防洪建築物 的英文怎麼說

中文拼音 [fánghóngjiàn]
防洪建築物 英文
flood control structure
  • : Ⅰ動詞(防鷥) provide against; defend against; guard against Ⅱ名詞1 (防守; 防禦) defence 2 (堤...
  • : i 形容詞(大) big; vast; grand Ⅱ名詞1. (洪水) flood 2. (姓氏) a surname
  • : Ⅰ動詞1 (建築) build; construct; erect 2 (建立; 設立; 成立) establish; set up; found 3 (提出;...
  • : 築名詞(貴陽的別稱) another name for guiyang
  • : 名詞1 (東西) thing; matter; object 2 (指自己以外的人或與己相對的環境) other people; the outsi...
  • 防洪 : flood protection; flood control; prevent or control flood
  1. Flood protection products - specification - building apertures

    用品.規范.排水孔
  2. Flood protection products - specification - building skirt systems

    產品.規范.踢腳板系統
  3. Article 19 : building of dam, sluice gate, bridge, wharf and other structures blocking, crossing or bordering a river channel ; laying pipelines or cables across a river, must comply with state - specified standards for flood control and navigation as well as other related technical requirements

    第十九條修閘壩、橋梁、碼頭和其他攔河、跨河、臨河,鋪設跨河管道、電纜,必須符合國家規定的標準、通航標準和其他有關的技術要求。
  4. The author analysed some types of building damage by flood and based on it presented outlines for flood and waterloggint prevention design of a building

    澇災害破壞的形式進行了分析,並在此基礎上提出了澇設計要點。
  5. In addition, water control projects such as gates, pumps, polders and dikes spread all over the basin. all these bring more difficulties to scheme making for flood broadcasting and prevention as well as disaster reduction

    再加上流域內水工控制(閘,泵,圩,堤等)星羅棋布,給流域內水預報和汛減災方案的編制帶來了一定的難度。
  6. The system possesses the real time correcting function, which can avoid error accumulation and highly increase the forecasting accuracy ; ( 3 ) the flood control system can be multiple - scheme designed, that is, the control schemes can be designed in terms of different control ways for hydro - projects. simulated computation can be carried out to obtain multiple schemes that can be used by the leaders for decision making after risk and consequences estimation, so as to scientifically enhance th

    系統具有實時校正功能,可以避免誤差累積,極大地提高了預報精度; ( 3 )調度系統可以進行多方案設計,即可以根據水工不同的調度方式來設計調度方案,並進行模擬調度計算,最終生成多個方案,供領導決策,提高了決策的科學性; ( 4 )系統採用的數據均立在實時雨情、水情、工情和天氣預報等數據庫基礎上,預報、調度均能做到快速及時。
  7. An emphasized study on what mentioned above for the water system of the urban center of guilin city and the relevant planning of flood control is described herein

    文中重點研究了桂林市中心城水系中水環境容量、水體的連接與流動、水系之間的連接以及城市水系的規劃等內容。
  8. Within the scope of control for any river course or lake it is prohibited to construct buildings or structures impeding flood discharge, dump garbage and waste residues or engage in activities affecting the stability of river f lows, harming the safety of banks and embankments or other activities impeding flood discharge in river courses

    禁止在河道、湖泊管理范圍內設妨礙行、構,傾倒垃圾、渣土,從事影響河勢穩定、危害河岸堤安全和其他妨礙河道行的活動。
  9. The project mainly solved the problems from the flood control, the morphological diversity of river profile and cross section, and the diversity of habitats in the river through the layout of shoreline and structures, the design of river profile and cross section, the design of riverbank protection, which is one effective engineering practice of eco - hydraulic engineering

    治理工程在岸線布置、沿河(構)布置、河流縱橫斷面設計、岸坡護設計等方面解決了安全、河流縱向形態多樣性、斷面形態多樣性以及河流內棲息地多樣性等問題,是生態水工學理念的一次有效工程實踐。
  10. The overall plan for xiaolangdi project management zone is carried out to ensure the safe operation of hydraulic constructions in the zone, to make full use the advantages of location and resources of the area, and to realize the general objective of “ mainly aim at flood prevention including ice flood prevention and sedimentation reduction, and give consideration to water supply, irrigation, power generation, storage of clear water and discharge of sediment flow, alleviating disaster and bringing about benefit, and comprehensive utilization ", for the project development

    為確保小浪底水利樞紐工程管理區內水工的安全運行,充分發掘管理區的區位優勢和資源優勢,實現「(包括凌) 、減淤為主,兼顧供水、灌溉、發電、蓄清排渾、除害興利、綜合利用」的工程開發總目標,對工程管理區進行了總體規劃。
分享友人