風險評價 的英文怎麼說

中文拼音 [fēngxiǎnpíngjià]
風險評價 英文
risk assessment
  • : Ⅰ名詞1 (空氣流動) wind 2 (風氣; 風俗) practice; atmosphere; custom 3 (景象) scene; view 4 ...
  • : Ⅰ名詞1 (險惡不容易通過的地方) a place difficult of access; narrow pass; defile 2 (危險) dange...
  • : Ⅰ動詞1. (評論; 批評) comment; criticize; review 2. (評判) judge; appraise Ⅱ名詞(姓氏) a surname
  • : 名詞1. (價格) price 2. (價值) value 3. [化學] (化合價) valence
  • 風險 : risk; hazard; danger
  • 評價 : appraise; evaluate; assess; estimate; valuation
  1. The third chapter focuses on how to measure and to evaluate the risks. it elaborates how to guesstimate the probability that the risk will occur and how to - evaluate the risks. the method how to unify different kinds of expense of risk into i economic expense and how to evaluate the risks by the method of direct economic evaluate is brought forward, and it is used in the identifying and evaluating the risks of the spanning girders project

    在第三章中,項目的度量與是論述的重點,該部分詳細論述了如何進行項目發生概率及其後果的估計及如何進行項目風險評價,提出了如何將不同性質的損失統一為經濟損失的方法和用直接經濟法進行項目風險評價與決策,並在中鐵五局架梁項目的度量和中進行了運用,這也是本文理論上有所創新的地方。
  2. Evaluation of investment risk in hydraulic engineering based on bp network

    網路的水利工程投資風險評價
  3. The main process of regional ecological risk assessment includes 5 stages : regional analysis, risk receptor selection, risk sources analysis, exposure and hazard analysis, and integrated risk assessment. arming at flood, drought, storm tide, petroleum pollution accident and flow breaking in the lower huanghe river, the probability and distribution of each kind of risk sources are evaluated. the authors bring forward indexes and formulas to measure hazarded degree and risk value of ecosystem. by using remote sensing data, historic record, survey data and by means of geographical information system, regional ecological risk assessment is finished. on the basis of assessment result, the environmental risk management countermeasure of the huanghe river delta is advanced

    以黃河三角洲為例進行了區域生態風險評價理論和方法的探討。針對黃河三角洲主要生態源洪澇乾旱暴潮災害油田污染事故以及黃河斷流的概率進行了分級並提出度量生態損失與生態的指標和公式,分析了源的危害作用運用遙感資料歷史記錄調查數據和地理信息系統gis技術,完成了區域生態綜合在此基礎上提出黃河三角洲的區域生態管理對策。
  4. First, through the brief summary of country risk by the credit rating agencies abroad, the assessment indicators adopted are analyzed comprehensively that the assessment system chosen is not suitable for eci

    第一,通過對國外資信級機構國家風險評價的簡要概括,針對其所選的指標進行全面分析,指出其體系不適合出口信用保
  5. Application of fuzzy consistency theoren and analytic hierarchy process to risk evaluation of bank slope

    模糊一致理論及層次分析法在岸坡風險評價中的應用
  6. The risk of eci is irregularity, therefore, the assessment of country risk is of particular importance significance, which relating directly to pivotal technique establishment of premium rate, risk controlling, etc., determine the sound development of the cause of eci as well as being taken continuously deal in, and promoting national implementation of macroeconomic policies

    出口信用保具有不規律性,因而國家風險評價具有特別重要的意義,它直接關繫到出口信用保費率釐定、控制等關鍵技術性環節的制定;決定了出口信用保事業的健康發展和持續化經營;促進了國家宏觀經濟政策的貫徹實施。
  7. Based on analysis of hang river ' s actuality in the lower yellow river and researches related with evaluation of dike breach risk, it is put forward that the influencing factors of hang river dike beach risk in the lower yellow river should involve 4 aspects, the locomotion of incoming water and sediment load, the regional crustal stability, the evolvement of river regime and the stability of river dikes. the evaluation indexes system of hang river dike breach risk and uniform synthetic model are established from the 4 aspects. with the support of gis technology, the evaluation indexes system and the model of multi - hierarchical fuzzy synthetic judgment are applied to estimating the dike beach risk of hang river in the lower yellow river under different flood conditions

    在對黃河下游懸河現狀、決溢風險評價有關研究進行分析的基礎上,本文提出黃河下游懸河決溢的影響因素應當包含水沙運動、區域地殼穩定性、河勢演變和堤防穩定性4個方面,並從這4個方面建立了黃河下游懸河決溢風險評價的指標體系和統一的綜合模型;在gis技術的支持下,運用指標體系和多層次模糊綜合判模型,對不同洪水情景下黃河下游懸河的決溢狀況進行了
  8. The objective of thesis is to find out the exact risk factors and establish a kind of evaluated system that could fit chinese markets. based on foreign researching, this thesis presents a point of view that external risk factors should get more weight in the evaluated system through expert survey

    國外和港臺地區的研究市場與大陸有較大差異,其市場環境和結構較為完善,在具體的風險評價體系構建中可以較少的關注宏觀因素,同時其公司治理結構相對大陸的國有企業等也較為簡單。
  9. After analyzing the character of risk, i introduce data mining method into risk management, to solve the contradiction between great capacity of data and lack of information, the methods include mathematics statistics and artificial neural network ( ann ). then, i study on the methods of risk management in risk identification, risk evaluation and risk disposal, what is advanced, fault tree analysis method based on fuzzy probability, stochastic simulation method and the topsis method based on interval number all consider the characteristic of risk. finally, i discussed the application of information system ( mis ) in project risk management, and developed a risk management information system

    論文在深入分析了特徵之後,將數據挖掘技術引入管理,用以解決海量數據與貧乏信息之間的矛盾,所採用的技術有數理統計和人工神經網路( ann )兩種方法;接著,論文對識別、風險評價處理中的管理方法進行了研究,所提出的基於模糊概率的故障樹技術、隨機模擬技術和基於區間數的topsis方法都體現了管理的特點;最後,論文對信息系統( mis )在工程項目管理中的應用進行了探討,開發出一個管理信息系統。
  10. Health risk assessment

    健康風險評價
  11. The result shows that the risk evaluation model, overcoming the disturbing of many uncertain factors, can provide us with credible reference about the mergers & acquisitions directly and impersonally

    分析結果表明,利用多層次模糊綜合方法分析企業並購,可以克服很多不確定性因素的干撫,能更加直接、客觀地進行並購風險評價,並可為並購企業做出正確的並購決策提供可靠的依據。
  12. After that, a lot of research works were made in the vc ' s investment decision combined with many practical cases from the investment area to the investment composition. and the thinking structure of how to establish the investment strategy of a vc company has been found. avoid the risks which the vc faced effectively is the main purpose here

    並在此基礎上運用風險評價的定性與定量理論分析相結合的方法,結合大量實際案例,以「投資公司應有效規避所面臨的投資」為基本出發點,從投資理念、投資組合到投資結構等方面進行了深入而細致的研究;提出了投資公司建立自己的投資戰略的方法。
  13. With deepens unceasingly to the credit risk cognition degree in our country banking, credit risk assessment method also is continually improved and enhanced, the corresponding credit management system is also consummated day by day. according to our country economic environment evolution, in this article we will divide our country banking industry credit system transformation into three stages : the planned economy time, planed the commodity economy time and the market economy time

    本文首先從我國銀行業信貸體制改革的三個階段,即計劃經濟時代、有計劃的商品經濟時代和市場經濟時代,按照時間的脈絡研究銀行貸款方法的演進過程入手,隨著對信貸認識度的不斷加深,信貸管理體制不斷完善,從無意識到粗放型的度測演算法,再到目前圍繞不同企業的不同特點進行差異化估,信貸風險評價方法也日趨成熟。
  14. Assessment on health risk of heavy metals in the second songhua river

    第二松花江幹流重金屬污染物健康風險評價
  15. Mercury contamination of crops and vegetables around the zinc smelting plant

    鋅冶煉廠周圍農作物和蔬菜的汞污染及健康風險評價
  16. Risk assessment of damage losses by debris flow

    泥石流災害破壞損失風險評價方法
  17. ( 3 ) the idea suggested in this paper of converting flood into utilizable resource 、 attempering flood by engineering means and supervising human behaviors in the flooded area. to overcome the various barriers arising from ideology 、 systems 、 technology and economy which the establishment of risk management system of flood will be confronted with, this paper also suggests a statistical approach to estimate extremum and the concept of gray - uncertainty risk in figuring flood risk and analyses the severe harmfulness of accidents of extremum risk, furthermore, supplements and perfects present quantity - analyzing method of risk loss

    3 、本文提出洪水資源化的觀念,以工程手段對洪水進行調節,以法律、行政、經濟、教育等綜合性的手段對人類在洪泛區中的行為進行管理,是削弱洪水的危害性、減輕洪水的有效方式,提高的防洪安全保障需求,實行洪水管理是必由之路。洪水管理體制的建立必然面臨觀念方面、體制方面、技術方面與經濟方面的重重障礙,並提出洪災風險評價的極值統計學方法和灰色-隨機率的概念,建立了其表達形式與計算方法,它完善了現有的損失量化方法。
  18. Rs - gis integration research on land use dynamic changes in western plain of jilin province

    水文響應單元法在鹽漬化風險評價中的應用
  19. The model includes three stages from hazard identification, risk estimate through risk evaluation, which can be divided into seven steps

    這種模式一般包括危識別、估算和風險評價3個連續過程,並可分解為7個具體步驟。
  20. In this paper, on the basis of the public safety risk assessment indexes, the risk assessment method for necessity of installing of the wind shielding screens for the bridge is put forward

    基於公共安全風險評價指標,提出設置障必要性的估方法;在此基礎上,基於對設置障費用和收益的分析,提出備選障方案優選估方法。
分享友人