深的部分; 窟窿; 洞穴) hole; cavity Ⅱ形容詞(深遠; 透徹) profound; thorough; clear
  • 長沙 : changsha
  1. The course is also known for its famous bunkers, for example, hell on the long 14th, strath on the short 11th and the road bunker at what is probably the most famous golf hole in the world, the 17th or road hole so called because a road - which is in play - runs hard against the back edge of the green

    這一球場還以著名的坑而聞名,例如在的14上的「地府」 11上的「平底河谷」以及世界上最著名的高爾夫球,第十七又叫路上的「路坑」 。
  2. From this moment vampa devoted all his leisure time to perfecting himself in the use of his precious weapon ; he purchased powder and ball, and everything served him for a mark - the trunk of some old and moss - grown olive - tree, that grew on the sabine mountains ; the fox, as he quitted his earth on some marauding excursion ; the eagle that soared above their heads : and thus he soon became so expert, that teresa overcame the terror she at first felt at the report, and amused herself by watching him direct the ball wherever he pleased, with as much accuracy as if he placed it by hand

    從此以後,萬帕就把他全部的空余時間都用來練習使用這寶貴的武器上了,他買了火藥和子彈,無論什麼東西都可以被他拿來當目標坪山上的滿身苔蘚的橄欖樹的老樹干,從地里鉆出來覓食的狐貍,在他們頭頂上翱翔的老鷹。所以不久他的槍法就非常準確了,以致最初一聽到槍聲就害怕的德麗莎也克服了她的恐懼,竟能很有興趣地看著他隨心所欲地發彈射物,其準確程度,真象彈靶近在幾尺一樣。
  3. Mogao grottoes, a1so known as the caves of a thousand buddhas, is situated at the eastern foot of mingsha mountain, 25 km southeast of dunhuang in gansu province

    莫高窟,俗稱千佛,位於甘肅省敦煌市東南公里的鳴山東麓。南北全米,各代開鑿的石窟密佈於米高的?面上。
  4. The analyzed results are as follows : the late 1960 ' s cutoff of riverbends increased both the runoff amount and the sediment transport amount of the lower reach of jingjiang river, while the sediment deposition decreased in the lkngting lake area ; after the mid 1980 ' s, both the middle reach of yangtze river main stem and the dongting lake occurred a trend of decreasing annual sediment transport as a result of decreasing sediment releasing from the upper reach of yangtze river ; and in the recent 3 years ( 2003 - 2006 ), the three gorges reservoir first impoundment additionally reduced the sediment concentration in the middle reach of yangtze river flow with a long time, so a distance would be quite long for suspended sediment recovery, but the distance for bed - material load of suspended sediment recovery would be quite short

    分析結果表明: 20世紀60年代下荊江裁彎后,三口(松滋口、太平口、藕池口)分流分減少,下荊江徑流量和輸量相應增加,庭湖泥淤積減少; 80年代中期以後,江中游幹流及庭湖出口的年輸量呈減少趨勢,城陵磯至武漢河段河床由淤積轉為趨向沖淤平衡;三峽工程初期蓄水運用后,江中游含量沿程恢復距離較,但床質部分恢復距離相對較短。
  5. This is also the signature hole with a blind drive over hotel grounds followed by a very long second shot to an extremely narrow green with the road hard against the back edge and the fearsome road bunker front left

    這也是一個簽名。先是一次近乎盲目的擊球,之後是一個擊球,抵達一個非常狹窄的果嶺,路床緊貼在後邊,可怕的路坑就在左前方。
  6. 4. this thesis introduces the application of rd - 1005 mrfd in hunan yueyang dongting lake bridge and permanent magnetism adjustable assemblage mrfd in changsha hongshan bridge and changsha liuyang river bridge. the studies on cable vibration mitigation field tests in these bridges are presented

    4 .介紹了湖南嶽陽庭湖大橋上安裝磁流變阻尼器的情況,在洪山大橋、瀏陽河大橋全橋拉索上安裝了永磁調節裝配式磁流變阻尼器,並進行了現場拉索減振試驗研究。
  7. This thesis takes the hunan yueyang dongting lake bridge 、 changsha hongshan bridge and changsha liuyang river bridge as the project background, supported by the national natural science foundation project “ field measurements of rain - wind - induced cable vibration on the yueyang dongting lake bridge in hunan province ”, carries out some researches as follow : 1. this thesis introduces the development of cable - stayed bridge 、 the necessity to study the cable vibration, briefly introduces the mechanism of cable vibration and cable vibration mitigation measures

    本文以湖南嶽陽庭湖大橋、洪山大橋、瀏陽河大橋拉索振動控制為工程背景,在國家自然科學基金項目「斜拉橋拉索風雨振現場觀測與半主動控制研究」資助下,進行了以下研究工作: 1 .介紹了斜拉橋的發展,拉索振動研究的必要性並對拉索振動形態及減振措施進行了簡要的論述。
  8. This study will gain an understanding of the earthquake response behavior of such a special structure and will also provide a basis for monitoring of bridge after opening to the traffic. in this work, a 3 - d nonlinear finite element program tty is developed the results of analysis are in good agreement with that of the bathe and changsha tiedao university ' s report about earthquake response of the dong ting hu bridge

    根據理論分析結果,本文編制了三維非線性有限元程序tty ,對端部作用有集中力的彎梁作了幾何非線性計算,並與bathe等進行比較;同時對湖南庭湖大橋進行了線性與非線性分析計算,並與鐵道學院庭湖大橋抗震性能研究報告進行了對比,其結果均能較好吻合。
  9. The right part is higher than the left of the green. a bunker sits in front of the green and a grass pit backs to green

    一個果嶺右邊高、左邊低的三桿,擊球至少要有190碼的距離,不夠會落入前方的坑,太則會跑到後方的草區。
  10. Also, beware the famous spectacles, the 14th signature hole, with two large and deep bunkers in the face of a ridge guarding the green about 80 yards from the flag. the tee shot must be long and perfectly placed to have any chance of carrying the spectacles with the second shot

    此外,尤其要注意第十四在離口旗桿80碼處的山脊上兩個又大又深的坑守衛著這一片果嶺,擊球必須且準,球手才有機會在二次擊球時使球滾向口。
  11. Before lighting the fuse, the hole was topped off with sand, and a three - foot - long, 1. 25 " diameter iron tamping rod was used to pack down the gunpowder

    在點燃之前,的上部填滿了黃和一根3英尺,直徑1 . 25寸的內置火藥的鐵棒。
  12. A long par4. the players should aim to the middle of the 2 bunkers on the fairway, of which there are water hazards twinkling and sparking on the both side

    的4桿,開球時要對著兩個坑中間打,只要方向稍有偏失,很容易就會落水,上果嶺的一桿只要向著旗桿打就行。
  13. So, it is significant from present and long - term benefits to design and make movable wind erosion tunnel, and to apply it as a tool to carry out research on protective cultivation, diminution of soil wind erosion, reduction through conservation tillage

    因此,設計和製作移動式風蝕風,用風作為有力的工具,開展保護性耕作減少土壤風蝕,防治塵暴的研究就具有重要的現實意義和遠意義。為此本文進行了下列工作: 1
分享友人