驗探槽 的英文怎麼說

中文拼音 [yàntàncáo]
驗探槽 英文
exploration trench
  • : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
  • : Ⅰ動詞1 (試圖發現) try to find out; explore; sound 2 (看望) call on; visit; see 3 (向前伸出)...
  • : 名詞1 (盛牲口飼料或飲料等液體的器具) trough; manger (for water animal feed wine vat) 2 (兩邊...
  1. The effects of different current density on the alloying element content were discussed. based on the results, the optimal process condition was confirmed : pb ~ ( 2 + ) 80 - 90 g / l sn ~ ( 2 + ) 7 - 15 g / l ch _ 4so _ 3 ( dissociative ) 130 - 150 g / l composite additive 12 ml / l current density 2 - 6 a / dm ~ 2

    採用hull方法確定了甲磺酸體系電沉積pb - sn合金鍍層的電流密度范圍,並討了不同沉積電流密度下pb 、 sn合金含量的變化規律。
  2. In the process of work, according to complex geological conditions such as huge thick soft clay in site and top surface of possible pile foundation supporting course fluctuating in large amplitude, we adopted many advanced exploratory methods ( just as high accuracy exploration of shallow earthquake, crosshole wave velocity test, vane shear test, pressuremeter test, etc. ), we found out that there is an ancient groove of yangzi river in former plant site, therefore we suggested in time that plant site should properly be moved eastwardly, only this item saved nearly about 50 million for pile foundation project cost

    在工作過程,根據廠址區軟粘土厚度大、可能作為樁基持力層頂面起伏變化大等復雜地質條件,採取了多種先進的勘手段(如高精度淺層地震勘、跨孔波速試、十字板剪切試、旁壓試等) ,查明了原廠址區存在一個長江古凹,並及時建議廠址適當東移,僅次一項就節省樁基工程費用近5000萬元。
  3. The silicon plates are formed reverse four wimble array in koh solution by wet - etching technology. then the electrochemical etching experiments are done in three poles electrobath. and some technology questions such as heat oxygenation, light etching, wet etching and electrochemical etching have been analyzed. at the same time sample appearances are analyzed by scanning electron microscope. according to current burst model theory, the electrochemical deep holes etching mechanism are analyzed

    在三極電解中,進行了電化學深刻蝕的索性實。對氧化、光刻、濕法刻蝕和電化學刻蝕中的工藝問題進行了初步的理論和實研究,同時,採用sem對實樣品進行了形貌分析,並採用電流突破模型對電化學深孔刻蝕機理進行了理論分析。
  4. We studied the related parameter of notched blasting by the dynamic photoelasticity experiment simply. we also designed reasonable blasting parameter under the condition of laboratory

    通過動光彈爆破實對切爆破的相關參數進行了初步討,設計出在實室條件下的合理參數。
  5. The author mainly discussed the importance and some special notes in the proof - text of groundwork with other confreres, enhanced the owners and interelated departments ' recognition of the proof - text of groundwork, through a case study in shenyang city of liaoning province in northeast china

    摘要針對目前勘察市場地基工作存在的問題與不是,利用相關的技術規范並結合部分工程實例,討分析地基工作的重點及地質異常的處理方法,歸納總結地基工作出現問題的原因,重申地基工作的重要性,用以加強業主及相關部門對地基工作的重視。
  6. The dissertation is mainly including four section : the first is the experiments done in the tank, which will supply the reliable information of imaging data ; the second is image edge detection by the use of the art of the zernkie moments, which is used to detect the liner and threaded edge of the object, the third is the underwater camera calibration technique, the forth is automatic positioning the location of the camera by used of the art of cross - ratio, the result of which is satisfied

    本文工作分為四個部分:第一部分是水部分,它為后續的工作提供了可靠的圖像數據信息;第二部分是基於zom距的直線、曲線邊緣提取技術及相關的與處理技術;第三部分,水下攝像機標定技術研究,基於改進的tsai演算法,採用逐步分解的標定策略。並討了一種相對簡單的、靈活的標定技術;第四部分是攝像機定位技術研究,採用具有平移不變性的交比進行攝像機定位,模擬試的最大誤差不超過2 ,效果還是令人滿意的。
  7. After geological survey, shallow seismic profile research and electrical prospecting, the lay out of measuring line and the exploration result verified by drilling tests are presented in the paper which provides scientific basis for residential area planing

    論述了小區地質概況及淺層地震、電法勘察的物理前提,說明測線布置及工作方法對勘查結果輔以鉆證資料為修改小區住宅規劃布置提供依據。
  8. Influence of dc - rail zero - voltage notch on the output of the inverter is investigated, and an important conclusion is obtained that the direction of output current of the inverter is not effected by the voltage deviation produced by dc - rail zero - voltage notch, on the basis of which, a new simple correction approach is put forward. experiment results show that the proposed correction method is effective

    索了直流母線零電壓凹對逆變器輸出特性的影響,得出了母線零電壓凹形成的輸出電壓偏差與逆變器輸出電流方向無關這一重要結論,在此基礎上,提出了一種簡便的校正新方法,通過試證了該校正方法的有效性。
  9. From the results of constraining fault displacement and correlation between the sediments in these trenches, we found a complete paleoseismic activity history on the fault segment during that period of time

    由斷層位移量限定法和多法判定,這一時期該斷裂的古地震活動歷史是完整的。
  10. In order to make integration of theory with practice, a lot of experiments have been done. mask - making technology, photoetching and wet - etching processes have been optimized. the author also presents the application and commercial value of silicon v - groove arrays

    在實踐上,對製作工藝積極索,提出新的制備硅掩蔽膜的工藝方案,對影響光刻質量的因素深入分析,試摸索出適用於v型的各向異性濕法腐蝕的腐蝕液配方,獨立優化設計了製作硅v型的相關工藝,製作出高質量的硅v型
  11. In this paper, the preparation of the source of chromium was explored. i lull cell test was used to have the research on the prescription of trivalent chromium plating solution by single factor test and orthogonal test

    本文索了新型廉價鉻源的制備方法,並應用赫爾,對三價鉻鍍鉻溶液的主要配方及成份進行研究。
  12. Through studying the cptu chamber test with the soil as a medium in door, according to the stress which generated in the course of probe penetrating, include axial additional stress and radial additional stress, measured by subminiature pressure cells which buried in the soil. this paper analyzed the rule of variation of axial and radial additional stresses, and compared with each other

    摘要通過以粘土為介質的孔壓靜( cptu )模型研究,根據埋置在土中的微型土壓力盒在貫入過程中所則到的土應力(軸向附加應力和徑向附加應力) ,分別分析了軸向和徑向附加應力的變化規律,並進行了比較。
  13. ( 3 ) through dimension analysis, factors that affect the flow deceleration through frames are discussed. based on flume experiments, this study indicates the velocity near the bed decreases as the l / h increases, and the l / h decreases, the influence of frames height on the effect of velocity near the bed is not distinct ( 4 ) by 2 - d mathematical model, patterns of flow through frames are analyzed and the influence of different frame formations on the protection zone is researched, mean velocity in vertical decreases and protection zone enlarges as the l / h, b / b and a / h increases

    ( 3 )通過因次分析,討了四面體框架群減速率的影響因素,並進行了系列水,得出:近底流速的減速率隨框架群相對長度l h的增加而增加,隨框架群相對間隔距離l h的增加而減小;框架群高度對近底流速的減速率影響不大,框架群高度的增加主要表現為減速區的增高。
  14. Based on the theoretical analysis of splitting mechanics and by the dynamic photoelasticity experiment, we studied the judgment how rock and concrete split under the affection of notched blasting. we built up the splitting mechanics model of rock and concretes under the affection of notched blasting. beyond all above, we gain the mechanism of notched directional splitting controlled blasting

    本文在斷裂力學理論分析基礎上,通過動光彈爆破實討了在切爆破作用下巖石和混凝土的斷裂判據,建立了在切爆破作用下巖石和混凝土的斷裂力學模型,並由此得出切定向斷裂控制爆破機理。
分享友人