點負荷 的英文怎麼說

中文拼音 [diǎn]
點負荷 英文
point load
  • : Ⅰ名詞1 (液體的小滴) drop (of liquid) 2 (細小的痕跡) spot; dot; speck 3 (漢字的筆畫「、」)...
  • : Ⅰ名詞1 (負擔) burden; load 2 (虧損) loss 3 (失敗) defeat Ⅱ動詞1 [書面語] (背) carry on th...
  • : 荷名詞(蓮) lotus
  • 負荷 : [電學] load; charge; weight
  1. With distributed control system, mscis possesses the characteristics of centralization of it " management, distribution of it " functions, burthen and malfunctions

    Mscis介面系統採用分散式體系結構,具有管理集中、功能分散、分散、故障分散和易於擴展的特
  2. Distributed control system ( dcs ), with the characteristic of centralization of its management and the distribution of its functions, burthen and malfunction, is widely used in the process of modern industry

    分散式控制系統( dcs ) ,由於其功能分散、分散、故障分散、管理集中和易於擴展的特得到廣泛的應用。
  3. To resolve agc problem perfectly, the base is unit burthen control. the famous coordination control scheme - direct energy balance ( deb ) method - is still the focus of the thermal power plant control domain

    而圓滿解決agc問題的基礎在於機組控制,聞名於世的直接能量平衡( deb )法協調控制方案,一直是火力發電廠控制領域關注的焦
  4. Long - hole and geometrical proportion type of mixing unit is finally adapted in lpg supply system, and power and torque output of lpg engine are improved by increasing compression ratio, and ignition characteristic is tried to adjusted to satisfy engine performance. meantime emission performance and noise level of lpg engine at full - throttle and other various part - throttle operations are tested and compared with former gasoline engine. ( 3 ) it is verified by engine dyno tests that lpg engine has better synthesized performance at aspects of power and torque, fuel economy, as well as emission than former gasoline engine

    選擇了等比例長孔式混合器控制空燃比;通過提高壓縮比來彌補動力性的損失;以動力性為主控目標,對最大功率、最大扭矩、中等轉速、最低轉速所對應的發動機轉速做了火特性的調節;通過空燃比的合理控制,直接改善發動機的動力性、經濟和排放指標;作為對缸內燃燒過程的理論分析,進行了燃燒特性的實驗測試;對原汽油機和新開發的液化石油氣發動機,進行了外特性和部分特性以及怠速的排放及噪聲對比性測試。
  5. In the process of arithmetic design, newton " method is used to compute power flow of network. graph theory knowledge is used to determine all paths from generator to load. to improve efficiency, thesis use branch expunction method to optimize the node order

    在演算法設計過程中,採用牛頓拉夫遜法進行潮流計算得到系統潮流分佈,利用圖論原理中的路徑搜索演算法確定了發電機對的供電路徑,此外為了提高潮流跟蹤的計算效率,利用了支路消去法進行節順序的優化。
  6. The calculation and design procedures of air conditioning load, ground loop heat exchangers, radiant floor system, distribution system between heat pump and build are mainly introduced

    介紹了建築空調計算、地下埋管換熱器系統、輻射地板系統以及熱泵和建築物內分配系統設計等方面的內容。
  7. The key process of the algorithm, called nodes transforming to arcs, is based on the calculation loads of coupling nodes and arcs loads from the loads of switch nodes. getting the area of coupling nodes is the most important process in nodes transforming to arcs. this paper presents a new method , which uses the adjacency matrix of distribution network and the information matrix of

    變結構耗散網路是一種新的配電網自動化演算法,由配電網開關頂點負荷求弧和耦合頂點負荷弧變換是整個演算法中確定配電網饋線故障區域的基礎,而進行弧變換的關鍵就在於分離耦合區域。
  8. Alter calculating the residual loads with the latest 15 - day forecasting results and actual values, the weather factor can be taken account to improve the forecasting precision by regression analysis between the sensitive residual loads and temperature

    若將最近15天左右預測值與實際值之間的差值,再通過各敏感點負荷與平均氣溫等作回歸分析,可以實現考慮天氣的求導法。
  9. It is built using graphical technology of geographic information system and can be used as the graphical plate for power system software, making the operation and the management of the devices easy and intuitionist, and the analysis of network topology more automatic and accurate. in the aspect of the calculation of loss, this system calculates the loss of the active power and reactive power, forms the result in the database considering the differences of load - curves at every node, and allows the property or queries loss of the devices using graphic interface

    它以地理信息系統( gis )的圖形化技術為基礎,為電力系統軟體架設圖形化平臺,使設備的操作、管理更加直觀,使電力系統的網路拓撲分析程序更加自動化、準確;在線損計算方面,考慮了各點負荷曲線的不同,可以從計算結果中分別統計有功損耗和無功損耗,也可以方便的在配網圖上對各種元件進行屬性查詢,損耗查詢等。
  10. Third, draw a unilateral line from every load node to the sink point. the line ' s capacity is the load value of the node and the cost is zero

    從所有到匯各引一條單向弧,弧容量為節點負荷值,弧費用為零。
  11. From the view of the engineering application, large - scale power grid load modeling addresses modeling the load distributed at various sites. after analyzing the inefficiency of the group algorithm for modeling load for large - scale power grid, the dissertation proposes a load modeling approach for large - scale power grid based on the aggregation theory, thus solves the measurement - based large - scale power grid load modeling

    筆者結合基於量測和基於元件兩種建模方法,首次提出了基於聚合理論的大區電網建模方法,定義了模型向量基的概念,解決了基於量測建模領域對不同物理地點負荷建模的問題。
  12. By combining the advanced modern mathematical modeling theory with the advanced database application and development tools and software engineering, this paper proposes the new mathematical model, and through programming realizes the 24 - hour data forecasting of punctual load, daily peak - to - valley load and daily average load in the area

    本文將現代先進的數學建模理論與數據庫應用開發工具、軟體工程技術相結合,提出了適用該地區電網預報的數學模型,通過編程實現了該地區電網24小時的正點負荷、日峰谷值、日平均等數據預報。
  13. Plastics - determination of creep behaviour - part 2 : flexural creep by three - point loading

    塑料.蠕變性能測定.第2部分:三點負荷下的撓曲蠕變
  14. Standard test method for flexural strength of soil - cement using simple beam with third - point loading

    用簡支梁三點負荷法測定摻土水泥抗撓強度的標準試驗方法
  15. The biggest contact load : 100w

    最大觸點負荷: 100w
  16. The problem of overloaded aps can be quite severe in areas of high user density

    存取點負荷過重的問題,在用戶密度高的區域內會變得相當嚴重。
  17. Standard test method for determination of breaking strength of ceramic tiles by three - point loading

    點負荷法測定陶瓷磚斷裂強度的標準試驗方法
  18. Standard test method for flexural strength of manufactured carbon and graphite articles using four - point loading at room temperature

    在室溫下用四點負荷法測定炭加工品及石墨製品撓曲強度的標準試驗方法
  19. Discuss the factor influencing the lsc value : network structure, distributing proportion of load, power supply configuration. analyze every factor by examples

    並深入探討了影響lsc的幾個因素:電網拓樸結構、節點負荷分佈比例、電源配置,對每個制約因素分別進行了算例分析。
  20. Firstly, the paper studies the characters and sorts of load. based on the analysis of five domestic power utilization segment markets, the relations among electricity consumption of different industries and its influencing factors are built up and respectively modeled to perform comprehensive forecasting

    本文首先對的分類與特性進行了研究,並在此基礎上分析了五大用電細分市場的構成以及氣溫與降雨量等對各細分市場的影響特徵,將不同行業的用電與其影響因素建立了有針對性的聯系。
分享友人