隧道巖爆 的英文怎麼說

中文拼音 [suìdàoyánbào]
隧道巖爆 英文
popping in tunnel
  • : Ⅰ名詞1. (隧道; 地道) tunnel; underground pass2. [書面語] (道路) road3. (郊外的地方) suburbsⅡ動詞[書面語] (旋轉) turn
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • : 名詞1. (巖石) rock 2. (巖峰) cliff; crag
  • : 動詞1. (猛然破裂或迸出) explode; burst 2. (放在滾油里快炒) quick-fry
  • 隧道 : tunnel; tunneling; tunnelling; chunnel; drive
  1. Due to exceedingly flat arched vault of the flat tunnel with outsized span and renewed stress allocation in surrounding rock after excavation, which would inevitably induce some excessively large load on the base of arch, therefore, larger load - bearing capability in the is " foundation is a must. on the other hand, smooth face explosion must be applied to excavation of the arch base to further ensure the integrity and continuity of country rock around tunnel

    特大跨超淺埋拱部結構過于扁平,開挖后發生二次應力分佈,拱腳處的應力過大,要求有較大的地基承載力,拱腳開挖時必須採用光面破,保證圍的完整性和不受擾動,開挖后及時封閉,防止該處積水軟化圍
  2. The result is that the probability of high tensity rockburst in the tunnel is non - existent and the probability of lowgrade and moderate tensity rockburst in the tunnel is existent

    預測結果表明,雪峰山不會出現高烈度的,但某些地段可以出現級或級的
  3. Study on blasting seismic dynamic effect for tunnels with close interval in bedded rock mass

    層狀體中近鄰雙線破的振動響應研究
  4. ( 2 ) taking the geology analysis as main way and combining the pre - test, predicating the tunnel ' s main geology condition ( rock quality, surrounding rock classification, long - wide joint, fault, ground water, crustal stress ), and predicating the main potential disaster ( collapse, breaking water, rockburst, large deformation ) ( 3 ) employing the stress test result and inverse analysis of the stress field, finding out the crustal stress " s distributing rule along the tunnel axes section : the highest crustal stress is 24mpa near the deepest spot, and predicting that the k2 + 260 ~ k3 + 000 likely to be the high crustal stress segment for this tunnel

    通過地質分析、類比分析、監控量測、數值模擬、神經網路等方法,對鷓鴣山潛在的主要地質災害(塌方、涌水、和大變形)進行了預測預報( 3 )在現場地應力測試成果的基礎上,運用數值計算進行應力場反演,基本查明了沿軸線剖面的地應力分佈規律:地應力量級在最大埋深附近達到最大值24mpa ,並預測k2 + 260 k3 + 000段將很可能成為鷓鴣山的高地應力段。 ( 4 )塌方往往與斷層破碎帶及千枚相聯系。
  5. The xuefeng mountain highway tunnel, which is to be constructed, is the most deep - lying and longest tunnel in our country. its geological conditions are more complex, the problems of rockburst and large deformation maybe its main problems of engineering geology

    邵懷高速公路雪峰山是目前我國擬建埋深最大和最長的公路之一,地質條件較為復雜,問題和大變形問題是該的主要工程地質問題。
  6. Drill and blast method of tunnel excavation on hard rock

    地鐵法開挖結合盾構法襯砌的施工技術
  7. Abstract : the application of smoothwall blasting in crushed surrounding rock of no. 2 tunnel with crushed surrounding rock has obtained more satisfactory results through selecting rational blasting parameters, adopting right supporting method and controlling the overbreak or underbreak of the tunnel effectively, etc

    文摘:在周家山2號破碎圍施工中,應用光面破技術,通過選擇合理的破參數,正確的支護施工方法,有效地控制的超欠挖,加快掘進速度,取得了較理想的效果。
  8. The application of smoothwall blasting in crushed surrounding rock of no. 2 tunnel with crushed surrounding rock has obtained more satisfactory results through selecting rational blasting parameters, adopting right supporting method and controlling the overbreak or underbreak of the tunnel effectively, etc

    在周家山2號破碎圍施工中,應用光面破技術,通過選擇合理的破參數,正確的支護施工方法,有效地控制的超欠挖,加快掘進速度,取得了較理想的效果。
  9. The formation, classification, treatment and influence factors of rock burst are introduced. and the measurements for prevention and cure are offered at the same time

    秦嶺終南山不良地質主要是、斷層、洞口堆積體,論文簡要介紹了的分類、的特徵、的形成條件與影響因素,重點介紹了的綜合防治措施。
  10. Special emphasis is laid upon the construction operation process of flat tunnels with outsized span at even shallow depth, meanwhile, how to build large span flat tunnel is briefed in this article. measures taken to reduce vibrations caused by explosion in driving tunnel and surface subsidence and methods of monitoring and surveying in the course of construction are detailed in this article

    本文扼要介紹了大跨扁平的施工方法,重點闡述了特大跨超淺埋扁平的施工工藝過程,對破振動和地表沉降的控制方法,以及施工監控量測的過程和方法,並通過對量測結果的分析,說明監控量測對施工的指導作用,並對圍穩定性進行了一些簡要分析。
  11. Prediction and countermeasure for rockburst in cangling mountain highway tunnel

    蒼嶺特長公路隧道巖爆預測和工程對策
  12. Comprehensive study on prediction of rockburst in deep and over - length highway tunnel

    深埋特長公路隧道巖爆預測綜合研究
  13. Under the effect of instantaneous blasting shock wave, the reliability of lining is affected. the influence on existing tunnel relates to amount of dynamite, tunnel space, area of vvok face and rigidity of round rock

    破沖擊波的瞬間作用下,既有襯砌安全性將受到影響,裝藥量、間距、開挖面面積、圍軟硬程度都與破沖擊對既有的影響有關。
  14. Technology comparison between tri - arm rock drilling jumbo and hand rock breaker used in drilling and blasting construction of luofeng tunnel

    蘿峰三臂鑿臺車與手持式鑿機鉆法掘進施工技術比較
  15. Through the demolition construction design of huang guo shu, just cross the 4a scenic resort of our country, we explore the construction method to fit for sensitive environment and west carst region

    摘要通過對穿越國家4a級風景名勝區的黃果樹施工鉆設計,探索在環境影響要求極高的地區及西部溶地區適宜的施工方法。
  16. But seeing from the rock structure condition, the relation between the structure and the s |, the relation between the structure and the tunnel axes, the probability to happen rockburst is very low

    但從圍結構條件及與主應力、軸線的關系來看,圍發生的可能性很小。
  17. The tunnel ' s largest watering quantity is 4220. 9m3 / d ( 6 ) the test, inspecting system and the computing showing that, the rock ( iv ) in high crustal stress segment has the rock quality and stress condition to happen light rockburst

    最大涌水量為4220 . 9m ~ 3 d 。 ( 6 )試驗、測試與計算表明,在高地應力地段的類圍中存在發生輕微性及地應力條件。