高爐工 的英文怎麼說
中文拼音 [gāolúgōng]
高爐工
英文
blast furnace man-
In our company we have forging, costing and heat treatment workshops with advanced producing equipments. all the tasks which refused by the other companies will be done well here. there are many large - size air hammers, blast furnaces and costing equipment including all sorts of heats treatment equipment, costing equipment including all sorts of heat treatment equipments
我公司下屬鍛造鑄造熱處理加工廠各一座,有先進的生產設備,可以接收其它部門不願承攬,甚至不敢承攬的艱巨任務,我們有大型的空氣錘和高爐冶煉鑄造設施和場地,有淬火退火回火各種熱處理設備。The blast furnace is not in commercial use.
高爐法尚未在工業上應用。Its current products include : top oscillation electrical precipitator, side electrical oscillation precipitator, magnetism controlled static electricity precipitator, wet electrical precipitator, honeycomb electric catching tar instrument, high - pressur silicon rectifier equipment and plc low - pressure controlling system, blast furnace gas impulse precipitator, high concentration pulverized coal collector, coke oven and boiler flue gas low pressure impulse precipitator, blower fan inhaler, crossing piping gas cooler, high temperature fume cooler, gyre - orientation impulse hop - pocker and all sorts of molded sections
目前主要產品有:頂部振打臥式電除塵器、側部振打電除塵器、磁控靜電除塵器、濕式電除塵器、蜂窩電捕焦油器、高壓硅整流裝置及plc低壓控制系統、高爐煤氣脈沖除塵器、高濃度煤粉收集器、焦爐及鍋爐煙氣用低壓脈沖除塵器、風機空氣過濾器、橫管式煤氣冷卻器、高溫煙氣冷卻器、回轉定位脈沖大布袋及加工各種冷彎型鋼。The products are widely applied to lander, branch lander and safety liners of large and medium - sized high furnaces with one - time iron capacity of over 100thousand tons. after rectifying, the iron capacity can be as much as over 300thousand tons
同時具有抗氧化、耐熱震、烘烤時間短、施工方便等優點,廣泛應用於大中型高爐出鐵主溝、支溝和安全襯,一次性通鐵量十萬噸以上,經修補后通鐵量可達三十萬噸以上。Senior advisor of company, is the first drafter of the arc furnace transformer standards and the copy writer of the only domestic works onfurnace transformers as amember of bational transformer standardization committee and editoral com - missioner of magazine transformers
高級顧問張懋魯高級工程師為全國變壓器標準化委員會委員變壓器雜志編委,是煉鋼爐變壓器標準的第一起草人,是國內唯一電爐變壓器著作的撰稿人。The content of this paper came from the renovation project of the proportioning system of no. 3 blast furnace in hefei steel & iron co. the former proportioning system became the bottleneck of the iron production due to the aging equipment and the low - level automation
本論文的工作內容來自合鋼3 #高爐槽下配料控制系統改造工程。合鋼3 #高爐原有配料系統由於設備陳舊,自動化水平較低,已成為高爐煉鐵的瓶頸。According to fuel and and operation condition in chongqing iron and steel group corporation, many kinds of advanced technologies are adopted, such as closed loop soft water circulation cooling, copper cooling stave, bell - less top with central charging hopper, carbon bricks combined furnace bottom with ceramic cup, russia top burner type hot air stove, duplex preheating of hot air stove, and nut coke charging
摘要根據重鋼高爐的原燃料條件和操作條件,設計了重鋼四高爐擴容性易地大修工程,採用了全軟水密閉循環冷卻、銅冷卻壁、串罐式無料鐘爐頂、炭磚陶瓷杯復合爐缸、俄羅斯「卡魯金」頂燃式熱風爐、熱風爐雙預熱、焦丁入爐等先進技術。Abstract : by utlizing abundant local resource of ytirium and combining the characteristics of magnesium, barium, calcium and silicon, a sort of composite nodulizer - ytirium - based heavy rare earth nodulizer was developed which is characterized by its good desulphurizing and deoxidizing rate effect, excellent effect to neutralize anti - nodulizing effect of trace elements, strong nodulizng effect and degeneration - resistance, good effect to fine matrix structure, decreased chilling tendency and wide scope of applicatiom using this nodulizer to produce some important castings such as water - cooled wall of blast furnace and roller could increase mechanical properties of central area and casting yield
文摘:利用江西省豐富的釔基重稀土,結合鎂、鋇、硅、鈣等元素的特性開發了釔基重稀土復合球化劑,該球化劑具有脫硫、脫氧、抗干擾元素、球化和抗球化衰退能力強,細化基體組織,白口傾向小,適用范圍寬等特點,應用於高爐冷卻壁,軋輥等關鍵鑄件上可提高心部力學性能和工藝出品率。For large blast furnaces, the change of main operation parameters are analyzed and gas channels in high temperature and lower part of blast furnace an discussed for three modes
在大型高爐工況條件下,解析了3種富氧操作方式下主要冶煉參數的變化規律,以及高爐下部高溫區煤氣通道狀況。The results of experiments taken in handan iron & steel co. ltd show that adoption of lining protection by slag splashing can drastically extend furnace campaign, reduce consumption of refractory material and improve availability of converter, thus achieving remarkable economical benefits. it is worthy of being extensively applied
邯鋼的濺渣護爐試驗結果表明,採用該工藝能大幅度提高爐齡,降低耐火材料消耗,提高轉爐作業率,綜合經濟效益可觀,值得推廣應用。Development and comment on non - blastfurnace iron - making process
非高爐煉鐵工藝的發展及評述A new technology of oxygen - enriched blasting for the first tap of blast furnace has been developed. the blast furnace can be tapped smoothly and operated normally after blast. the accident of tap failure, followed by tuyere burning due to slag going up can be avoided
利用富氧燃燒技術研究一種高爐首次出鐵時吹燒鐵口新工藝,使休風后的高爐出鐵順利,盡快達到高爐順行,避免鐵水出不來,爐內渣面上漲,風口燒穿等事故的發生。They can be found in circular cast houses of blast furnace, in oil - sealed dry gasholders and in workshops with curved cranes. cross sections of these curved members are of various types, such as il - shaped, i - shaped, channel, box and h section without any symmetrical axis
曲線梁在工業和民用建築中也常有應用,在高爐環形出鐵場、乾式煤氣櫃內部結構以及某些有工藝要求的廠房內,常需採用不同截面形式的環形曲梁。It is also obvious that the overall operational objectives, the market, existing blast furnace equipment as well as operational know how additionally play an important role in defining the production strategy
很顯然,整個工藝過程的目標、市場狀況、現有高爐的裝備水平和高爐工藝操作水平在生產決策中起著十分重要的作用。Abstract : it analyses reduction machanism of silicon in femn blast furnace , basic conditions, ways and technological measures to smelt low silicon blast furnace femn, points out the technical and economical advantages of smelting low silicon femn in blast furnace
文摘:分析了錳鐵高爐內硅還原機理、冶煉低硅高爐錳鐵的基本條件、途徑和工藝措施,指出了高爐冶煉低硅錳鐵的技術經濟優勢。Used for clay bricks, high aluminum bricks masonry in acid resistance furnaces
用於高爐、熱風爐及其它工業窯爐砌築輕質粘土磚、輕質高鋁磚。Through researching the con - structon methold of explording stove lump, disposing blasting residual things, residual waste iron of furnace bottom and furnace waist brick, we have developed the disposion stove liners construction craft in the middle and later term of construction blast furnace in pangang group
通過對炸爐瘤、處理爆破殘留物、爐底殘渣鐵和爐缸磚的施工處理方法的研發,形成了攀鋼高爐中後期爐襯處理施工工藝。This thesis pays more attention to introduce how to use pattern identification and computer software technology handily to analyze the process parameters and discuss the optimization study during forge iron smelting process in a steal plant
本文重點介紹了在某鋼廠高爐煉鐵過程中,如何巧妙地運用模式識別和計算機軟體技術,對工藝參數進行分析和優化研究的探討。Firstly, through introduce bf technics to analyse characteristic of bf technics flow, bring forward mostly model of bf manufacture and take to a certainty study and discuss, and expound the function of every model
首先,通過介紹高爐工藝,分析了高爐工藝流程及其特點,提出了高爐生產的主要模型,並進行了一定研究和探討,以及各模型的功能闡述。As general manager of jiansu dayang engineering construction suporvision co. ltd, argainze and complete supervision for nangang no. 3. blast earnace project, plate plant rehead eurrace transforing projecte andit inspection works constraction achieving the desired results in timo control quality conforl, cost contral and sefty contral etc
作為江蘇大陽工程建設監理公司總經理,組織完成了南鋼3 #高爐工程,中板廠加熱爐改造工程,中板廠探傷廠房建設工程等項監理業力,均很好的實現了預期監理目標,在工程進度、質量、投資安全的控制上取得了顯著成效。分享友人