電壓應力坡 的英文怎麼說

中文拼音 [diànyīng]
電壓應力坡 英文
voltage-stress gradient
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : 壓構詞成分。
  • : 應動詞1 (回答) answer; respond to; echo 2 (滿足要求) comply with; grant 3 (順應; 適應) suit...
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • : Ⅰ名詞(地面傾斜的地方) slope Ⅱ形容詞(傾斜) sloping; slanting
  • 電壓 : voltage; electric tension; electric voltage
  1. Depending on how the ground surface is denuded, the feature of the current crustal stress field and rock stress environment can be calculated analyzing the result in this paper : by analyzing the recovering feature of the elastic deformation of the rockmass in unload - stage under various pressures, it has been found there is close relationship between the recovering degree of the elastic deformation of the rockmass and the unloading degree of the pressure the direction of the major principal stress in the crustal stress field is not consistent with the direction of the crushing stress regional tectonics borne during the last tectonic movement. the evolving degree of the regional geomorphology evidently affects the current crustal stress field, which changes from the self - weight stress field to the horizontal stress field, with the changing of the eroding degree of the regional geomorphology ranging from valley area to hilly country to flat country. in valley area, where there is two stress belts, the bankslope s tress belt and the self - weight stress belt within the mountain. the direction of the major principal stress is nearly parallel to the ground surface and inclines towards the valley in the bankslope stress belt. it is nearly vertical in the self - weight stress belt

    通過本文的研究成果,根據區域性地貌的演化特徵,我們可以大致地對現今地場進行判斷:在分級卸荷條件下,巖體中彈性變形的恢復具有明顯的規律性,這種規律對于研究地場的演變是有幫助的;地場中最大主方向與區域構造形跡在最近的構造運動中所受區域性擠的方向無明顯的對性;區域性地貌形態的演化程度對現今地場的特徵具明顯的影響,隨著區域性地貌侵蝕程度由峽谷區、丘陵區、平原區的變化,現今地場特徵由自重場、水平場為主含少量自重場特徵向水平場的規律變化;在峽谷區,山體中具有兩個帶:自重帶和卸荷帶,最大主方向在卸荷帶中近平行於面並傾向于河谷、在自重帶中近於直立;根據原始地面遭剝蝕的程度,可以大致地估算最大主和中間主的量值和方向;在丘陵區和平原區,最大主的方向近於水平,並與附近區域性侵蝕盆地和河流的展布方向基本平行,根據原始地面遭剝蝕的程度,可以大致估算其最大主的量值;根據區域性地貌形態的特徵來分析工程區的現今地場特徵,並進而大致了解巖石的環境,這種分析方法得出的結論與許多實際的地測試成果基本一致,對于大型水工程地下廠房和隧洞的設計是有所幫助的。
  2. Besides, parker is also a famous supplier for refrigeration and air conditioning components including all kinds of sporlan products, such as mechanical and electric expansion valves, solenoid valves, filter driers, sight glasses, level master liquid controls, mechanical and electric pressure regulating valves, check valves, shut off valves, oil separators, and other industrial valves for r717 etc

    除此之外,派克漢尼汾還是一家全球著名的冷凍與空調另部件的供商,其中包括美國斯蘭生產的各種產品,如,機械的和子的膨脹閥,磁閥,乾燥過濾器,視鏡,液位控制器,機械的和子的調節閥,單向閥,截止閥,油分及工業用氨閥等等。
  3. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水學、高邊穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發機組的科學研究。
  4. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水學、高邊穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發機組的科學研究。
  5. It is also used to prevent or solve geologic calamity, such as landslide and rock collapse etc. in addition, it is also used to drill small size water well and hige - pressure jet grouting hole

    適用於水站鐵路公路邊大噸位預錨固孔排水孔的施工,以及預防滑巖石坍塌等地質災害治理工程。也適用於小型水井的施工高旋噴引孔的施工。
  6. It also used to prevent or solve geologic calamity, such as landslide and rock collapse etc. in addition, it is also used to drill small size water well and high - pressure jet grouting hole

    Yg - 80a鉆機適用於水站工程鐵路公路邊大噸位預錨固孔排水孔的施工,以預防滑巖石崩塌等各類地質災害治理工程也適用於小型水井鉆高旋噴引孔的施工。
分享友人