bridge engineering 中文意思是什麼

bridge engineering 解釋
橋梁工程學
  • bridge : n 1 橋,橋梁;【造船】艦橋,船橋。2 鼻樑;(假牙上的)齒橋;【音樂】弦柱,弦馬;【電學】電橋;【...
  • engineering : n. 1. 工程(技術),工程學。2. 開車技術。3. 土木工程,工事。4. 操縱,管理。
  1. As the commonly used foundations in the bridge engineering, large - diameter bored piles have many advantages, such as high bearing capacity, good stability, little and homogeneous vertical settlement, facility for mechanician construction and good applicability

    樁基礎是一種常用的橋梁基礎型式,具有承載力高、穩定性好、沉降量小而均勻、便於機械化施工及適用性強等特點。
  2. Use of the posttensioning prestress in the bridge engineering

    后張法預應力在橋梁工程中的應用
  3. Application of vibration reducer in bridge engineering

    減振裝置在橋梁工程中的應用
  4. Bridge engineering is important throat part in highways and railroads. it is critical to ensure its loading ability and normal function for smooth moving in a whole line

    橋梁工程是公路和鐵路的重要咽喉部位,確保其承載能力和正常使用性能是全線運行暢通的關鍵。
  5. The bore - hole cast - in - situ pile foundation has been born widely used in bridge engineering

    鉆孔灌注樁基礎在我國橋梁工程中應用極為廣泛。
  6. Creep analysis methods of high - rise buildings and large span buildings can only refer to creep coefficient method in bridge engineering or the method of degree of creep in hydraulic construction engineering under the present experiment conditions. in this paper, the incremental expressions of concrete creep and shrinkage strain when the initial computational age is not the same as the loading age are derived and corrected from the concept of concrete creep coefficient and the mean value theorem of integral and the principle of superposition. the differences of efficiency and accuracy of creep analysis between the finite element method with creep coefficient and the initial stress method with degree of creep are presented. this paper suggests that engineers should use the initial stress method with degree of creep to estimate the influences of creep on high - rise buildings and large span buildings on the basis of conceptual design

    基於現有的試驗資料,高層及大跨度民用建築的徐變分析只能參照橋梁結構中的徐變系數方法或水工結構中的徐變度方法進行.從徐變系數的定義出發,利用積分中值定理和疊加原理,推導並修正了加載齡期與起算齡期不同時徐變收縮應變增量的表達式,對比了應用徐變系數分析徐變的有限元法和應用徐變度分析徐變的初應變法在效率和精度上的差別,並建議應從概念設計的角度出發,採用徐變度的初應變法來估算徐變對高層及大跨度民用建築的影響
  7. Abstract : creep analysis methods of high - rise buildings and large span buildings can only refer to creep coefficient method in bridge engineering or the method of degree of creep in hydraulic construction engineering under the present experiment conditions. in this paper, the incremental expressions of concrete creep and shrinkage strain when the initial computational age is not the same as the loading age are derived and corrected from the concept of concrete creep coefficient and the mean value theorem of integral and the principle of superposition. the differences of efficiency and accuracy of creep analysis between the finite element method with creep coefficient and the initial stress method with degree of creep are presented. this paper suggests that engineers should use the initial stress method with degree of creep to estimate the influences of creep on high - rise buildings and large span buildings on the basis of conceptual design

    文摘:基於現有的試驗資料,高層及大跨度民用建築的徐變分析只能參照橋梁結構中的徐變系數方法或水工結構中的徐變度方法進行.從徐變系數的定義出發,利用積分中值定理和疊加原理,推導並修正了加載齡期與起算齡期不同時徐變收縮應變增量的表達式,對比了應用徐變系數分析徐變的有限元法和應用徐變度分析徐變的初應變法在效率和精度上的差別,並建議應從概念設計的角度出發,採用徐變度的初應變法來估算徐變對高層及大跨度民用建築的影響
  8. In the light of the bridge engineering application, this paper probes into the technology, effects and prospects of rayleigh wave method in the exploration of large and giant bridge sites and illustrate the feasibility and effectiveness of this method in such exploration

    摘要從橋梁工程應用出發,探討了瑞雷波法在大型特大型橋址勘察中應用的技術方法、實際效果和應用前景,說明了瑞雷波法在大型特大型橋址勘察的可行性與有效性。
  9. Earthquake reliability analysis of bridge engineering system

    橋梁工程系統地震可靠性分析
  10. Discussion about road and bridge engineering quality problems

    橋梁工程質量問題及其預探淺析
  11. Thin - walled box girder is often used in bridge engineering

    箱形薄壁梁是橋梁工程中經常採用的結構。
  12. Constructed by bridge engineering co. of sichuan prov

    四川省綿陽公路段設計市設計,四川省橋梁工程公司施工。
  13. The promotion of the bridge structural model competition on the bridge engineering course

    淺談橋梁結構模型競賽對橋梁工程教學的促進
  14. As a result of increasing bridge span, deck flexibility and structure complexity, earthquake analysis of long span cable - stayed bridge becomes one of the most concern and challenge problems in bridge engineering field

    隨著橋梁跨度、橋面柔性和構造復雜性的增加,大跨度斜拉橋的地震動研究已經成為橋梁工程界最關心、最具有挑戰性的課題之一。
  15. For example, the ji " an ganjiang grand bridge on jingjiu route, the great bridge of public highway from nanchang to jiujiang, the wanchun great bridges and this text a baibie harbor great bridge engineering etc.

    例如,京九線吉安贛江特大橋、南(昌)九(江)公路萬村大橋以及本文所述白墅港大橋工程等。
  16. The pseudo excitation method ( pem ) has brocken its efficiency - bottleneck, and appears to be quite effective in coping with such multiple excitation random analyses. therefore introducing the random vibration approach into the bridge engineering as a tool of seismic designs not only meets the objective requirement and the modem technological development, a good methodology background is also available

    虛擬激勵演算法突破了計算效率瓶頸,並且易於處理多點激勵問題。因此,將隨機振動法作為一種新的橋梁抗震設計方法引入我國橋梁工程界不僅符合客觀需求,體現了設計水平的現代發展趨勢;而且在方法論上也有了比較有利的條件。
  17. Some features of the engineering control network demand special applications of gps in road and bridge engineering, for example, particular requirement of accuracy on some aspect that results in distribution of net points and sometimes bigger height difference of points, consideration of staking out in construction in the design of engineering control network, application of independent engineering coordinate system, and use of engineering mean height surface as the projection surface of computation

    由於工程式控制制網的一些自身特性,如施工控制網要考慮施工放樣的方便,或某一方面精度的特定要求,網點分佈不夠均勻,點間高差有時較大;採用工程獨立坐標系,並且往往以工程平均高程面為計算投影面等等,使得gps在路橋工程中的應用也有一些特殊性。
  18. Taking the characteristics of road and bridge engineering into account, this paper makes systematic analysis and study on applications of static gps in data processing of surveying in road and bridge engineering : the feasibility of using single point positioning result as starting point is studied and the influence of it on baseline solution is discussed ; on account that the software provided along with instrument by vendors usually does not support coordinates in the independent engineering coordinates system from gps observations, a simple and effective method is represented for the gps data processing in the independent engineering coordinates system and is programmed. through real examples the method and programs are testified ; from gps surveying the wgs - 84 coordinates are acquired, while in reality coordinates in local coordinate system are needed, so conversion from wgs - 84 coordinates to local coordinates is necessary

    結合路橋工程的特點,對靜態gps在路橋工程式控制制測量中的數據處理作了系統的分析和研究: ?對單點定位結果作為起算點的可行性進行了研究,並探討其對基線解算的影響; ?鑒于商家提供的隨機軟體往往不支持利用gps觀測得到工程獨立坐標系中坐標,為工程獨立坐標系gps數據處理提供了一種簡便有效的方法,並編制了相關的處理程序,通過實例驗證,程序是正確的、方法是可行的; ? gps測量得到的是wgs - 84坐標,而實用上需要的是地方坐標系坐標,因而得把wgs - 84坐標轉換地方坐標系坐標。
  19. In recent years, as a new - type bridge, concrete - filled steel tubular ( cfst ) arch bridge has been deeply developed in our country ' s construction, for its own merits and can luckily make agreement with the factual situation of bridge engineering

    近年來,鋼管混凝土拱橋作為一種新興的應用新材料的橋型,由於自身的優點以及與我國的橋梁建設的實際情況相適合,因此得到了極大的發展。
  20. Railway jacking bridge engineering passing through sand pebble ( gravel ) layer, because it is a complex loose coarse fragment accumulation layer, the roadbed must be reinforced

    摘要鐵路頂橋工程中遇到砂卵(礫)石層時,因砂卵(礫)石層是一種復雜鬆散粗碎屑堆積層,因此必須對鐵路路基進行加固。
分享友人