高架車道 的英文怎麼說

中文拼音 [gāojiàdào]
高架車道 英文
elevated driveway
  • : Ⅰ形容詞1 (從下向上距離大; 離地面遠) tall; high 2 (在一般標準或平均程度之上; 等級在上的) above...
  • : Ⅰ名詞1 (用來放置東西或支撐物體等的東西; 架子) frame; rack; shelf; stand 2 (毆打; 爭吵) fight;...
  • : 車名詞1. (中國象棋棋子的一種) chariot, one of the pieces in chinese chess2. (國際象棋棋子的一種) castle; rook
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • 高架 : elevated; overhead
  • 車道 : (traffic) lane
  1. After expounding the power supply and current collection modes of the rolling stock in shanghai umt pearl line in terms of technology and economy, the author argues that two current collection modes shall be adopted for shanghai umt pearl line, i. e. a third rail collector be on skybridge while the overhead contact line on the ground

    摘要闡述了城市軌交通輛供電受流方式的特點,並從技術和經濟兩方面對上海明珠線輛供電受流方式進行了探討,提出了明珠線輛應採用雙受流方式,即橋上採用接觸軌受流器受電,地面採用空接觸網受電弓受電。
  2. New hampshire s publicly - owned aerial tramway, the first erected to a mountain top in north america, is located in franconia notch near the old man of the mountain

    新漢普郡的公有的空纜是北美第一山索,它位於the old man of the mountain附近的franconia notch
  3. For the remaining eight at - gradeoverhead stations ( tseun wan, kwai hing, kwai fong, ngau tau kok, kowloon bay, kwun tong, heng fa chuen and chai wan ), retrofitting of platform screen doors involves major alterations to the stations and tunnel ventilation, air - conditioning and smoke extract systems. since such at - gradeoverhead stations are not designed with air - conditioning and ventilation systems, retrofitting works are subject to technical constraints

    至於其餘8個現時沒有月臺幕門的地面及站(即荃灣、葵興、葵芳、牛頭角、九龍灣、觀塘、杏花?及柴灣) ,加裝月臺幕門系統須涉及重大工程,包括站及隧通風系統、冷氣系統及抽風系統等的大型修改工程。
  4. Lai chi kok viaduct - a 1. 4 - kilometre dual three lane elevated carriageway from lai wan interchange to butterfly valley

    築建荔枝角路築建一條長1 . 4公里由荔灣交匯處至蝴蝶谷的雙程三線分隔高架車道
  5. Mr lo said : the route 8 project under construction is to provide a 15km long dual three carriageway between tsing yi and sha tin. it comprises the nam wan, eagle nest and sha tin height tunnels, the stonecutters bridge and a number of viaducts and interchanges

    盧耀楨說:興建中的八號干線工程,是一條連接青衣及沙田的雙程三線行路,全長十五公里,當中包括南灣隧尖山隧及沙田嶺隧昂船洲大橋和交匯處。
  6. Equipment disposition : the standard disposition is single raodway, special components such as double roadway girden frame, high resistance stress frame of triangular bridge type can be used

    器材配置:標準配置為單,可選配雙橫梁、抗剪等專用構件。
  7. If the city ' s 4m cars, jammed onto the multiplying ringroads and flyovers, do not get them, the polluted air will

    就算擁堵在不斷增加的環城公路和路上那四百萬輛汽沒把他們怎樣,污染的空氣也會給他們構成威脅。
  8. By this means, the performance of the shock absorber is improved as well as the quality of suspension system. after tested on the testing equipment and on the road condition matched with the car, outer performance of the double - tube gas hydraulic shock absorber pr ove to be excellent and the indicator diagram are full and smooth. the operation and control of vehicle are also obviously improved. with the improvement of domestic components as well as gas charging equipment and gas charging workmanship, the double - tube hydraulic shock absorber meets domestic market requirements and will have a better prospect

    我們對研製的雙筒充氣液壓減振器進行了臺試驗和裝路試驗,表明這種減振器具有優良的外特性,其示功圖豐滿、圓滑,輛操縱性明顯改善。隨著我國零部件質量水平的提,及充氣設備、充氣工藝的改進,雙筒充氣液壓減振器將有更廣闊的發展空間,適合我國的國情。
  9. Yuen long station is located at the eastern edge of yuen long town. this elevated station will provide a passenger interchange with light rail, two new public transport interchanges and parking facilities. an extensive network of footbridges, escalators and stairs will also be built so that passengers can move conveniently around and through the station

    這個站將與輕鐵交匯,並設有兩個新建公共交通交匯處和泊設施,同時亦會興建一個完善的通網,以多條行人天橋、電動扶梯及樓梯連接,方便乘客及行人穿梭來往該站。
  10. The beiren hotel is a two star hotel located on the zhong shan road, near the railway statione 2 km, near west hong qiao airport 5 km, near national road 204, 312, near motorway shangai - jia xing and snaghai - ningbo. a perfect choice for both the holiday or business travelers

    北人酒店集商務度假娛樂於一體,雄峙申城最大規范的中山北路物貿街,東鄰上海火站,西距虹橋機場,北接204 312國和滬寧滬嘉速公路,內環線與浦東開發區緊密相連,輕軌明珠線鎮坪站一步之遙。
  11. In this paper, on the basis of reviewing the traditional handling technology in container terminal, the handling technology of existing automatic container terminal is introduced : automated ohbc crane 、 agv - rmg 、 drmg - crmg relay

    摘要在回顧集裝箱碼頭的傳統裝卸工藝的基礎上,介紹了現有集裝箱自動化碼頭的裝卸工藝:行式自動化場橋與軌式龍門吊配合;自動搬運( agv )與軌式龍門吊配合;型軌吊( drmg )和矮型軌吊( crmg )接力式。
  12. These signs are often found near elevated roads, flyovers and underpasses

    這些標志多見于路行天橋和隧
  13. Although there are many literatures describing ultrasonic detector for traffic flows, none of the same category has referred the techniques applied in the design herein such as multi - sensor construction, automatically establishing datum line regardless of suspension height, digital filtering and multi - lane detection as well as measuring length of motorcade

    目前有關超聲波流檢測器的文獻較多,但本設計中採用的多探頭結構、自動標定超聲波探頭的度、數據濾波以及多測量和檢測隊長度等技術在同類設計中未見使用。
  14. Runyang changjiang highway bridge is a main bridge of across changjiang in jiangshu province, with six lances for 100km per hour designing vehicle speed. it ' s deep - large rivet foundation at the north embankment, in shiye, zhenjiang. is a important part of the suspension bridge

    潤揚長江公路大橋是江蘇省「四縱四橫四聯」的公路主骨和跨長江通的重要組成部分;是一座設計速為100km h的六速公路特大橋。
  15. B construction of a 1. 5 km west tsing yi viaduct with hard shoulders connecting nam wan tunnel and existing cheung tsing highway

    B興建一條約1 . 5公里長設有與行線等寬硬路肩的,將擬建的東青衣連接至長青公路
  16. The san fat stop will be elevated to link directly with the station concourse. pedestrian access will be provided between the station and ho tin stop

    新發站將會重建為站,與西鐵相連,另外屯門站會有行人通與河田站連接。
  17. After analysing the different features of vehicles enterprise patterns in urban mass project, the author employs the quantitative way to calculate the patterns of purchase, financing lease and business lease, and compares the costs of all kinds of vehicles enterprise pattens based on the analysis of the overhead mass transit project in gonghe road in shanghai

    摘要分析了城市軌交通專案中輛投資幾種方式的不同特點;採用定量分析方法對購買、融資租賃及經營租賃幾種方式進行了計算分析,並以上海市共和新路交通項目為例進行了算例實證分析,對各種輛投資方式的成本進行比較。
  18. An elevated structure with the concourse at ground level and the platform at viaduct level, the station will offer parking facilities and a public transport interchange

    站的大堂建於路堤上,月臺則設于空行層,設有泊設施和公共交通交匯處。
  19. Limited access highways, tunnels, bridges, elevated roadways, and air - right structures

    公路隧橋梁和航空用結構物的限定出入口
  20. The bridge and approach viaduct were opened to traffic in may 1998

    這條大橋及其工程於一九九八年五月通
分享友人