預期載荷 的英文怎麼說

中文拼音 [zǎi]
預期載荷 英文
anticipated load
  • : Ⅰ副詞(預先; 事先) in advance; beforehand Ⅱ動詞(參與) take part in
  • : 期名詞[書面語]1. (一周年) a full year; anniversary 2. (一整月) a full month
  • : 載Ⅰ名詞(年) year : 一年半載 six to twelve months; six months to a year; 三年五載 three to five ...
  • : 荷名詞(蓮) lotus
  • 預期 : expect; anticipate
  • 載荷 : load; loading載荷變化 load fluctuation; variation in load; 載荷裝置 load device
  1. ( 3 ) by choosing core faultage of axial site in luohu fracture zone i. e. geological cross section in huangbeiling faultage f8 as geological model and utilizing finite element numerical method, change tendency of huangbeiling faultage f8 under self - weight stress and building loads is stimulated. and long - term development trend of fracture zone is also predicted, which has an important guiding meaning for works of geological disaster prevention in district of luohu jiancheng

    ( 3 )選取羅湖斷裂帶軸部的核心斷層?黃貝嶺f8斷層地質剖面作為地質模型,利用有限元數值方法模擬了黃貝嶺f8斷層在自重應力和建築物共同作用下的變化趨勢,計出斷層帶的長發展趨勢,這對羅湖建成區的地質災害防止工作有重要的指導意義。
  2. This paper analyzes the character of the transformer load and presents the control means to reduce the comprehensive power loss to minimum by controlling the transformer operation status, which forecasts the daily load of transformer by periodical auto - regression model ( par ) and divides the daily flow line automatically into two typical phases. then, this paper simulates the par by matlab. at last, a real intelligent control device based on the ti ’ s tms320lf2407 dsp has been completed

    論文分析了配電變壓器的負特點;提出採用周自回歸模型測配電站用電日負,根據負測結果和用電時段,以綜合功率損耗最小為目的變壓器經濟運行控制方法;以ti公司的tms320lf2407dsp為基礎,完成了配電站變壓器經濟運行智能監控裝置的研製。
  3. Abstract : the paper describes the application of vacuum preloading in combination with surcharge preloading to improve soft soils for la rge working load in the storage area of phase of nanjiang coal terminal of ti anjin port. analysis is made on the result of the improvement and it is concluded that the technique of vacuum proloading in combination with surcharge preloadin g can be used to improve soft soils for large working load and the result can be remarkable

    文摘:本文介紹了大使用條件下真空聯合堆壓技術在天津港南疆煤碼頭堆場(二)軟基加固工程中的應用情況,並對加固效果進行了詳細分析,得出了大使用條件下可採用真空聯合堆加固軟基且加固效果明顯的結論。
  4. According to different working performance ofjhe partially prestressed structure after cracking under the piling loads, the calculating formulae of the " complete stress " are deduced separately by means of linear - elastic or nonlinear analysis method

    根據部分應力構件在作用下不同的受力性能,分別用線彈性方法和非線性分析方法推導了應力構件開裂截面全應力的計算公式。
  5. On the base of the research about the prestressed concrete structures at chongqing jianzhu university, a convenient and practical way to control the cracks is introduced in the pages, which is called the method of nominal tension stress that control the width of cracks by the nominal tension stress ftk under the working loads and the limited loads

    文中在參考重慶建築大學多年研究成果的基礎上,通過研究四榀應力框架梁的裂縫發展情況,推薦了一套了實際結構工程設計中方便的裂縫控制方法? ?以名義拉應力ftk控制短及長作用下應力梁的裂縫要求。
  6. Finally, two examples show that, the availability and practicability of the new model is verified. the analysis of calculation result of berthiervill test embackment shows different part of compression curve have different influence upon the course of consolidation, and correct coefficient and viscous effect have great significance on deformation forecast. associated with the wenzhou airport runway engineering, the reason of increasing of pore - water pressuer in under - lying soft layer and post - construction settlement are given

    最後,通過兩個工程實例的分析來說明本文模型的有效性和實用性:一是對berthiervill填土試驗場的軟基實測數據和理論成果進行對比分析,闡明考慮結構性擾動和粘滯性效應對分析天然粘土固結壓縮性的重要性;二是對溫州機場袋裝砂井超壓工程進行數值模擬,指出停間下臥層孔壓增加和工后沉降大的原因。
  7. The static loading test for three group of testing piles of jiading power plant secend stage project are analyzed and studied in this thesis, and the practical applying of high - accurate data collector, technique of waterproof insulation and testing technique of burying in the body of pile are introduced also. the vertical and horizontal loading features of three group of piles of different kind and constructing technique in different earth layer at the pile point are analyzed and compared and summed up with basic integro - differential equation calculating the pile earth system load transmit, transforming principle of stress - deforming and pile body rating of burying electric measuring element. changing law of stress, and changing law of pile body shifting and bending for different testing piles under vertical and horizontal load are showed so that the loading features of soil layer and pile at testing spot, reliable design data for pile type and base for scientific construction technique are provided

    本文僅就嘉定電廠二工程中的三根試驗樁的靜試驗進行了分析和研究,利用樁土體系傳遞分析計算的基本微分方程及應力-應變轉換原理,結合埋電測元件的樁身率定,對三組不同種類、不同施工工藝、不同持力層中的樁的豎直、水平承特性進行了分析、比較和歸納,通過大量、全面的實測數據,經過整理、轉換和推演,揭示了不同試驗樁在豎直、水平作用下的應力變化規律和樁身變位、撓曲變化規律,最終提供試驗場地土層和樁的承特性,為該工程合理設計樁型提供了可靠的設計參數,為確定科學的施工工藝提供了有力的依據。
  8. As the ratio of peak samples to total training samples is low, the prediction accuracy of peak load is poor when applying support vector machine ( svm ) model to predict a periodical load

    在應用svm模型于具有周性負測時,由於在訓練樣本中峰值或谷值樣本所佔比例很少,從而導致峰值測精度不高。
  9. The steady solution of nonlinear ship motions in oblique seas can be gained by adopting the new technique presented in this thesis. this work promotes the application of theoretical prediction methods of nonlinear ship motions and wave loads

    本文提出的新方法可以保證獲得斜浪中船舶非線性運動的穩定的周解,從而進一步完善了斜浪中船舶非線性運動報和波浪計算的工程實用方法。
  10. The grey model and extended grey dynamic model considering the influence of loading time on creep of concrete were used to predict the long - term deformation of 6 self - compacting concrete beams on the basis of short - term experimental data

    摘要採用灰色系統模型以及灰色動態拓廣模型考慮持續時間對混凝土徐變的影響對6根自密實混凝土梁的長變形進行測研究。
  11. The electro - hydraulic load simulator of fin stabilizer is physical half - objective simulative system. its function is to simulate, under laboratory conditions, different kinds of hydrodynamic force exerted on the fin stabilizer so as to detect technical performance index of the driving system of fin stabilizer. thus the classical self - destructing all - objective experiment will be converted to half - objective forecasting experiment in laboratory to achieve the aims such as shortening lead time, saving developing funds, enhancing reliability and success proportion

    減搖鰭電液負模擬臺是一種半實物物理模擬系統,其功能是在實驗室的條件下,模擬船舶航行過程中減搖鰭所受的海浪水動力譜,從而檢測減搖鰭驅動系統的技術性能指標,將經典的自破壞全實物實驗轉化為在實驗室條件下的半實物測性實驗,以達到縮短研製周、節約研製經費、提高可靠性和成功率的目的。
  12. With the method, each mechanical stage of this kind of structure could be simulated and calculated including crack moment, ultimate strength, stresses and deflections of all stages more precisely

    利用該方法可以對結構的各受力階段進行模擬計算,得出各階段彎鋼梁、一混凝土、二混凝土的應力和結構變形,並能計算出彎組合梁的開裂和極限破壞
  13. First, based on the analysis to the development condition of computer and property of the input data of bridge, this paper, taking convenience and practicability as principle, develops the multi passages data - in system made up with human - computer interactive interface and excel import model. second, after comparing and analyzing to the calculation theories and methods of creep and shrinkage, clearing up the key steps of creep and shrinkage analysis, the paper takes incremental method to establish program to analyze secondary inner force caused by creep and shrinkage. third, the paper puts some optimal or simplified treatment to the contents of pre - stress and develops relative program ; in addition, through analysis to the different methods used to calculate the secondary inner force caused by pre - stress, the paper combines equivalent load method with finite element, carries out some simplified treatments, and establishes program to calculate secondary inner force caused by pre - stress

    首先,在分析當前計算機的發展狀況及橋梁結構輸入數據特點的基礎上,以方便、實用為原則,採用人機交互界面和excel輸入方式聯合的多通道數據輸入系統;其次,通過比較分析徐變收縮計算的各種理論及方法,澄清了徐變收縮分析的關鍵過程,並採用增量法編製程序,實現徐變收縮次內力分析;再次,對應力的相關計算內容進行適當優化或簡化處理,並編制相應程序;另外,本文還在比較應力次內力各種計算方法的基礎上,將等效法結合有限元進行一些簡化處理,編製程序實現應力次內力的計算;最後以三個算例來校核計算方法及程序運行結果的可靠性,取得了效果。
  14. Through the theoretical calculation and parameter analysis and compared the result with general composite beam, the results show that the section stress redistributed by the effects of concrete shrinkage and creep and tensile stress by difference temperature will be greatly reduced. the forcing characteristic of this

    通過理論計算和有限元參數分析,與常規組合結構進行對比,驗證了應力波形腹板組合結構具有大大減小徐變引起的應力重分佈及溫差和收縮效應在混凝土板產生的拉應力值、對加和持不敏感的特點,結構受力性能非常優越。
  15. To avoid the actuator, a capacitor load being charged up by the drift current of the amplifier, a secondary feedback from the output of the amplifier has been used and expected result has been gotten

    針對驅動器輸出電流漂移造成的壓電作動器(容性負)電積累,文中引入了抑制驅動器電流漂移的反饋環節,取得了的控制效果。
  16. ( 5 ) another is the long - term predict utilizing the biggest index number lyapunov in the chaotic time series and the whole space method during the steady period of the road foundation load, after the overload of the road foundation finished. meanwhile, contrasts with some mature settlement predict methods, estimating some important section in the engineering synthetically, making sure an ideal outcome of the predict warp, then unload the overload of road foundation and make it satisfy the design request

    ( 5 )路基超完成後,在路基穩定間內,利用混沌時間序列中的最大lyapunov指數和全域法進行長測,同時與一些比較成熟的變形測方法進行對比,對工程中一些重點斷面進行綜合評判,確定一個較理想的測結果,從而對路基超進行卸,使其滿足工程設計要求。
  17. In view of the technical problems of softening of foundation soil and reduction of bearing capacity of the breakwater under the action of repeated wave loads during the execution of the second phase of the deepwater waterway regulation project in the changjiang estuary, tianjin port construction corporation has successfully developed safer, higher quality and highly efficient technology and special - purpose marine craft and machinery for laying deepwater sand blankets and offshore installation of prefabricated drains, which were more suitable for the working conditions in the changjiang estuary, and has also explored the construction technology for prefabrication of caissons with rubber anti - sliding plates, to ensure the efficient implementation of the engineering measures against softening of foundation soil

    摘要針對長江口深水航道治理二工程施工過程中遇到的堤身在波浪重復作用下地基土出現軟化、承力降低的技術難題,第一航務工程局成功開發了適合長江口工況的安全、優質、高效的深水砂被鋪設和海上塑料排水板打設施工工藝及專用船機設備,探索了一整套帶橡膠阻滑板的沉箱制施工工藝,確保了抗軟化工程措施的有效實施。
  18. The resistance attenuation of each element is considered in the design process, and the statistical parameters of the elements are assumed to be the same as the investigated results of china. in the process of the calculating of the element reliability attenuation in expected service life, several load combination and different load ratio of dead load to live load are considered. in order to ensure that structure reliability in expected service life satisfies the requirement of today ’ s code, a method of choosing the initial reliability index of structure basing on the length of expected service life and the structure resistance attenuation is proposed and the corresponding durability reduction factor is chosen by an optimum algorithm

    根據我國現行建築結構可靠度設計原理,考慮耐久性退化影響因素,設計了抗力統計參數與我國調查結果一致的五種代表性鋼筋混凝土構件,考慮多種效應組合以及不同效應比,研究了不同使用內代表性構件的可靠度變化規律;為保證使用內結構可靠度水平仍可滿足現行規范要求,提出了根據使用和抗力衰減幅度確定結構設計可靠度指標的方法,並通過優化的方法確定了使用內的耐久性折減系數,給出了使用結構可靠度設計的實用設計方法。
  19. Different parts of the payload are secured such that only the intended set of recipients are able to read them while they remain encrypted to all other intermediaries

    保護有效的不同部分,從而使的接收群體能夠閱讀它們,而同時又對其他所有中間機器保持加密狀態。
分享友人