靜水應力 的英文怎麼說

中文拼音 [jìngshuǐyīng]
靜水應力 英文
hydrostatic stress
  • : Ⅰ形容詞1. (安定不動; 平靜) still; calm; motionless 2. (沒有聲響; 清靜) silent; quiet Ⅱ名詞(姓氏) a surname
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 應動詞1 (回答) answer; respond to; echo 2 (滿足要求) comply with; grant 3 (順應; 適應) suit...
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  1. This method applies the extended strip theory to establish the nonlinear ship motion equations in regular head seas, obtains stable time course by resolving in time domain, and then pressure vectors will be available. the pressure includes static pressure, incident waves pressure, diffraction pressure, radiation pressure, and wave impact pressure, and changed with instantaneous draft of each intersection

    該方法用擴展的切片理論建立迎浪規則波中船舶非線性運動方程,通過時域步進求解獲得船舶剛體運動的穩定時歷,進而給出與船體各橫剖面瞬時吃相對變化、入射波壓、繞射壓、輻射壓和波浪沖擊壓諸分量。
  2. In this paper, the finite - element numerical analysis calculation is applied to the foundation of high - rise and multi - floor building and the evolvement law of stress and displacement of tunnel used by urban traffic to explore the mutual influence between the wall rock of underground space and high - rise building foundation, taking account of the specific construction situation in the " sanmu garden " project in dadukou district in chongqing, from the perspective of underground space static - force structure stability analysis to open a underground tunnel with 6m in span and 7. 5m in height for track traffic 20m below the surface. this paper, taking considerations of three different states, i. e. the natural state without any artificial interference, the state of high - rise buildings on the surface, and the underground tunnel state with excavation for track traffic, and four plane lines and four vertical lines, analyzes and studies the distributing law of stress and displacement of calculation section from the following aspects : ( 1 ) the main stress vectorgraph, displacement distribution graph ( ux, uy ) and chromatogram graph of stress isoline ( 1, 2, xy ) of section under different states ; ( 2 ) the contrastive distribution curve of stress ( 1, 2, xy ) of different plane and vertical lines under the same state ; ( 3 ) the contrastive distribution curve of stress ( 1, 2, xy ) of the same plane and vertical lines under different states, wishing to provide references for underground space utilization and project designing and construction of the tunnel under high - rise buildings in the future

    本文結合重慶市大渡口區「三木花園」開發建設項目,從地下空間結構穩定性分析角度出發,針對在該項目中涉及的高層和多層建築物以及在其地下20米處開挖了一個用於軌道交通的跨度6米,高7 . 5米的地下隧道這一具體工程情況,採用2d - 3d -有限元結構分析程序對高層與多層建築物的地基基礎及其與城市軌道交通使用的地下隧道圍巖的與位移演變規律進行了有限元數值分析計算,探索了地下空間圍巖與高層或多層建築物地基基礎之間的相互影響,通過考慮未受到任何人為擾動影響的天然狀態、地表存在多層或高層建築物狀態和地下開挖用於軌道交通的地下隧道狀態等三種不同狀態以及4個平剖線和4個垂直剖線等不同情況,從以下幾個方面具體分析研究了計算斷面的與位移分佈規律: ( 1 )在各種不同狀態下計算斷面的主矢量圖、位移分布圖( ux 、 uy )以及等值線色譜圖( _ 1 、 _ 2 、 _ ( xy ) )等; ( 2 )相同狀態下不同平與垂直剖線的_ 1 、 _ 2和_ ( xy )對比分佈曲線; ( 3 )不同狀態下相同平或垂直剖線的_ 1 、 _ 2和_ ( xy )的對比分佈曲線等,為今後在對地下空間的開發利用以及在高層建築物地下開挖硐室時的工程設計和工程施工提供參考依據。
  3. The main content of this article includes : " ( l ) the planar non - linear and viscid - elastic static mechanical analysis is used to analyze and calculate the md in service. ( 2 ) the planar nonlinear static mechanical analysis of the stress and deformation is used to analyze the med in banking, which is banked to the height of 140m

    主要研究工作有: ( 1 )茅坪溪防護大壩完建和蓄時的和變形的分析計算:對完建和蓄時壩體的和變形進行平面非線性分析計算和平面粘彈性分析計算,對分析計算結果作出結論。
  4. This paper establishes a model simulating dam actual placing process and considering the non - continuity of initial temperature on the boundary of new and old concrete, daily air temperature change, concrete - placing temperature, hydration heat, heat insulation on boundary, water - storing process, placing intermission and curing with water. the calculation of stress field considers the concrete weight, static water pressure, thermal stress, different autogenous volume change between rcc and normal concrete, change of elastic modulus of concrete with age and creep action

    考慮了乞今最為全面的初始條件和邊界條件,包括模擬壩體的實際升程過程,考慮了新老混凝土接觸面上的初始溫度不連續,逐日的氣溫變化,混凝土的入倉溫度,化熱溫升,邊界保溫,庫蓄過程,澆築間歇以及灑養生等因素;場的計算考慮了混凝土的自重,,溫度,常態混凝土與碾壓混凝土不同的自生體積變形,混凝土的彈性模量隨齡期的變化以及徐變的作用。
  5. Based on the result of the comparision static penetrat ion test and field vane shear test before and after the treatment of soft founda tions for a experimental section, and based on four static loading tests for two single piles and two composite foundation, behaviors of soil among piles before and after the construction of powder - spray piles and the pattern of the ch ange of the stress ratio between piles and soil are studied, a new determination met hod for bearing capacities of cement powder - spray piles and composite foundati on is proposed, and the formula for calculation of composite foundation bearing capacity are revised

    基於某試驗路段軟基處理前後觸探、十字板試驗的對比測試和對兩根單樁、兩處單樁復合地基進行的4次載試驗,研究了樁間土性狀在施工泥粉噴樁前後的變化和樁土比的變化規律,提出了根據載試驗確定粉噴樁及其復合地基承載新的取值方法,並修正了復合地基承載的計算公式。
  6. Abstract : based on the result of the comparision static penetrat ion test and field vane shear test before and after the treatment of soft founda tions for a experimental section, and based on four static loading tests for two single piles and two composite foundation, behaviors of soil among piles before and after the construction of powder - spray piles and the pattern of the ch ange of the stress ratio between piles and soil are studied, a new determination met hod for bearing capacities of cement powder - spray piles and composite foundati on is proposed, and the formula for calculation of composite foundation bearing capacity are revised

    文摘:基於某試驗路段軟基處理前後觸探、十字板試驗的對比測試和對兩根單樁、兩處單樁復合地基進行的4次載試驗,研究了樁間土性狀在施工泥粉噴樁前後的變化和樁土比的變化規律,提出了根據載試驗確定粉噴樁及其復合地基承載新的取值方法,並修正了復合地基承載的計算公式。
  7. Reliability assessment of xi - luo - du underground water - power plant : the results have been used by the cheng - du surveying, design and research institute for the preliminary design ; ( 2 ) the stress and strain analysis for the xiao - guan - zi sluice and its foundation : the report has been applied for the reinforcement of the foundation ; ( 3 ) the thermal control procedure for the no. 7 - 14 power plant dam segments of the three gorge project : the research report provides the effective and efficient methods for the controlling of the temperature field in the mass concrete structure ; ( 4 ) the software system development for the long - term monitoring for dikes : the software can automatically give the results of the seepage field and the probability of soil piping of dikes and underground ; ( 5 ) reliability assessment of xiang - jia - ba underground water - power plant : the results have been used by the zhong - nan surveying, design and research institute for the preliminary design ; ( 6 ) fatigue reliability estimation of shipping berthing pillar : the results give the optimized design scheme and prediction of the structural age ; ( 7 ) 3 - d static and dynamic stochastic finite element analysis for the strength, stability and thermal control problem for xi - luo - du project

    溪洛渡電站超大型地下洞室群圍巖穩定的安全可靠性分析:被成都勘測設計研究院用於比選報告及可行性論證中; ( 2 )小關子電站攔河閘壩及地基的變分析:被成都勘測設計研究院用於地基加固處理方案; ( 3 )三峽廠房7 # - 14 #壩段溫控並縫措施研究:為廠房壩段並縫方案的可行性提供了依據; ( 4 )堤防工程體系的長期監控預報預警決策系統開發:為監控、預測預報堤防滲漏管涌破壞提供分析軟體; ( 5 )向家壩地下洞室群圍巖穩定的安全可靠性分析:被中南勘測設計研究院用於初步設計方案中; ( 6 )靠船墩的疲勞可靠度研究:為廣東航運規劃設計院的靠船墩優化設計和加固提供依據; ( 7 )溪洛渡高拱壩壩體壩基(壩肩)強度和穩定的三維隨機有限元分析及可靠度計算:為溪洛渡重大工程壩體的安全穩定性及溫控方案提供依據。
  8. Saturated sand are testes in the laboratory under the undrained cyclic loading condition with static - dynamic dual purpose triaxial compression test apparatus, which is designed under the cooperation of hohai university and marui co. ltd japan. the results indicate that the stress path approaches from a initial stress point to the failure lines as cyclic loading goes on, and eventually converges on a certain limiting stress path in the vicinity of the failure lines. the stress - strain curve, however, does not converge on a closed hystersis loop ; the shear strain rapidly increases in looser sand or gradually and continually increases in denser sand

    利用河海大學與日本圓井株式會社共同研製的新型的多功能動三軸儀進行了飽和砂土循環扭剪不排試驗,研究表明,對于松砂,剪變幅度快速地由微小增加到百分之幾甚至百分之十幾,對于緊砂,剪變幅度逐漸地由微小增加到百分之幾甚至百分之十幾;經試驗初步研究表明用初始有效平均正歸一化的有效路徑很好的一致性。
  9. In lights of the calculation of stress field of water pressure, the stress caused by water is utterly small in contrast to earth stress field, so it cannot directly induce large reservoir

    通過對場的分析發現,載引起的場相對于大地場來說微不足道,它不可能直接誘發較大的庫地震。
  10. The collapsible loess is often met during the construction of the high - grade highway in the loess area, and the main failure is the uneven subsidence of the roadbed and the culvert, which affects the safe usage of the roadbed and the culvert, etc. directed against this, based on the chankou - lanzhou freeway construction, the paper analyzes the application of the composite ground formed by lime - soil pile under the bridge and designs the project, discusses the rules of the contact pressure, the stress ratio of the pile and the soil, compares the p - s curves of one pile, the composite ground formed by one pile and the composite ground formed by two piles based on the in - situ plate loading test, evaluates the bearing capacity of the composite ground of the project

    黃土地區的高等級公路建設中經常遇到濕陷性黃土問題,其病害類型主要是地基土受浸濕后引起路基、橋臺、涵洞等的不均勻沉降,直接影響路基、構造物等的正常使用。針對此問題,本文依託甘肅讒口至蘭州柳溝河高速公路建設工程,對橋基灰土樁復合地基用的可行性進行了深入分析,根據具體工程進行了合理的設計與計算,並配合現場載荷試驗及壓盒實測數據,探討了基底分佈規律,樁土比,變形模量的變化關系,對比分析了單樁、單樁復合和雙樁復合的p ? s關系,對橋基灰土樁復合地基承載進行了整體評價。
  11. Based on in - situ investigation, indoors soil tests, data process and calculation analysis for chunhua reservoir, this article acquires the distributing regulation and physical & mechanical properties for each layer soil below the dam base, and further determines typical model cross sections for static & dynamic stress deformation analysis

    本文根據對純化庫進行的現場勘察、室內土工試驗、室內資料處理、計算、分析獲得了壩基以下各土層的分佈規律及物理、學性質指標,進而確定、動變形分析的典型斷面。
  12. Based on mechanics of fracture, and regarding thermal stress caused by temperature difference and static hydraulic pressure caused by fracture water as the main factors, the forecast of collapse period of dangerous rock is researched through different combination forms of fracture types, then a way to calculate collapse period of dangerous rock is provided

    摘要以斷裂學為基礎,以溫度差引起的熱及裂隙引起的為主要影響因素,通過不同的斷裂類型組合形式研究了危巖垮塌的周期,提供了一種計算危巖垮塌周期的方法。
  13. The static and dynamic 3 - d finite element analysis for the intake tower shown that the stability and stress of the stucture satisfy the specification

    對進塔結構進行、動計算研究結果表明,其穩定、均滿足要求。
  14. The result indicates that the maximum stress on the runner is mainly in proportion to the turbine output

    結果表明在大部分工況下該轉輪葉片最大基本上與輪機功率成線性關系。
  15. In this project, the maximum height of the dam is 81m, but the deep overburden in the riverbed has the depth of 147. 95m which is about two times of the maximum height of the dam body, so the seepage and liquefaction prevention of the dam foundation becomes the key and important problem in the design of the dam project. the static stress and deformation under three different projects - horizontal blanket project, clay core project and asphalt core project - for the dam is analyzed comprehensively. the damage that may be induced by variable factors on the dam body in time of engineering completion and water impounding operation period is seriously studied

    其次,將這一模型用於分析下坂地利樞紐工程,由於該工程河床覆蓋層深度最深達147 . 95m ,是壩體高度的近兩倍左右,壩基的滲流和液化成為壩體安全主要問題,本文對該壩的三種設計方案即平鋪層防滲方案、粘土心墻防滲方案及瀝青心墻防滲方案的位移及壩體在竣工期、蓄期等各個階段可能產生的破壞進行了認真研究。
  16. The permanent displacement caused by accumulated damage is calculated in equivalent joint - force method, while the way to calculate the equivalent joint - force is consummated, both in the equivalent joint - force method of horizontal face and maximal static shear stress face

    而多點輸入由累積損傷引起的永久位移可採用等價節點法,平面和最大面兩種等價節點法中等價節點的計算方法都在本文得到完善。
  17. Hydrostatic state of stress

    靜水應力狀態
  18. Considering cavitation and the coupling of solid and fluid, the structure responses caused by combination of underwater explosion and hydrostatic pressure are simulated through modeling shell structure and its outer water

    通過對殼體結構及外部域進行建模,並考慮流固耦合及空泡因素,模擬出結構受下爆炸載荷及聯合作用下的響
  19. The study sets up 3 - d definite element models in terms of the seismotectonics of danjiangkou reservoir area. the models use drucker - prager yielded criterion to stimulate material property, which consider the influences of average stress and the second main stress on material strength

    本文則根據丹江口庫區的地質構造建立了三維有限元模型,採用drucker - prager屈服準則模擬巖石特性,即考慮了對材料屈服強度的影響,又考慮了中間主的影響。
  20. In this paper, a pump auto piping concrete made by some company is used as an object of study, and tbs - 2000 strain measuring system is used to measure the pump in the way of dynamic stress, statistic stress and proper frequency

    本論文以某公司生產的泥混凝土泵車為研究對象,採用tbs ? 2000變測試系統對該泵車進行了動、測試及固有頻率測試。
分享友人