露天礦測量 的英文怎麼說

中文拼音 [lòutiānkuàngliáng]
露天礦測量 英文
opencast survey
  • : 露動詞[口語] (顯露; 表現) reveal; show
  • : 名詞1. (礦床) ore [mineral] deposit 2. (礦石) ore 3. (開采礦物的場所) mine
  • : 動詞1. (測量) survey; fathom; measure 2. (測度; 推測) conjecture; infer
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  • 露天 : in the open; open-air; outdoors
  • 測量 : measure; survey; gauge; meter; measurement; measuring; surveying; mensuration; metering; gauging;...
  1. Measurement of the deformation of abandned adit pass at pit bottom caused by surface blasting

    爆破對采場底部廢石平硐溜井影響的變形
  2. Abstract : the application of pc - e500 microcomputer in conducting wire management of the slope in open - pit mine was introduced

    文摘:介紹在邊坡的導線中,應用pc - e500微機進行觀記錄、平差計算及內業成果整理的程序編制。
  3. Aiming at various problems that exist management system of ore blending in open - pit and actual production in sandaozhuang open - pit, this thesis brings forth the ore blending ' s method making use of the linear program and gets a total the strategy to the ore blending. this thesis, in specific operation, adopts a simplification model with ore blending. the primitive data of ore blending direct come from measuring

    本論文針對目前管理系統中存在的各類問題以及三道莊的生產實際,提出了先採用線性規劃配原理配,得到一個總體配策略,然後再採用一個簡化配模型來處理,其中配原始數據直接從爆堆中獲取,保證了數據的準確性和快捷性。
  4. Influence of two points forward intersection method in surface mine acceptance measurement accuracy

    兩點前方交會法對山驗收精度的影響
  5. Application of the combined operating mode of the gps and the surveying robot in deformation monitoring of an open - pit

    機器人聯合作業模式在變形監中的應用
分享友人