branch line 中文意思是什麼

branch line 解釋
支線。

  • branch : n 1 (樹)枝〈泛指大枝或小枝;bough 特指大枝,也指連花、果折下的枝;limb 指大枝;twig 指小枝〉。2...
  • line : n 1 線;繩索;釣絲;測深度用繩,捲尺。 a fishing line 釣魚線。 be clever with rod and line 會釣魚...
  1. The london train pulled into the branch line station

    這列倫敦火車緩緩駛進了支線車站。
  2. This air line operates five main lines and twenty branch lines

    這家航空公司經營五條主幹線和二十條支線。
  3. Feasibility analysis of implementing heavy duty trains along branch line of mining area

    在礦區支線上開行重載列車的可行性分析
  4. Branch line conveyer

    支繩輸送裝置
  5. Branch line service

    支線列車運行
  6. Branch line winder

    支繩卷揚機
  7. Inductrial injury insurance is branch line of business, of each industries % it is different

    工傷保險是分行業的,各個行業的%是不同的。
  8. 1 it is used to connect the mainline of the town or a rural area telephone network and branch line

    1主要供城鎮農村通信網的主幹電纜與分戶的連接
  9. Formerly one was obliged to travel in india by the old cumbrous methods of going on foot or on horseback, in palanquins or unwieldy coaches ; now, fast steamboats ply on the indus and the ganges, and a great railway, with branch lines joining the main line at many points on its route, traverses the peninsula from bombay to calcutta in three days. this railway does not run in a direct line across india

    從前在印度旅行只靠那些古老的辦法,例如:步行騎馬坐雙輪車或獨輪車坐轎子用人馱坐馬車等等。如今在恆河與印度河上,有快速輪船航行。又有一條大鐵路橫貫整個印度,並且沿途還有支線。
  10. In line with china s commitment of opening of the finical market to wto, royal sunalliance shanghai branch was granted a license to transact business for not only local chinese companies but also individuals

    隨著中國加入wto和中國保險市場對世界的進一步開放,英國皇家太陽聯合保險公司上海分公司在中國的業務范圍除了為各種企業提供保障外,同時也獲得了個人保險業務的經營許可。
  11. In the part of modulation and demodulation, we analyzed the principles of harmonic mixer, detectors, power dividers / combiners and branch - line couplers

    對調制/解調器射頻電路部分,包括亞諧波混頻器、檢波器、功率分配/合成器和分支線耦合器基本原理進行了分析。
  12. In nov. 1921, the line from gejiu to caotu was opened. oct. 1928, the branch line from jijie to linan was opened and this line was extended to shibing at oct. 1934. these railway lines were called the gebishi railroad

    該鐵路公司得到鐵路鋪設和礦採的權利,可是因修建資金不足,推退到1915年才開工, 1921年11月完成了個舊經由雞街蒙自到草壩長72 . 2公里的鐵路。
  13. At callyan they reached the junction of the branch line which descends towards southeastern india by kandallah and pounah ; and, passing pauwell, they entered the defiles of the mountains, with their basalt bases, and their summits crowned with thick and verdant forests

    在卡連,火車撇開了右面通往坎達拉哈和浦那向東南延伸的鐵路支線,向波威爾駛去。從這里開始,火車便穿行在縱橫綿直的高止山脈里。
  14. We succeeded in crossing hanjing river of zhong - wu gas pipeline project, dawen river of jining branch line of west - east gas pipeline using the technique of trenching in water, controlling negative buoyancy and bottom towing without water interception

    公司採用帶水大開挖成溝,控制負浮力,管道底拖法等施工工藝,在江河不斷流的前提下,成功完成了忠武輸氣管道襄樊支線漢江穿越、西氣東輸冀寧支線大汶河穿越等工程。
  15. The paper based on summing up the practice experience, by reviewing the reform status and implement characteristics of the branch line of all of railway and dalian railway co., ltd., it analyzes the important problems and causes for the reform of railway line from different aspects, to elaborates the important meaning of the railway line and that dalian railway co., ltd. branch line implement " twice start undertaking ". through an introduction and a contrast for the reform status quo of railway branch line of germany, american, japan, by illustrateing the great inspiration from in it

    在總結實踐經驗的基礎上,把支線改革的現實措施與鐵路運輸體制改革的長遠目標結合起來,通過對全路及大連鐵道公司支線改革狀況及實施特徵的回顧,從兩個不同角度和側面分析了鐵路支線改革存在主要問題的成因,闡述了鐵路支線改革的重要意義及大連鐵道公司實施支線改革「二次創業」的現實意義,並通過對德國、美國、日本鐵路支線改革狀況的介紹與對比,闡明了相對于國外鐵路支線改革,中國鐵路支線改革的差距。
  16. The railway branch line reform is an important measures that well take the " separate of government and enterprise, reduce amount of staff and raise benefit, make up deficits and get surpluses ", it is an important part of that the railway implement the adjustment of industrial structure, it is necessary to establish and perfect the modern enterprise system, to explore transport system reform and switch managerial mechanism, it is an effective methods that improve the benefit of the railway transportation and the market competence. the paper ' s content is the railway branch line reform and the branch line " twice start undertaking " of the dalian railway co., ltd., with the reform practice of the branch line of the dalian railway co., ltd., and combine theory and practise, under the background of " separate of railway net and transportation ", " separate of main and branch ", how through the adjustment of structure, system reform and switch managerial tactics, settle the problem that exist and development the branch line. ther e are some reference value for 100 branch lines of china railway

    鐵路支線改革是抓好「政企分開、減員增效、扭虧為盈」的重要措施,是鐵路行業實施結構調整的重要內容,是建立和完善現代企業制度,探索運輸體制改革和經營機制轉換的需要,是提高鐵路運輸效益,增強市場競爭力的有效手段。本文以鐵路支線改革及大連鐵道公司支線「二次創業」為切入點,結合大連鐵道公司支線改革實踐,以理論與實踐相結合,探索鐵路支線運輸企業在「網運分離」 、 「干支分離」的大環境下,如何通過結構調整、體制改革和經營策略的轉換,解決管內支線的生存和發展問題。對全路100條支線的改革與發展具有一定的參考價值。
  17. With the 12 years " development, mawan has formed it ' s major scope of business from steal, cement and chemical fertilizer and other kinds of bulk cargo. at the same time, mawan does its best to manage container transportation as the branch line to develop it ' s business scope. and now mawan has becoming the most successful enterprise among shenzhen west port area

    經過十二年的發展,公司逐漸形成了以鋼材、水泥、化肥等散件貨為主的業務范疇,同時積極拓展支線集裝箱運輸、後方倉儲等經濟空間,目前已成為深圳西部港區各項經營指標(如營運能力指標、盈利能力指標、發展能力指標以及人均產值等)最好、最為成功的港口企業。
  18. Five cell circuits are designed, fabricated and tested, including 5. 625 degree and 45 degree using loaded - line phase shifter, 90 degree using 3db branch - line coupler phase shifter, 90 degree and 180 degree using switched - line with loaded - line phase shifter. according to the testing result of cell circuits, and requirement of ku - band six - bit digital phase shifter, the scheme for ku - band six - bit digital phase shifter is chosen

    本文對5 . 625度和45度相移位採用主線加載的加載線形式,對90度相移位採用3db支線耦合器形式和加載式的開關線形式,對180度相移位採用加載式的開關線形式,分別進行了五個單元電路的設計、製作與測試。
  19. He - yi road is the starting point section of he - nen road s303 in province highway and the important component of main skeleton of type " ok ". the starting point locates near zero - kilometre road section and the end point is in front of the railway station inyichun. the whole length is 153. 781km long, the main trunk highway is 141. 145km, the branch line is 12. 636km

    鶴伊公路是省道鶴嫩公路s303線的起點段,是我省「 ok 」型主骨架公路的重要組成部分。起點于鶴大公路鶴佳段零公里附近,終點位於伊春市火車站前,全長153 . 781km ,其中主線長141 . 145km ,支線長12 . 636km 。
  20. Because any component ( including segtion of line ) in distribution network belongs to the main line or branch line, this aogorithm classfies all the components in the distribution network into two type of aggregated components, feeder - node component and branch line - node component, and thinking the component fault is equivalent to the corresponding node component fault, adopting binary tree as the model of distribution network is very fast to traverse all the nodes and search of any node in the network

    根據配電網路中任一元件位於饋線或分支線這一特點,將整個網路的元件組合成饋線節點和分支線節點兩種集合元件,從而將元件故障等效為相應的節點故障,實現對配電網路模型的簡化,採用二叉樹模型作為演算法的數據結構,易於實現對整個網路節點的遍歷及節點的搜索。
分享友人