bed form 中文意思是什麼

bed form 解釋
底形
  • bed : n 1 床,床鋪;床位,鋪;(動物的)窩;〈比喻〉安樂窩,墳墓;床墊;睡眠;就宿。2 婚姻,夫婦關系。3...
  • form : n 1 形態;形狀;樣子,外貌;【哲學】形式 (opp content)。2 人影,物影。3 格式;表格紙 (= 〈美...
  1. I was personally shaken form my bed as furniture was falling, concrete chunks started falling from my hotel room as people were running out in panic and in their bed clothes

    我自己在床上被搖醒,傢具在塌陷,混凝土塊開始在我房間掉落,人們穿著睡衣慌亂地從房間跑出。
  2. For some sediments and flow the flat bed does not occur and the bed form goes directly from dunes to antidunes.

    對某些泥沙和水流,平整床面並不發生,而床面形狀則直接從沙壟轉為逆行沙壟。
  3. Bedload is the main factor resulting in bed form for few sands of suspend load in the river bed

    河床質中幾乎沒有懸移質顆粒,對河床演變起主要作用的是推移質泥沙。
  4. Time - dependence of the mathematical model is taken into account, and time - dependent form of pens is deduced. 5. numerical analysis of heat and mass transfer in the adsorbent bed is presented, transient distribution of pressure, temperature, velocity and adsorption in it is obtained

    對吸附床的傳熱傳質規律進行了數值分析,獲得了吸附床內部的瞬時溫度壓力、吸附質速度、吸附率分佈,並通過實驗數據驗證了數學模型。
  5. Bed form superimposition

    底形疊加作用
  6. Bed form roughness

    底床糙度
  7. Then river width increased and the intensity of deep point lowing and bed material coarsening decreased and water level lowed continuously. so the bed form changed toward to u type. the bed regulation is realized through sediment silting in different parts in cross section during silting period and the deformation of bed form changed from broad u type channel to narrow and deep v type channel

    研究表明,河道在持續沖刷前期深泓點及水位下降與河床粗化同步發展,河床向v型發展;沖刷後期深泓點下降、河床粗化減弱,河道展寬增大,水位繼續下降,河床向u型發展;在以淤積為主時期的調整,是通過斷面不同部位的淤積來實現的,但都是由u型較大河槽向v型窄深小槽發展。
  8. Whether sand can saltate from sand bed surface and quality of sand incipience are very important to the sand transport and the form of wind - blown - sand

    沙粒能否起動以及起動質量如何,如起動初速度、起動角度等參數都直接關繫到沙粒的輸運和風沙兩相流形成。
  9. Adsorption isotherm of activated alumina and bone char can be described by langmuir adsorption isotherm in the form qe = 0. 72cy ( l + 0. 074ce ) and freundlich isotherm in the form qe = 0. 88ce1 / 1. ' 94 respectively. continuous - flow column experiments show there have higher removal capacity for activated alumina and bone char when empty - bed contact time was controlled within 12 ~ 15min and about 15min separately

    對可利用吸附容量和實際利用吸附容量的理論分析說明,連續處理活性氧化鋁停留時間控制在12 15min較好,此時吸附容量利用率較高,約為80 ,骨炭停留時間控制在15min較好,吸附容量利用率約為75 。
  10. Coarse gravel or crushed rock laid to form a bed for roads or railroads

    道碴用來鋪公路或鐵路路基的粗砂礫或碎石
  11. Beam side form shall be installed after all work inspected and accepted such as beam rebar work, cushion block laying, steel inserts installation, steel doweling and pocket molding bed, etc

    綁扎梁筋,墊保護層墊塊,安放埋件、插筋、預留孔胎模等,經檢查合格后扣梁側模。
  12. From the characteristic of district gravity, the characteristic of remote sension. we can see that ore area develops south - north consotium rift. it not only controls the eastern edge of zhenxun basin, but also controls the form of bed

    礦床類型以沉積、沉積?改造型為主。根據區域重力特徵、衛星影象和其他地質特徵,礦區所在部位,發育南北向的同生斷裂。
  13. We view fresh gas entering the bed only in the form of gas bubbles.

    新鮮氣體可視作僅以氣泡形式進入床層。
  14. In the storm, the part on surface layer of the underlying bed will produce the liquefaction, the absolute standing wave that form the front of the structure may bring 6. 16 meter depth of the liquefaction, so the foundation of structure will lose part of the supporting force, the structure will slide in this situation. that is to say, because of the foundation partly liquefaction, the exist of soft layer and the component force of gravity, the structure slide further to the basin and collapse, which leads to disastrous consequence

    在強暴風浪下,底床表層1 . 75米以上均有可能產生液化現象,而在構築物前形成的完全駐波,甚至能夠造成6 . 16米的液化深度,構築物地基部分失去支持力,將直接導致構築物的滑動,也就是說,在地基部分液化、軟弱層的存在以及構築物沿坡重力分力的共同影響下,構築物將向「盆」底方向發生更大的滑動,甚至可能發生倒塌。
  15. On the bed, at full length, and faintly illuminated by the pale light that came from the window, lay a sack of canvas, and under its rude folds was stretched a long and stiffened form ; it was faria s last winding - sheet, - a winding - sheet which, as the turnkey said, cost so little

    借著從窗口透進來的一線蒼白微弱的光線,可以看到床上有一隻平放著的粗布口袋,在這個大口袋裡,直挺挺地躺著一個長而僵硬的東西。這個口袋就是法利亞裹屍布,正如獄卒所說的,這的確不值幾個錢。
  16. Ground - up shells of marine organisms mixed with pebbles, clay and eroded rock, deposited there over many millennia, now form a bed of muddy paste that is so soft and well lubricated that the ice streams can glide along even more easily than earlier researchers expected

    有科學家將積冰融化出一公里長的窄洞,採集古老海床的樣本,結果發現地底混雜了海洋生物殼體、礫石、黏土與風化巖,幾千年下來形成又軟又滑的泥床,使冰流較先前研究人員預期的更容易滑動。
  17. From building the foundation of the airport platform form the sea bed up, to determining the highest standards of service and convenience for passengers, the result is world - class in every aspect

    由建於海床的機場平臺地基工程,以至為旅客提供最優質、最方便的服務,一切都力求盡善盡美,使機場達到世界水準。
  18. The deformation intensely mechanism is the main kinetics and kinematics mechanism, which controlled the gold mine bed ' s form

    強烈的變形構造機制是金礦床形成的主要動力學、運動學機制。
  19. Jet grouting is a foundation treatment method that a high - velocity grout, which is forced under high pressure out of a nozzle, cuts into the soil to form a cylindrical soil - cement solidification, and with the result of that the bearing capacity of the foundation is enhanced and the settlement and the differential settlement are reduced. this process is widely used in constructional engineering, highway bridge, coal mine and railway bed

    旋噴注漿法可在地層深處將水泥漿液等以高壓旋轉沖切土體,形成水泥土圓柱加固體,構成旋噴樁復合地基,以達到加固地基,提高承載力和減少建築物的沉降和不均勻沉降的目的,在我國建築工程、公路橋梁、煤礦和鐵路路基等建設工程中應用極為廣泛。
  20. In particular dcu linearly increases with the cl concentration in, the fluid, indicating that cl can transport enough copper from the melt or other source bed to form the deposits. but dcu decreases with the s added in experimental system

    特別是在富cl流體中cu濃度較高,說明在富含cl的熱液流體能夠從共存的熔體中活化遷移出大量的cu , s的加入d _ ( cu )有降低的趨勢。
分享友人