隧道防排水 的英文怎麼說

中文拼音 [suìdàofángbèishuǐ]
隧道防排水 英文
tunnel water handling
  • : Ⅰ名詞1. (隧道; 地道) tunnel; underground pass2. [書面語] (道路) road3. (郊外的地方) suburbsⅡ動詞[書面語] (旋轉) turn
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • : Ⅰ動詞(防鷥) provide against; defend against; guard against Ⅱ名詞1 (防守; 防禦) defence 2 (堤...
  • : 排構詞成分。
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • 隧道 : tunnel; tunneling; tunnelling; chunnel; drive
  • 排水 : drain off water; drain away water; dewatering
  1. In view of the natural conditions in loess area of gansu, in the light of investigation conditions of seepage of built loess and weak rock highway tunnels in this area and classification of water gushing conditions for railway tunnels, and by engineering analogism, the classification of tunnel water gushing types suited the structure design of highway tunnel waterproof and drainage, and the three methods for checking and subdividing water gushing types are presented

    摘要針對甘肅黃土區的自然條件,依據該地區已建黃土及軟巖公路滲漏調查情況和鐵路隨狀態分類,運用工程類比法提出適合該地區公路隧道防排水結構設計的類型劃分及對涌類型校核與細分的三種方法。
  2. Secondly, it brings forward that it is a practical technical and structure mode to use the multiple preventing layer as the water preventing and draining system in highway tunnel of loess

    然後在總結現有公路隧道防排水技術特點的基礎上,提出了黃土公路隧道防排水系統宜採用復合層為主的適用技術與結構型式,得出了一些有益的結論。
  3. Technical code for waterproofing and drainage of railway tunnel

    鐵路隧道防排水技術規范
  4. It is applied to drill heavy duty pretension anchor holes at side slope of water power station, railway or highway projects, to drill drainage holes and grouting pile holes on roof of tunnel gallery

    適用於電站鐵路公路邊坡大噸位預應力錨固孔口管棚孔的施工,以及預滑坡巖石坍塌等地質災害治理工程。
  5. The conclusion is that the extrusion presses between primary and secondary linings, elasticity of the waterproof layer and unblocked drainage layer are the vital factors influencing the waterproof layer of spraying - on acrylate membrane in tunnel composite linings

    試驗結果表明,襯砌間的擠壓應力、層的彈性恢復能力、通暢的層對丙烯酸鹽噴膜層在復合式襯砌中的效能發揮重要作用。
  6. In order to solve some technique problems of waterproof and drainage of tunnels based on controlling drainage, model tests, numerical simulations and site investigations were performed by use of two cases longtan tunnel and baiyun tunnel

    摘要針對控制放的隧道防排水技術中一些關鍵問題,以龍潭和白雲為依託,採用模型試驗、數值模擬、現場調查等方法進行了系統研究。
  7. Design and construction of waterproofing and drainage utilizing combined lining at yanlieshan tunnel of jiujiang - jingdezhen road

    九景公路雁列山復合式襯砌的設計與施工
  8. The stability of lining structure and rock of tunnels should consider the action of external load. however, there is no theoritical basis for all this at present time

    按「控制」原則來設計隧道防排水襯砌結構受力和圍巖穩定性影響宜考慮外荷載的作用,然而現行設計規范尚沒有這方面的理論和依據。
  9. The waterproof and dewatering technology in the arch dam tunnel along shao - huai highway

    邵懷高速公路拱壩隧道防排水施工技術
  10. Waterproof and drainage design of access gallery in pushihe pumped - storage power station

    蒲石河抽蓄能電站交通隧道防排水設計
  11. Discussed shallowly the tunnel guards against the dewatering excavation design and construction main point

    隧道防排水工程設計與施工要點
  12. Prevent drainage construction technic and the prevention and cure step to common fault of twin - tunnel

    雙聯拱隧道防排水施工技術與通病治措施
  13. Synthetic construction technology of waterproofing and drainage for a double - arch tunnel on beijing municipal railway

    北京城市鐵路雙連拱隧道防排水綜合施工技術
  14. Research on reasonable section configuration of waterproofing and drainage in loess and soft surrounding rock road tunnel

    黃土軟巖公路隧道防排水合理結構型式研究
  15. Especially at the zone which has abundant water and carbonate rock in west china, owing to an inappropriate principle of the drainage and waterproof, water resource is running out and environment is worsening

    特別是在我國西部巖溶富地區,由於採取的隧道防排水原則不恰當,引起資源流失和環境惡化問題更為突出。
  16. The middle wall of a double - linked - arch tunnel is the key component of the structure ; it also has a great influence on waterproof and drainage of the tunnel, so it is very important to select the proper from of the middle wall

    摘要雙連拱的中墻是結構受力的關鍵構件,又對隧道防排水有較大影響,因此,合理選用中墻形式至關重要。
  17. Panel board, lighting, waste drainage, hydrant, fire alarm system

    :開關箱、照明、、消箱、火災偵測系統。
  18. Up to now, the drainage and waterproof system design of most railway tunnels in china did n ' t consider the action of external water load, based on the principle of unlimited drainage, so a great number of railway tunnels have the problem of leakage water, some of which are very serious

    到目前為止,我國大部分鐵路隧道防排水設計主要按「無限制」 、尚未考慮外荷載的作用,按這樣的原則設計隧道防排水存在許多缺陷,有「十九漏」的說法,帶來了很多嚴重問題。
  19. Water proofing and drainage construction technology of double - arch tunnel

    巖峰雙連整體式施工技術
  20. This paper states on the problems in water preventing and draining of highway tunnel of loess in gansu province and near area. firstly, it discusses the method to analyze and calculate the affect of groundwater characteristic, estiniate of tunnel water quantity and the varying of water contained in loess to the stability of surrounding rock mass according to the principle of groundwater leaking, hydraulic penetrating principle, groundwater dynamic law, groundwater flowing modulus low and so on

    本文針對甘肅省內外部分黃土公路隧道防排水方面存在的問題,首先根據黃土層地下運規律,按力學滲流原理並應用地下動力學法和地下徑流模數法等方法,探討了黃土層地下情特性、滲透涌量估算和對圍巖穩定性影響的分析計算方法。
分享友人