額定因數 的英文怎麼說

中文拼音 [édìngyīnshǔ]
額定因數 英文
rating factor
  • : 名詞1 (額頭) forehead:寬額 a broad forehead2 (牌匾) a horizontal tablet 3 (規定的數目) a sp...
  • : Ⅰ形容詞1 (平靜; 穩定) calm; stable 2 (已經確定的; 不改變的) fixed; settled; established Ⅱ動詞...
  • : Ⅰ動詞[書面語] (沿襲) follow; carry on Ⅱ介詞1 [書面語] (憑借; 根據) on the basis of; in accord...
  • : 數副詞(屢次) frequently; repeatedly
  1. This article aims at the boiler ' s problems in operation : 1 ) under nominal load, the smoke temperature at the outlet of hearth reaches 1200, far more exceeds 1050 the original designed temperature. this will always result in slag inside boiler and the temperature of overheater ' s pipe superheat, so that boiler cannot take nominal load and all these influence boiler ' s nomal operation heavily, 2 ) this article also studied the reason why the assistant oil becoming necessary when coal changes. during the nomal operation, many factors ( makeup of combustor and its disposal, smirch and encrust of water wall, excessive air coefficient, temperature of primary air, coal type and density of coal dust ) can deviate the designed working conditions, then affect the boiler ' s nomal operation

    本文針對該鍋爐在實際運行中存在的問題:在負荷下,爐膛出口超溫、低溫段過熱器前煙溫高達936 ,遠遠超過815的設計值;噴燃器四周水冷壁結焦嚴重,過熱器管壁溫度超標,無法帶上負荷;甚至有時燃煤質量的變化,必須投油助燃的嚴重情況進行了分析研究。在實際生產過程中,燃燒器的結構、布置,水冷壁的粘污、結垢,過剩空氣系、一次風溫、煤種及其濃度變化等許多素都會偏離鍋爐的設計工況,從而影響爐內的傳熱和燃燒,造成爐膛出口超溫、水冷壁結渣等問題。
  2. Based on the study of transferring characteristics of the lcc - type resonant voltage, the parameter combinations, which make widths and magnitudes of voltage pulses of resonant network adjustable, arededucedo when the following requirements are met : fn > 3, k > 3 or cp / cs > 8, the above circuit is of natural voltage - stabilized characteristics, thus open - loop control method for bucking voltage is presented and the experimental results verify that the method is feasible.,

    實測整機在負載時效率達到88以上。在研究lcc諧振網路電壓傳輸特性的基礎上,推導出滿足可變寬度和幅度的諧振網路輸出電壓脈沖列的參組合。設計f n 3 、 k 3或c _ p / c _ s 8時,諧振網路具有自然穩壓特性,此本文提出並實驗驗證了一種整機為降電壓時的開環控制策略。
  3. Aimed at design index of input power 1. 5kw, most output rotate velocity 300rpm, and rating output rotate velocity 150rpm, considering factors of angle and ratio of transmission, on the basis of kinematics simulation, author optimized the kinematics parameters. in this paper, author has made some analysis and study to the primal assembly condition of transformer ' s sequential action in theory, designed structure dimension of the input and output transformer, and verified the corresponding strengthen. further, the structure, which is to key transmission components of velocity control system of the speed regulator, has been designed based on meeting operational sensitivity, precision and self - locking

    本文針對輸入功率為1 . 5kw ,最大輸出轉速,輸出轉速的無級變速器的設計要求,並考慮到傳動角及變速比等素,在運動學模擬的基礎上,對運動學參進行了優化;本文對變換器連續作用的初始裝配條件進行了理論分析與研究,對輸入、輸出變換器作了結構尺寸的設計,並進行了強度校核計算;本文還對變速器調速系統中主要傳動構件在滿足操作的靈敏度、精度、自鎖性的基礎上進行了結構設計;最後採用workingmodel3d軟體,進行虛擬樣機的計算機輔助模擬設計及運動學和動力學計算。
  4. First of all, i summarize the forecast model category and estimate each model in detail, then, i adopt different model to forecast demand, supply, bdi of bulk shipping market. as to demand forecast, i mainly focus on the imitating precision of primitive data, adopt grey forecast model, self - suited filter model separately, and then compose these models as a better one. as to supply forecast, i use econometrics model to describe the complicated relationship of demand, supply, bdi, gnp etc. as to bdi, i try to draw into market integrated factor, describe the relationship of bdi, supply, capacity, speed, rate of oil, navigating capital etc. then finally, i make afterwards evaluation of these models and then analyze future bulk shipping market in detail

    對于需求預測,著重考慮對原始據的擬合精度,經過模型比較優選論證,分別採用了灰色一階模型,改進的灰色二階、自適應過濾預測的加權組合模型,得到了相當高的擬合精度;對于供給預測,運用計量經濟模型對供給、需求、運價、 gnp 、進出口貿易等多變量之間復雜的相互關系進行動態模擬,量的反映出各變量之間的果關系;對于運價預測,嘗試引入市場綜合概念,化繁為簡,通過描述運價與運力供給、載重噸、油耗、航速、燃油價格、航行成本等等諸多素的關系來進行預測。
  5. Calibration of a wattmeter at rated voltage with 5 different current settings on one current range ( at one frequency and one power factor )

    電壓,校正一個電流量程上有五個不同電流值的功率表(一個頻率及一個功率) 。
  6. The observer makes use of motor parameters to estimate speed, but these parameters ( stator and rotor resistance, magnetizing inductance ) will vary because of the change of environmental temperature, iron loss and main flux saturation. so parameter variation will lead to the error of estimation, the purpose of this paper is to study the influence and the compensation of parameter variation

    為觀測器在估計轉速時利用的是電機的,而電機的參子電阻、轉子電阻、勵磁電感)由於環境溫度的變化、鐵心損耗和主磁飽和的影響將發生變化,所以必然有估計誤差產生。
  7. The simulation results show that the power factor and efficiency of lim are much lower than that of rotary induction motor due to end effect and big air gap of lim. end effect force has a great influence on the thrust of lim. the performance of lim can be improved with the proper secondary structure, small air gap, big goodness factor or heavy load

    結果表明:受邊端效應及大氣隙影響,直線感應電機功率及效率較低;運行狀態下的邊端效應力對電機推力有較大影響;設計電機時選用合適的次級材料、減小氣隙、增大品質、增加負載都可提升電機的輸出性能,通過設計有效的控制演算法可使電機在滑差下具有較高的運行效率。
  8. If the cost of purchasing the options in " the strategy " exceed the amount which " the strategy " has to notionally purchase such options, the notional amount on the options will be scaled down by a factor, known as position adjustment factor

    如果《策略》中的購買項目的總金超過了《策略》規的名義采購項目的總金,就要將項目的名義總乘以一個比例縮減,該被稱為「情況調整」 。
  9. Analysis of expanding difference controlling problem in cold state start up of russia made 65 mw steam turbine and its solution

    汽輪機冷態啟動脹差控制難原分析及解決
  10. It analyses the causes to bright image movement, studies principle to compensate image movement, conforms project to compensate image movement, and designs framework to compensate image movement in the article ; to analyze and design configuration of the scanning mirror, to select matters of mirror and its support structures on the principle of consistent line expansion coefficient ; to ascertain type of moment electromotor by most rotating angle speed and most rotating moment which are required by loads in the period to take pictures, as well as by figuration size of electromotor ; to design retarder according as the electromotor parameters ; to design and optimize lightweighted mirror shapes, because the mirror is key part ; to design flexure support structure, to analyze static and dynamic characteristics of the support structure by name of patran program for validating desig n rationality ; to study function of the scanning mirror electric control system ; to test precision of the system, the results indicate the rationality of design of the scanning mirror system

    本文通過分析像移產生原、研究像移補償原理,確像移補償方案,並根據像移補償原理設計補償機構;分析與設計掃描反射鏡系統結構,根據材料線膨脹系一致原則,選擇反射鏡及其背部支撐的材料;由掃描反射鏡在擺掃周期內的最大擺掃角速度確力矩電機的轉速,根據負載力矩確電機的轉距,綜合電機外型尺寸等素,確執行元件? ?電機的型號;根據所選電機的參指標,設計1 : 6速比的減速器;利用patran軟體對掃描反射鏡系統中的關鍵件? ?反射鏡進行輕量化設計與優化;設計反射鏡柔性支撐結構,並通過軟體分析支撐結構的力學特性,驗證反射鏡柔性支撐結構設計的合理性;從原理上研究掃描反射鏡控制系統功能;進行系統精度測試,測試結果表明掃描反射鏡系統設計的合理性。
  11. From the viewpoint of system, such the basic theories of the modeling method as system dynamics, learning organization and system thinking are studied on the basis of the analysis of the status quo of management decision - making, as well as relevant model building blocks, modeling methods and modeling steps. taking advantage of modeling platform stella / ithink, some enterprise management decision - making modeling infrastructures are built based on anhui jianghuai automotive co., ltd., which include inventory controlling, manufacturing, pricing, shop controlling and etc. finally, based on the qualitative analysis of the strategy of mark down sale in auto industry the model of the pricing strategy in auto industry is developed, which is based on anhui jianghuai automotive co., ltd. the effects of the strategy of mark down sale are simulated and analyzed quantitatively

    論文在分析國內管理決策現狀的基礎上,從系統的概念出發,研究了系統動力學、學習型組織理論、系統思考等基本理論以及系統動力學方法的建模構件( block ) 、建模原理、方法與步驟;藉助建模平臺stella ithink ,以安徽江淮汽車股份有限公司為原型,設計構建了庫存控制、製造、價格和車間控制等企業管理模型功能子模塊( infrastructure ) ;在性分析國內汽車行業降價銷售策略的基礎上,設計構建了以安徽江淮汽車股份有限公司為原型的國內汽車行業價格決策模型,該模型圍繞產品價格、交貨提前期、市場份、利潤、生產能力等關鍵素,對降價銷售策略帶來的市場運作、生產管理、銷售發貨及庫存控制等過程的變化情況進行了模擬模擬,並通過一據結果量地說明了降價銷售策略將給企業帶來的結果。
  12. The controlled object hyvp ( hydraulic pressure vibration platform ) has the property of big loading pressure and rating power, so it need considerable transmitted and control power, it also has the property of high - level math model, and narrow frequency width in closed - loop, and bad stability. this thesis is based on the hpvs in the “ tiema project ”

    被控對象(液壓振動臺)具有負載壓力和功率相當大的特點,此要求傳輸和控制的功率要相當可觀;而且它還具有學模型階高、閉環頻帶寬度窄、穩性差等特點。
  13. Full - sealed assembling capacitor is applied to ac power system 50 60hz with rated voltage of 6kv 10kv 35kv for improving power factor and quality of power grid, reducing transmission loss and raising the efficiency of power transmission transformation facilities

    全密封集合式並聯電容器,主要用於工頻50hz或60hz ,電壓6kv 10kv及35kv的交流電力系統中用來提高功率改善電網質量降低線路損耗,充分發揮輸變電設備效能。
  14. On - line monitoring of hvcb is the precondition of predicting maintenance, is the key element of reliable run, and is the important supplement to the traditional off - line preventive maintenance in fact, the faults are made by hvcb, no matter in number or in times, is over 60 % of total faults so it has determinative importance for improving the reliability of power supply and this can greatly decrease the capital waste used by - dating overhaul in this paper, the inspecting way of hvcb mechanism characteristic is discussed the concept of sub - circuit protector is presented, the scheme that we offered has been combined with sub - circuit integrality monitoring theory, to ensure that it has the two functions as a whole according the shut - off times at rated short circuit given by hvcb manufacturer, the electricity longevity loss can be calculated in each operation, and the remained longevity can be forecast too an indirect way for calculating main touch ' s temperature by using breaker shell temperature, air circumference temperature and breaker ' s heat resistance is improved in this paper, and main touch resistance can be calculated if providing the load current msp430, a new single chip microcomputer made by ti company, is engaged to develop the hardware system of the on - line monitoring device, and special problem brought by the lower supply voltage range of this chip is considered fully

    高壓斷路器所造成的事故無論是在次,還是在事故所造成的停電時間上都占據總量60以上。此,及時了解斷路器的工作狀態對提高供電可靠性有決性意義;並可以大大減少盲目期檢修帶來的資金浪費。本文論述了斷路器機械特性參監測方法;提出了二次迴路保護器的概念,並將跳、合閘線圈完整性監視和二次迴路保護結合起來,給出具有完整性監視功能的二次迴路保護器實現方案;根據斷路器生產廠家提供的斷路器短路電流分斷次,計算每次分閘對應的觸頭電壽命損耗,預測觸頭電壽命;提出根據斷路器殼體溫度和斷路器周圍空氣溫度結合斷路器熱阻來計算斷路器主觸頭穩態溫升的方法,並根據此時的負荷電流間接計算主觸頭迴路的電阻;在硬體電路設計上,採用美國ti公司最新推出的一種功能強大的單片機msp430 ,並充分考慮該晶元的適用電壓范圍給設計帶來的特殊問題;在通信模塊的設計中,解決了不同工作電壓晶元之間的介面問題,並給出了直接聯接的接線方案。
  15. The parties may prescribe that if one party breaches the contract, it will pay a certain sum of liquidated damages to the other party in light of the degree of breach, or prescribe a method for calculation of damages for the loss resulting from a party ' s breach

    第一百一十四條當事人可以約一方違約時應當根據違約情況向對方支付一的違約金,也可以約違約產生的損失賠償的計算方法。
  16. Article 114 liquidated damages ; adjustment ; continuing performance notwithstanding payment of liquidated damages the parties may prescribe that if one party breaches the contract, it will pay a certain sum of liquidated damages to the other party in light of the degree of breach, or prescribe a method for calculation of damages for the loss resulting from a party ' s breach

    第一百一十四條當事人可以約一方違約時應當根據違約情況向對方支付一的違約金,也可以約違約產生的損失賠償的計算方法。
  17. Full - sealed assembling capacitor is applied to ac power sys - tem 50 60hz with rated voltage of 6kv 10kv 35kv for improving power factor and quality of power grid, reducing transmission loss and raising the efficiency of transmission transformation faciliti - es. this type of capacitor has an assembling full - sealed struc - ture, and it is comprised of capacitor unit body, container, insula - ition cooling impregnant, outlet ceramic bushing, pressurereleas -

    電壓6kv 10kv及35kv的交流電力系統中用來提高功率改善電網質量,降低線路損耗,充分發揮輸變電設備效能。本產品為裝配式全密封結構。主要由器身波紋油箱絕緣冷卻油出線套管壓力釋放閥溫度控制器等部件組成。
  18. Starting current the meter can work corectly at rated voltage, rated frequency. when load currdnt is large then 0. 4 ib. power facotor : 1. running with no - load the meter use logic circuit to anti - creep

    啟動電流:在電壓頻率功率為1的條件下,當負載電流大於0 . 4 ib時電度表都能正常工作。
  19. Because we allow the size of the monetary base to be determined by the inflow and outflow of capital, through a clear and non - discretionary undertaking to buy and sell hong kong dollars for us dollars at a fixed exchange rate, we must be prepared for volatility in interbank interest rates and, as a consequence, volatility in deposit and lending rates for consumers

    根據金管局所作明確且無酌情考慮的兌換保證,我們會按照固匯率以美元買入或賣出港元,此貨幣基礎的資金流入及流出而增減。在此情況下,銀行同業拆息必然會波動,以致銀行客戶存貸利率也會波動。
  20. Rated voltage factor

    電壓
分享友人