陣風力 的英文怎麼說

中文拼音 [zhènfēng]
陣風力 英文
gust force
  • : Ⅰ名詞1 (作戰隊伍的行列或組合方式) battle array [formation]: 布陣 deploy the troops in battle fo...
  • : Ⅰ名詞1 (空氣流動) wind 2 (風氣; 風俗) practice; atmosphere; custom 3 (景象) scene; view 4 ...
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • 風力 : 1. (風的力量) wind-force2. (以風為動力) wind power
  1. A balmy breeze refreshed us after the sultry blast.

    熱浪過后,使我們恢復了精
  2. The company, in order to improve the key competitiveness of the products, the chain not merely devoted to the brand joins management, furnish a huge amount of money for building the production industrialized countries of about 35000 square meters at the same time, adopt the most advanced production equipment and high - quality fashion surface fabric imported, set up the research and development centre of the products and strong team of research and development of products of the battle array in hong kong at the same time, successively set up the products and developed and ground the room in hong kong, fuzhou, guangzhou, developed experience and succeeded in making the famous designers of a lot of brands to design meticulously for many years, the style of its product reflects the fashion of world, depart in order to make the flagship of fashionable women ' s clothing in 21st century

    公司為提高產品的核心競爭,不僅致於品牌的連鎖加盟經營,同時斥巨資興建約35000平方米的生產工業園,採用最先進的生產設備和優質進口的時尚面料,同時在香港組建了產品研發中心和容強大的產品研發隊伍,先後在香港、福州、廣州設立了產品開發設計研室,由有多年開發經驗並成功打造過多個品牌的著名設計師精心設計,其產品的格體現國際的流行時尚,為打造21世紀時尚女裝的旗艦而啟航。
  3. As the wind freshened there came a sudden squall.

    增強的時候,突然颳起一
  4. As the wind freshened there came a sudden squall and the ship made a strange movement, listing to port.

    增強的時候,突然來了一,船身奇怪地晃動了一下,向左傾斜過來。
  5. A tornado touches down in brooklyn, new york just after dawn during a violent thunderstorm that dropped near three inches of rain in the new york city area, crippling the city ' s subway and commuter rail system during the morning rush hour

    紐約市在清晨一場將近一小時三英?雨量狂雨驟的大雷雨後,一強大的龍?在紐約州布魯克林區著陸,造成上午尖峰時段地鐵和通勤火車系統的癱瘓。
  6. The dynamic loading resulting from blast, gusts of wind, or seismic forces is generally not harmonic.

    由於沖擊波,或地震所產生的動荷載一般不是諧和的。
  7. Strong wind is expected or blowing in the victoria harbour, with a sustained speed of 41 - 62 kilometres per hour km h, and gusts which may exceed 110 km h

    維多利亞港內吹強或將有強,持續每小時41 - 62公里,可能超過每小時110公里。
  8. Strong wind is expected or blowing in the victoria harbour, with a sustained speed of 41 - 62 kilometres per hour ( kmh ), and gusts which may exceed 110 kmh

    維多利亞港內吹強或將有強,持續每小時41 - 62公里,可能超過每小時110公里。
  9. Discusses the characteristic values on individual stock risk with the standard deviation, variance ( 2 ), standard deviation coefficient ( cv ) and coefficient measurement, construct the individual on stock ' s statistics index system on investment risk. 2. discuss the characteristic of standard deviation, variance, variance - covariance matrix to measure the investment risk of stock portfolio

    第二章「證券投資險的度量」分為三個小節: 1 、討論單個證券險用標準差( ) 、方差( ~ 2 ) 、變差系數( cv )以及系數度量,構造了單個證券的投資險統計指標體系; 2 、討論了用標準差和方差、方差?協方差矩、方差?協方差矩的特徵值來度量組合證券的投資險; 3 、計算了衡量證券組合系統性險的系數值,並分析了系數的含義和預測能的可靠性。
  10. Earthquake and wind ), because of the damping matrixes of the two structures " motion equations are both non - classical, the dynamic equation ca n ' t be decoupled by the traditional real - mode analysis ( the mode - superposition method ). though, in this thesis the complex - mode analysis is used to solve the stationary and non - stationary random earthquake response of structures and their analytic expressions are got. on the basis of these expressions, the optimal parameters of the two structures " isolation & seismic decrease equipment are analyzed

    目前,基礎隔震結構、 「加層減震」 ( tmd減震)結構正逐步應用於工程實際,由於這兩種結構在動荷載(如地震、)作用下動方程中的阻尼矩為非經典情形,傳統的實模態分析方法(振型分解法)不能使動方程解耦,因此本文運用復模態分析方法求得了結構在平穩和非平穩隨機地震激勵下結構隨機地震響應的解析表達式,在此基礎上進行了基礎隔震和tmd減震裝置參數的優化分析。
  11. From the director known for giving jackie chan a break in his early kung - fu films, ho meng - hua strikes gold again with swift sword

    邵氏在八十年代的大型武俠片情俠追劍,演員容強勁,再加上金庸著作,吸引非凡。
  12. Using multidisciplinary collaboration simulation, applying aeroelastic theory and method, structural modeling with fem was set up, structural dynamics and vibration mode were analyzed, and then problem of gust load alleviation for a large flexible wing was discussed

    摘要利用多領域協同模擬技術,應用氣動彈性分析理論和方法,對柔性機冀進行結構有限元建模、動學特性分析、固有振動分析,並針對垂直載荷減緩進行討論。
  13. As the wind freshened there came a sudden squall and the ship made a strange movement, listing to port

    增強的時候,突然颳起一,船身奇怪地晃動了一下,向左傾斜過來。
  14. A batch of equations with atmosphere turbulence about aircraft movement and others mathematic models ; 2

    給出了一組帶有大氣紊流、影響和推矢量的飛機運動方程和其他一些數學模型; 2
  15. The wind loading of a tracking radar antenna, for example, results from a mean velocity component that varies with time plus superimposed random gusts

    例如跟蹤雷達天線的負載是由一個隨時間變化的平均速度成分與迭加的隨機組成的。
  16. In this paper the author first analysed the wind effects on bridges, and wind - induced vibration is described in particular. second, two methods for wind effects on bridges are discussed, which include the method of gust response factors and the method of buffeting response spectrum. thirdly, from the requirement of practical engineering, the accurate analysis method is simplified according through the parametric analysis, the formula for engineering application of the second method is presented. finally, a realengineering example illustrate the usage of the two methods. and the result of the engineering example show that the stress calculated by buffeting response spectrum method is larger than which calculated from the gust response factor methed, also the temporary method of wind resistant ways for bridge in cantilever state is presented

    第二,分析了橋梁抗分析的兩種方法,包括基於系數的分析法和抖振反應譜分析法。第三,從工程實際應用出發,通過參數分析,對精確方法進行適當簡化,推導出了橋梁在懸臂施工中的抖振反應譜法的實用計算公式。最後,通過工程實例,採用兩種抗分析方法分別進行了分析計算,實例分析的計算結果說明反應譜法計算得到的內大於按系數法得到的內;同時提出了在懸臂施工狀態工程施工中的臨時抗措施。
  17. Hurricane force wind is expected or blowing, with sustained speed reaching upwards from 118 kmh and with gusts that may exceed 220 kmh

    已達或將達颶程度。即持續每小時118公里或以上,而可能超過每小時220公里。
  18. Hurricane force wind is expected or blowing, with sustained speed reaching upwards from 118 km h and with gusts that may exceed 220 km h

    已達或將達颶程度。即持續每小時118公里或以上,而可能超過每小時220公里。
  19. Combined with the advantages of matrix converter, ac - excited generation technique and vector control scheme, the stator flux - oriented vector control model of the variable - speed constant - frequency ( vs cf ) ac - excited generator fed by a matrix converter was developed. simulation studies of the proposed power generation system were carried out

    本文還結合了矩式變換器、交流勵磁發電技術和矢量控制的優點,建立了矩式變換器供電的變速恆頻交流勵磁發電機定子磁場定向的矢量變換控制系統模型,對矩式變換器在交流勵磁發電系統中應用進行了模擬研究。
  20. The more details about author ' s work are as follows : 1 ) the mathematical models of solar array wind turbine, diesel, battery, converter and inverter are presented based on quasi - steady state theory. by using the models, the power flow may be determined corresponding to solar radiation and wind velocity data so that the long - term performances of wsdbhps can be predicted

    具體說來本文的工作及創新點如下: 1 )建立了光伏列、發電機組、蓄電池、柴油機和逆變器的穩態數學模型,利用該模型可以計算出對應實時的太陽輻射強度和速下系統的實時能量分佈,為預測系統功率流以及長期穩態性能打下基礎。
分享友人