預凝器 的英文怎麼說

中文拼音 [níng]
預凝器 英文
precondenser
  • : Ⅰ副詞(預先; 事先) in advance; beforehand Ⅱ動詞(參與) take part in
  • : 動詞1. (凝結) congeal; curdle; coagulate 2. (注意力集中) fix
  • : 名詞1. (器具) implement; utensil; ware 2. (器官) organ 3. (度量; 才能) capacity; talent 4. (姓氏) a surname
  1. Condensate from the first-effect calandria is used for preheating the feed.

    一效列管換熱中出來的冷液被用來熱進料。
  2. From simulations and data of fire site, most air preheater fire often appear when boiler is started in cool state and standby which fuels of insufficient combustion coagulate and congregate on the parts of air preheater. when the temperature of smoke inpouring air preheater increases, aggregate fuels and sediments will combust in stated temperature conditions. it is called the second combustion of air preheater

    這些起火起因於燃料油的不充分燃燒,其結果是未充分燃燒的燃料油結和聚集在空氣的部件上,當進入空氣的煙氣溫度增高時,沉積的燃料油被烘烤,當達到一定溫度條件時,則可點燃這些燃料油污沉積物,造成火災發生,這通常被稱為空氣的二次燃燒。
  3. By using 5000kn pressure - bent testing machine, the specimens of boulder concrete and crushed stone concrete were tested through three - point - bending method and wedge - split tensile method, the scale division of the index dial of pressure - bent testing machine is larger, whereas the predicted test - load is lesser, so the velocity of exerted load is controlled through observing the reading of the multimeter which is connected with the collecting systerm in order to continuously exert test - load

    本文使用5000kn壓彎實驗機,對不同強度等級的卵石混土和碎石混土試件分別進行了三點彎曲試驗和楔入劈拉試驗。試驗過程中,由於實驗機噸位較大,而試驗荷載計較小,為了能夠有效地控制加載大小和加載速度,採用通過觀察與荷載傳感相連的萬用表讀數控制加載速度的方法,連續加載。
  4. It applies level synchronous hoisting devices on the spray system, preheater, tin channel and condesing wind channels of automatic tin stove

    自動錫爐之噴霧系統、、錫槽,冷風口均采水平式同步升降運動裝置。
  5. Specification for prestressed concrete pressure vessels for nuclear engineering

    核工程用應力混土壓力容規范
  6. The system is made up of two parts : pre - separator and filter belt press. the sludge to be dried is pumped into the pre - separator where the poly - electrolite solution mixed with the sludge flocculates. some water is separated in the drum where the sludge flow discharging into the filter belt is also balanced

    濾液再循環利用:脫水產生的清澈濾液循環用作濾帶清洗噴淋水,只在絮劑調配,機開機關機后噴淋清洗時才需要自來水或生產用水,水耗最小。
  7. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋工程、模板工程、混土工程、應力工程、移存梁工程、孔道壓漿工程、梁體封端工程、橋面防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並吊裝鋼筋骨架入模;拆裝式和液壓式兩種模板的設計、製作要求和使用方法;綜合考慮、優化混土配合比,混土灌注從兩端至中間、先底板、后腹板、再頂板的施工順序和斜向分段、腹板水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保應力施工質量的施工技術;採用重物移運有效移梁的施工方法;壓漿、封端、橋面防水層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  8. Suitable for the domestic water, food processing water, cool the circulating water, the boiler supplies water, exceed the filtration in advance of the pure water, steam condensation water, build well liquid and water flooding in the oil field, chemical liquid medicine, electroplate the filtration that the liquid, much kinds of acid or alkaline solution, emulsifier wash helping, cleaning solution, medical products, ink and water treatment of the semiconductor, electron trade

    水過濾適用於生活用水食品加工用水冷卻循環水鍋爐供水超純水的過濾蒸汽冷水油田修井液及注水化學藥液電鍍液多種酸性或堿性溶液乳化劑洗滌濟洗滌液醫藥製品墨水的過濾及半導體電子行業的水處理。
  9. Model zt has two specifications, each specification is equipped with distillation tower, still, condusator, buffer - tank, measurer of specific gravity

    Zt型有zt - 200 、 zt - 300 、兩種規格,每種規格包括相應配套的、蒸餾塔、冷、冷卻、穩壓罐、比重測定
  10. In order to experience prices of concrete, metalworking machine tools as well as to tools, concrete block or also as desired for pneumatic tools and block grooves, contact the coworkers of ramasu hydraulics pvt ltd

    Ramasu hydraulics pvt ltd是一家靈活的企業,該企業針對客戶需求製造專門的制混土、混土磚塊,固定編組的整列列車,風動工具,工具械,水泥,金屬加工機床。
  11. Perforation of heat exchange tube, cracks on the jointing connection of heat exchange tube and tube bundle hoard result in the leakage of the tube bundle in sulfur condenser were analyzed, proposed precautions and countermeasures were derived from a combination of the plant operation conditions and equipment conditions, the original equipment with satisfactory outcome were revamped

    摘要分析了硫冷換熱管穿孔及換熱管與管板連接焊接接頭出現裂紋導致管束泄漏的原因,結合實際工況提出了防和處理措施,並對原設備進行了改造,效果良好。
  12. Machines for the manufacture of constructional products from concrete and calcium - silicate - safety - part 7 : stationary and mobile equipment for long line manufacture of prestressed products

    土和硅酸鹽建築產品用生產機.安全.第7部分:應力製品長線法生產用固定和移動設備
  13. To the concrete two - phase flow - crude oil, its temperature, speed and capacitance value are measured by flat capacitance sensors, fluke rlc instrument and other auxiliary appliance. assessing the characters of crude oil and predicting the solidifying point is the result of using fuzzy information arithmetic

    針對具體的兩相流? ?原油,用平板電容、 fluke精密電橋和其它輔助傳感分別測取了原油的熱處理溫度、降溫速率和電容值,利用模糊信息融合演算法對測量值進行處理和尋優,從而進行原油熱處理的綜合評定和點的在線測。
  14. The leakage of condensers of 4 generators ( 300mw ) in mawan power plant and its preventive measures were discussed. the practically effective leakage inspection method on - site was introduced as well

    摘要闡述了媽灣電廠4臺300mw機組泄漏的常見問題及防措施,並介紹了現場實際工作中所採用的較為成功和有效的查漏方法。
  15. 9 pieces of rc test beams were fabricated, the fbg sensors and strain gauges were mounted in the tensile steel, compress concrete and cfrp of the tested beams

    制備9根rc試驗梁,將fbg傳感與電阻應變片同時置於實驗梁內(受拉鋼筋、壓區混土及碳纖維復合材料中) 。
  16. Railway applications - track - concrete sleepers and bearers - part 4 : prestressed bearers for switches and crossings

    鐵路設施.軌道.混土軌枕和支座.第4部分:轉轍和交叉用應力支座
  17. The monitoring results show that the measuring and theoretical results are in good agreement with each other, and fbg sensors put up good performance in stabilization, precision, resistance emi and ruggedization

    在上海旗忠網球中心雙向應力混土看臺結構施工期間,將72個光纖光柵傳感埋設結構中,進行了為期8個月的現場施工監控。
  18. The abnormal conditions of polyester vaccum system such as the frequent exchanging of liquid - ring pump in prepolycondensation, the occlusion of scraped condenser and vaccum atmospheric leg, the eg spray flow decreasing of vaccum injection pump, the working performance on the low side of the injection pump itself were analysed

    摘要對聚酯真空系統的異常情況如聚液環泵頻繁切換,刮板冷、真空大氣腿堵塞、真空噴射泵eg噴淋流量降低,噴射泵本體工作性能偏低等進行了分析。
  19. Machines for the manufacture of constructional products from concrete and calcium - silicate - safety - stationary and mobile equipment for the manufacture of precast reinforced products

    生產混土和硅酸鈣建築產品用機.安全.生產制加筋產品的固定和移動設備
  20. Machines for the manufacture of construcitonal products from concrete and calcium - silicate - safety - part 6 : stationary and mobile equipment for the manufacture or precast reinforced products

    生產混土和硅酸鈣建築產品用機.安全.第6部分:生產或澆鑄加筋產品用固定和移動設備
分享友人