隨挖隨填土方 的英文怎麼說

中文拼音 [suísuítiánfāng]
隨挖隨填土方 英文
cut and cover
  • : Ⅰ動詞1 (跟; 跟隨) follow 2 (順從) comply with; adapt to 3 (任憑; 由著) let (sb do as he li...
  • : 動詞(用工具或手從物體的表面向里掘取) dig; excavate; scoop
  • : 動詞1. (墊平或塞滿) fill; stuff 2. (補足; 充滿) replenish; supplement; complement 3. (填寫) fill in; write
  • : Ⅰ名詞1 (方形; 方體) square 2 [數學] (乘方) involution; power 3 (方向) direction 4 (方面) ...
  1. This is why a special tunnelling machine capable of excavating through both soft ground as well as hard rock was used. without this machine, the tunnelling would have to be done by cut - and - cover method, causing major traffic and environmental disruption. with this tbm, all these impacts can be avoided

    故此選用這臺既可在軟又可在硬石層運作的隧道鉆機,避免以明法開鑿隧道,免卻對交通及環境造成嚴重影響。
  2. In the simulation and analysis on culvert construction, the method of foundation - pit excavation layer by layer and step by step was used, i. e. the method that makes the surface of excavation have no stress, when the elements were excavated gradually in period of construction. at this process, the state of soil is unloading, the laws of stress field and displacement field with the depth of excavation were studied. based on the obtained stress field and displacement field after the excavation was completed, by using of the newly increased filling - elements " gravity and the grinding force, the simulation of the construction of body of the culvert and foundation - pit ' s filling layer by layer had also been done in this dissertation

    用有限元法模擬分析涵洞基坑開時,採用分層、分步模擬開過程的法,即將計算域內單元分層「去」 ,使開表面成為無應力表面的法,分析體在卸載狀態時的應力場和位移場深度的變化規律;在洞體施工后,回體時,據開完成時的應力場、位移場,通過逐級增加計算域內的單元數目,施加每級新增加單元的自重荷載,利用有限元法模擬基坑及上覆體分層築的施工過程,這不僅反映體處于再加載應力狀態時,受力及變形的一般規律,而且這種將地基? ?涵洞? ?體作為一個統一整體進行模擬的法,量化了三者之間的相互作用關系。
分享友人