隧道工作面 的英文怎麼說

中文拼音 [suìdàogōngzuòmiàn]
隧道工作面 英文
tunnel face
  • : Ⅰ名詞1. (隧道; 地道) tunnel; underground pass2. [書面語] (道路) road3. (郊外的地方) suburbsⅡ動詞[書面語] (旋轉) turn
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : Ⅰ名詞1 (頭的前部; 臉) face 2 (物體的表面) surface; top 3 (外露的一層或正面) outside; the ri...
  • 隧道 : tunnel; tunneling; tunnelling; chunnel; drive
  1. Abstract : this article give an outline of control to fuel gas oven with the system combined in plc & hmi and inverter

    摘要:概述利用臺達plc 、人機界和變頻器系統控制燃氣式食品爐烤制不同食品的原理。
  2. A good many case of approaching excavation are studied in this article, such as the study of infection of be coal mining to the huayingshan tunnel, technology study of strucked tunnels of metro in shenzhen, countermeasure study of tunnel approaching pile foundation of metro in guangzhou, excavation methods optimized of large cross section subaqueous tunnel approaching pile foundation of lrt in chongqing, etc. on the basic of analysing and concluding relative study production all over the the world by the numbers, classification of approaching excavation, partition of approach zone, formula of partition of approaching zone, approach degree and countermeasure grade of generalized approaching excavation of underground works are put forward. general methods studying and trea

    本文結合者多年來對華鎣山減少壓煤量研究、深圳地鐵重疊第11頁西南交通大學博士研究主學位論文技術研究、廣州地鐵公紀區間廣紡聯段鄰樁施對策研究和重慶輕軌大坪大斷車站鄰近基礎淺埋暗挖法優化分析等諸多近接施問題案例的研究,在系統分析和歸納總結國內外相關研究成果的基礎上,系統地提出了廣義的地下程近接施的分類、分區、分區指標表達式、近接度與對策等級概念以及分區、分度準則,給出了研究和解決近接施問題的普遍方法,如數值分析先行,模型試驗、現場測試驗證等。
  3. Since the shallow depth excavation is the main factor to cause ground settlement in shenzhen subway tunnel, this paper discusses some corresponding countermeasures including the improvement of ground property, appropriate draining of groundwater, scheduled excavation depth and width, etc, to control strata distortion and surface settlement, and argues that these measures are expected to effectively control surface settlement while constructing city subway in soft ground excavation

    摘要針對深圳地鐵淺埋暗挖中影響地表下降及地層變形的因素,提出了遵循「十八字」原則、改善土體特性、適度排放地下水、根據地層條件選擇施方法、增大左右線開挖的距離、合理確定開挖進尺、提高施效率、加強初期支護、及時施二次襯砌等對策。
  4. To minimize worsening of traffic congestion and taking environmental and visual concerns into consideration, most mrt system routes in metropolitan areas are underground. except for those stations and crossovers where wide ranging areas are involved, the tunnel boring machine is usually applied. conventional tunnel boring was first adopted in 1818 in london, but at that time was only used on a one - line circular tunnel basis

    為減少對交通之沖擊及環境之影響,一般于都會區大眾捷運系統之路線劃皆以地下化為主,而整條路線除大積開挖之地下車站及轉轍段外,其餘皆以潛盾為設計之主要考量。
  5. Associated with a project of the planned xuefengshan tunnel with 7. 6 km long during the construction of shaoyang to huaihua expressway in hunan province of shanghai to ruili national trunk highway, this paper firstly makes an introduction of the frequently - used analysis & computation methods for tunnel supporting structure. then, based on the analysis of the basic theory about the interaction mechanism of surrounding rock and support structure, a spatial computation model is made, a coupling numerical computation method with 3 - d elastic - plastic finite element and infinite element is proposed, and a comprehensive analysis has been made to the effects of the overall stability and safety of the surrounding rocks of different characteristics, different classes and under different construction methods. and thus the problem of 3 - d infinite region to which applying the general finite ca n ' t do has been resolved

    6公里的雪峰山程,首先介紹了支護結構的常用分析計算方法;然後通過對過程中,洞室穩定性與支護結構相互用機理的深入分析,建立了過程的空間計算模型,提出了採用三維彈塑性有限元-無限元耦合的數值計算方法,綜合分析了在不同圍巖特性和圍巖類別條件下,以及不同施開挖方案等對圍巖整體穩定和安全性的影響,從而解決了通用有限元方法難以解決的三維無限域問題;其可充分發揮有限元法在分析非線性方的有效性和成熟性,以及無限元法在分析處理無限域和半無限域方的精確性和簡便性,為過程中圍巖的穩定性分析開辟了一條新的途徑。
  6. Secondly, in view of the limitation and shortage of traditional simulation of finite element approaches for bolt, a new composite grouted bolt element including nonlinear contacting relation will be built based on the above study of the mechanics mechanism of fully grouted bolt. then, an elastic - plastic finite element program will be developed for the analyses of tunnel stability, in which the composite grouted bolt element and nonlinear finite element analysis method will be used ; the patterns and the affect of main design parameters on the support effect of bolt will be analysed using the program, and conclusions of guidance importance for tunnel support design will be drawn. finally, simulation compution for the excavation and support of a highway tunnel will be made out using the above production, and the method of application of the program will be discussed ; analysis of the deformation, stress and distribution of plastic range will be done, and rational support plan will be worked out, which is of guidance importance for tunnel support design and the thery and technique of fully grouted bolt used in tunneling will be perfected further

    首先,本文在綜合分析穩定性影響因素及失穩破壞模式的基礎上,對全長粘結式砂漿錨桿用力學機理進行了深入研究,為全長粘結式砂漿錨桿的有限元模擬分析奠定了基礎;其次,針對傳統錨桿有限元模擬方法的局限性與不足,在上述全長粘結式砂漿錨桿用力學機理研究基礎上,建立出能反映界非線性粘結的新型復合砂漿錨桿有限單元模型;然後,運用上述復合砂漿錨桿單元模型,引進非線性有限元分析手段,開發了支護穩定性分析的有限元程序,並就全長粘結式砂漿錨桿的型式與設計參數對支護效果的影響進行了深入探討,得到了對支護設計具有指導意義的結論;最後,運用本文研究成果對某公路程實例進行了開挖與支護的模擬計算,探討了其應用方法,並就變形與應力及塑性區分佈規律進行了分析,從而提出了合理的支護方案,為支護設計提供了參考依據,完善了全長粘結式砂漿錨桿支護的理論與方法。
  7. Application study on stability analysis and treatment with blast - unloading for landslide

    核心土留設對隧道工作面穩定性的影響
  8. Distribution laws of stratum stress with working face excavation in subway tunnels

    城市地鐵隧道工作面開挖的地層應力分佈規律
  9. The field trial, on the k7 + 008 ~ k7 + 053 slope of the west approach at zhegu mount tunnel road 317, evaluates fully construction techniques and protection function of the ecological material

    選取國317線鷓鴣山西引k7 + 008 k7 + 063路塹巖質陡坡現場施試驗,全評價草種、生態基材在高寒氣候條件下的生態護坡功能及施方法和藝。
  10. Centrifuge model test technique preferably solves two problems : one is the gravity loss of the model soil, the other is the coupling problem between the seepage field of the ground water and the stress field of the stratum, which is a guidance for other deformation controls under the similar condition

    離心模型試驗技術較好的解決了在地下程研究中模型土體的自重損失和地層位移分析中地下水滲流場和地層應力場相互耦合用問題,對于在相似條件下富水地層開挖施如何控制地表沉降變形的研究方具有指導意義。
  11. By face failure and ground subsidence investigation and in - suit monitoring analysis in some lots of shenzhen metro phase line, especially of lot 3a in which two large ground landlides have occurred in construction, the reasons of ground subsidence are expatiated respectively from three aspects, including the characters of the physical mechanical parameters of stratum above tunnel, the monitoring analysis of stratum deformation and contruction technics causation

    通過對深圳地鐵期程土建施中全線部分暗挖標段出現的失穩、地表塌陷程實踐和現場監測結果分析,特別著重對連續2次出現地表塌陷的3a標暗挖研究,從上覆地層物理力學性質參數、地層變形監測分析及施藝原因3方闡述了地表塌陷的原因。
  12. On the base of site monitoring on several multi - arch highway tunnels, this paper introduces some site monitoring methods about the force of reinforcing steel bar, the exterior and interior strain of concrete and the displacement of the wall, which aim at the monitoring of middle wall of multi - arch highway tunnel

    在多座連拱現場監測的基礎上,文章主要介紹了主筋軸力量測、混凝土表應變量測、混凝土內部應變量測,以及位移量測等針對連拱中隔墻的現場監測方法,並結合中隔墻主筋軸力量剛,給出現場監測及分析實例。
  13. Face failure and ground subsidence caused by metro tunnel excavaton in weak watery stratum of shenzhen play an important role in metro construction because they influence the safety and time of construction and also lead to large loss of the whole project

    摘要深圳富水軟弱地層地鐵開挖中出現的失穩及由此引起的地表塌陷是地鐵安全施中極其重要的方,對施安全、進度都有較大影響,同時也對整個程造成巨大的經濟損失。
  14. This thesis pass through the laser delimitation instrument and the geological radar instrument means, to tunnel initial stages support and secondary structure. at past the research of tunnel lining thickness depend on opening dig figure, don " t consider the effect of tunnel lining inner figure. adopting the integrate method of the laser delimitation instrument and the geological radar could most exact reflect the change rule of tunnel lining thickness, but also could do lots unbroken examination, have very important for summing - up the rule of tunnel lining thickness change, and have very amplitude extend value

    本文通過激光限界儀和地質雷達綜合方法,對新建高速公路初期支護和二次襯砌混凝土內輪廓和厚度進行了檢測,對襯砌厚度的分佈規律以往的研究中,多以開挖和襯砌的輪廓變化為依據,並未考慮襯砌內輪廓的影響,而採用激光斷輪廓限界儀和地質雷達綜合方法能較為準確的反應襯砌厚度的變化規律,並且能夠無破損的做大量的檢測,為總結混凝土厚度的規律有很大用,並有極大的推廣價值。
  15. The famous project of gas transiting west to east and the cross - river tunnel of huangbu river in shanghai also will be constructed with this technique, which is under the plan. among the shield tunneling methods, up to now, earth pressure balanced shield tunneling ( epbs ) is the most universal type, and it is very certain that the epbs method adopt to our country increasingly. the key factor to success in epbs is converting the muck which is lack of fluidity excavated from the cutter face to the plasticity soil. but when the shied tunneling machine advancing, it is considerably difficult to reach this requirement because of the ground soil condition, which is consist of stiff clay, silt, weathered rock, and so on

    近些年來我國城市地鐵建設迅速發展,盾構施為一種安全而又環保的施方法得到了廣泛的使用,另外在黃浦過江,西氣東輸的穿黃程也在使用盾構技術。這其中土壓平衡式盾構在我國的使用最為普遍,成為地鐵技術的主流。土壓平衡式盾構施成功的關鍵是要將開挖切削下來的土體在壓力艙內調整成一種「塑性流動狀態」 。
  16. This paper discusses methods of transporting waste materials in shield tunnel construction and selection of transportation vehicles, which provides a reference for shield construction in china

    摘要對地鐵盾構法施的棄碴運輸方式進行了詳細分析,並結合施現場就運輸設備的選型了較為全的描述,為我國盾構機施提供了參考。
  17. The main work and innovation of the dissertation are listed as follows. 1. a new nat users - orinted ipv6 tunnel mechanism named silkroad is proposed

    論文的主要和創新點如下: 1 .提出了一種新的向nat用戶的ipv6技術,稱之為silkroad 。
  18. Special pattern design combined with new structure and strong carcass provides powerful trac - tion force, excellellent wearability and cutting resistance, is suitable for earth - mouer in mine, tunnel, quarrying plant and building site with long life

    獨特的花紋設計,使其具有強大的牽引力,優良的耐磨性和耐切割性,結構新穎,胎體堅固,適用於鏟運機在礦山、和採石場及建築地等較差路業,自潔性好,壽命長。
  19. It is clear that the existing short overrun tunnel east of hong kong station was a compromise solution to reclamation phasing problems and is not adequate to meet safety and operational requirements for improved service levels

    -香港站東現有較短的掉頭,明顯地只是為遷就填海分期施出的權宜之計,在服務水平提升后,並不足以應付安全和運兩方的要求。
  20. To the issues that ipsec ca n ' t work with nat and multicast very smoothly and ipsec could n ' t also solve qos problem, combined with the national high - tech project of 863, the author has put forward the following viewpoints in the research of the security architecture model of ip layer : as to ipsec ' s working with nat, the author has proposed a scheme of using udp encapsulation along with configuring ipsec tunnel by dhcp and substituting ah with esp null encapsulation ; as to ipsec ' s working with the multicast, the author has proposed that combined with key management using complete binary tree, ipsec security process using espv3 and ahv2 can cooperate with multicast smoothly in multicast environments ; as to solving qos, the author has proposed a scheme of using two - level classifying and two - level scheduling with encryption scheduler and forwarding scheduler. the author has pointed out that combining ipsec with pki can make ipsec more flexible and more practical. based on the previous researches, the author has made an analysis of security risks of ip layer

    在ip層安全體系結構模型研究中,針對ipsec在與組播、 nat協同等方存在的問題以及ipsec不能很好解決qos等方的問題,者結合國家863高技術項目的研究提出了解決方案:在nat協同者提出了採用udp封裝、配合使用dhcp配置ipsec並用espnull封裝代替ah的方案;在與組播協同者提出了基於espv3和ahv2的ipsec組播安全處理以及基於完全二又樹的組播密鑰管理的方案;在解決qos問題方者提出了採用分類器1和分類器2的兩級分類以及具有加密調度器和轉發調度器的兩級調度的技術方案;同時者提出了ipsec與pki技術緊密結合,能使ipsec安全通信更加靈活和方便實用。
分享友人