隨機輸入測試 的英文怎麼說
中文拼音 [suíjīshūrùcèshì]
隨機輸入測試
英文
random input testing- 隨 : Ⅰ動詞1 (跟; 跟隨) follow 2 (順從) comply with; adapt to 3 (任憑; 由著) let (sb do as he li...
- 機 : machineengine
- 輸 : Ⅰ動詞1 (運輸; 運送) transport; convey 2 [書面語] (捐獻) contribute money; donate 3 (失敗) l...
- 入 : Ⅰ動詞1 (進來或進去) enter 2 (參加) join; be admitted into; become a member of 3 (合乎) conf...
- 測 : 動詞1. (測量) survey; fathom; measure 2. (測度; 推測) conjecture; infer
- 試 : 名詞(古代占卜用的器具) astrolabe
- 隨機 : random stochasticrandom
- 輸入 : 1 (從外部送到內部) import 2 [電學] input; entry; entering; in fan; fan in; 輸入變壓器 input tra...
- 測試 : test; testing; checkout; measurement
-
Firstly, the experimental phase current and input power data obtained from load test are employed to estimate the parameters in ii rated condition. then, the phase current and input power data in locked rotor condition are used to track the variation of the parameters of the secondary coil with slip frequency. the classical method and the direct modification method are also used to estimate the parameters of the induction machine in comparison with this technique
首先利用了負載試驗的定子電流和輸入功率數據來識別額定工況下的電機參數,然後又使用了堵轉時的定子電流、輸入功率數據來識別電機二次繞組參數隨轉差頻率的變化,並與傳統參數測試方法和直接修正參數法進行了比較。When the data of logistics in current process are used for input of simulating logistics in future 100 % continuous casting process, supply of hot metal from iron - making process may not satisfy the needs of 100 % continuous casting on raw materials. because planning scheme in continuous casting process depends greatly on smelting scheme in convertor vessel, it is important for operator to balance raw materials supply, smelting and casting in order to realize the scheme of 100 % continuous casting. when some equipment are work abnormally, mixer of hot metal and lf furnace can be used for logistics buffer
用攀鋼煉鋼生產數據對模擬軟體系統進行的測試和模擬研究結果表明:模擬系統的隨機數發生演算法可以實現對作業時間的依分佈隨機抽取;在相似的輸入條件下,模擬結果與實際生產物流的時間分佈規律基本吻合,達到了模擬軟體設計的預期目標;若以攀鋼提釩煉鋼廠現工藝的鐵水輸入作為全連鑄后的輸入條件,則現工藝的物料供應能力可能難以滿足全連鑄生產的要求;連鑄機的連澆計劃對轉爐爐次計劃的編制有很高的要求,合理安排來料、煉鋼與澆鑄三者間的物流平衡關系將是保證全連鑄作業的重要條件;當出現設備異常情況時,可以利用混鐵爐與lf爐站前等待作為物流緩沖池,通過延長系統的平均物流時間來緩解因設備檢修和故障等擾動所造成的影響,確保生產的順利進行。The acceleration time process of road surface plainness is got by using two integral calculus of the acceleration time process which is measured by five - wheel equipments. this data is worked as the input of the road surface for theoretical calculation. the result of experiments mostly fits that of calculation, and then the multiple - acceleration power spectrum distribution of the artillery and tractor are acquired
在瀝青路面、破損鋪磚路和砂石路面上以不同速度進行了平穩隨機激勵牽引試驗,用五輪儀測量得到的加速度時間歷程進行兩次積分的方法得到路面不平度的時間歷程做為路面輸入進行對應的理論計算,試驗結果和計算結果基本相符,得到了火炮和牽引車多個加速度功率譜分佈。With development of high - speed missile imaging detection aero - optical effects, certain accomplishments on theoretical analysis have been obtained. the laboratory test system needs to be built to vertify the correctness and validity of theory. at the same time, to study the transient influence of high - speed flow on image transmission, an aero - optical effect experiment of wind tunnel is needed furtherly on the foundation of the transform of wind tunnel, in order to use the researching accomplishment of aero - optical effects in the aero - optical distortion image adjustment evaluation
隨著高速導彈成像探測氣動光學效應機理研究工作的深入開展,在理論分析上取得了一定的成果,需要搭建實驗室試驗系統來驗證理論的正確性和有效性,同時為了較真實地研究高速流場對圖像傳輸的瞬態影響效應,需要在風洞改造的基礎上進一步進行氣動光學效應風洞試驗,期望將獲得的氣動光學效應研究工作成果用於氣動光學畸變圖像校正效果的評估。Abstract : the most critical task in designing a model based on predictive controller is identifying a reasonably good process model. the identification model of mould level of a continuous casting line in a steel plant is very difficult. due to the extremely high stochastic disturbance level, well - known parametric identification methods using random step function, prbs or stochastic test inputs are not successful. the present method based on orthogonal test inputs gives satisfactory results
文摘:在設計一種基於預測控制器模型時,最關鍵的工作是識別一個合理可靠的過程模型.在鋼鐵廠的連續鑄造線上識別鑄模液位模型是很困難的,由於極高的隨機干擾水平,使得眾所周知的隨機階躍函數, prbs或隨機試驗輸入等參數識別方法都以失敗告終.而本文介紹的基於正交檢測的方法給出了令人滿意的結果分享友人