building motion 中文意思是什麼

building motion 解釋
建築物運動
  • building : n. 1. 建築物,房屋,大樓,大廈。2. 製造;營造,建築;組合,組裝;建築術。
  • motion : n 1 運動 動 移動(opp rest)。2 (天體的)運行;(車、船等的)動搖;(機器的)開動 運轉;【機械工...
  1. An elderly female, no more young, left the building of the courts of chancery, king s bench, exchequer and common pleas, having heard in the lord chancellor s court the case in lunacy of potterton, in the admiralty division the summons, exparte motion, of the owners of the lady cairns versus the owners of the barque mona, in the court of appeal reservation of judgment in the case of harvey versus the ocean accident and guarantee corporation

    一位上了歲數不再年輕的婦女正從大法院高等法院稅務法庭和高級民事法院共用的大廈里踱了出來。她剛在大法官主持的法庭里旁聽了波特頓神經錯亂案;在海事法庭上聆聽了「凱恩斯夫人號」船主們對「莫納號」三桅帆船船主們一案的申訴以及當事者一方的辯解;在上訴法庭,傾聽了法庭所做關于暫緩審判哈維與海洋事故保險公司一案的決定。
  2. This motion could be likened to jiggling the stacked building blocks slightly.

    這種運動可以比作是一堆積木的輕微晃動。
  3. With the building blocks moving into position, and our action plan set in motion, we are reasonably optimistic that council will have much to offer to improve legal aid services

    一切已漸入佳境,本局亦已準備就緒,執行本局的行動計劃,我們樂意相信本局定能為改善法律援助服務作出貢獻。
  4. In the part of 3d modeling, some theories and technologies was discussed. then, how to build 3d terrain was analysis. this dissertation presented two new methods of terrain building : lofting based on contour and random terrain building based on fractional brown motion

    三維地形是虛擬環境的基本要素,本文總結了各種地形建模方法,提出了兩種地形建模方法:根據等高線地圖生成地形的「沿截面法線放樣法」和生成隨機地形的分形曲面法。
  5. The probability of being or exceeding a given damage state of buildings by a given ground motion intensity is calculated from the spectral displacement corresponding to the intersecting point of the demand spectrum and the capacity curve, the median value of spectral displacement at which the building reaches the threshold of the damage state and the standard deviation of natural logarithm of spectral displacement of the damage state

    文中,討論了非彈性需求譜的推算,將現行抗震設計規范中規定的反應譜換算得到的彈性需求按對應的譜位移折減,得到非彈性需求譜。依對應的譜位移在四個需求譜上的四個點和原點,構造了典型建築物的抗力曲線。
  6. The thesis discussed the effects of the factors on the high - rise isolated building, such as the rigidity and - damping of isolation system, the structural rigidity, the earthquake ground motion duration and so on

    本文對影響高層隔震建築的諸多因素如隔震系統的剛度、阻尼、結構的剛度、地震動持時、雙向地震作用等進行了討論,為工程建設提供一些參考。
  7. But in fact their design response spectrum could be very different so that the parameters of ground motion for building design could be improper

    實際上,兩者可以相差很多,由此確定的設計地震動參數勢必不盡合理。
  8. The combined effect of the soil, structure and seismic wave was considered in the analysis and the time - dependant curves of earthquake - induced differential settlement of the building were obtained according to differential probability of seismic ground motion

    考慮了土層、建築物荷載分配、地震動波形等影響因素對不均勻震陷的協同作用效果,依據不同超越概率下的地震動給出了建築物不均勻震陷時程曲線。
  9. This dissertation has studied the structural model and model predictive control ( mpc ) algorithm that was first implemented for the structural vibration control of the tall building under earthquake excitation. based on analyzing structural motion equation and the state space form equation of the earthquake - excited structural model of the tall building, predictive model and control objective functions are defined and the mpc system of the tall building is set up

    本文主要研究高層建築結構振動控制的結構模型和預測控制演算法,首次將預測控制應用到高層建築結構地震反應控制中,在分析受地震波激勵的高層建築結構模型的運動方程及其狀態空間形式方程的基礎上,確定預測模型和控制目標函數,建立高層建築結構預測控制系統,從理論上對預測控制在高層建築結構振動控制中的應用進行研究。
  10. I was wedged in between redruth and stout old gentleman, and in spite of the swift motion and the cold night air, i must have dozed a great deal from the very first, and then slept like a log up hill and down dale through stage after stage ; for when i was awakened at last, it was by a punch in the ribs, and i opened my eyes to find that we were standing still before a large building in a city street, and that the day had already broken long time

    我被夾在雷卓斯和一個相當肥胖的老紳士中間,車走得很快,夜氣很涼,盡管如此,我無疑一上車就打起盹來,接著便熟睡得像塊木頭,上山頭又下溪谷,過了一站又一站最後直到肋下挨了一拳,我才醒來,睜開了眼睛,發現我們正靜靜地停在城市街道上一座大的建築物前,而天已大亮了。
  11. I ' ve hacked into the building ' s motion sensors

    我已經黑掉了大樓的運動傳感器
  12. This is structure from motion. while building map, the robot has to update its odometry data, then continue to create map. this process is called simultaneous localization and mapping ( slam ), and the localization during slam is local localization

    機器人在創建地圖的過程中,為了提高地圖的精度,需要時刻修正里程計數據,再利用新的位姿更新地圖,這個一邊創建地圖一邊修正自己位姿的過程稱為同時定位與地圖創建,即slam ,而slam過程中機器人修正位姿的過程稱為局部定位。
  13. The results show that this case teacher ' s teaching in this " force and motion " unit can be divided into three stages as tacit agreement building, inquiry activity and product creation during which periods the effective communication, context arrangement and creative product design are emphasized from the perspective of " problem diagnosis and perception "

    就問題診斷與覺察的觀點來看,默契建立階段在乎與學生建立溝通模式,探究活動階段則著重在情境的布置與設計,而作品創作階段則希望啟發學生的創意製作比賽成品。
  14. The former provisional legislative council passed a motion in november 1997 urging government to be responsible for the inspections and to establish a building maintenance fund to provide assistance to building owners having difficulty meeting the repair costs

    前臨時立法會在1997年11月通過動議,促請政府承擔驗樓責任,並成立大廈維修基金,協助無力負擔維修費用的業主。
  15. The conditions for it have been building, in slow motion, for years

    經過多年的緩慢積累,發動戰爭的各項條件已經具備。
  16. But many problem remain should be solved in these aspects, such as research on lateral resistant system, the cladding material and steel frame connections, etc. to the lateral resistant system, one of the imperative problems in the steel residential building, we expect to research a new earthquake resistance element with great stiffness in the usual day ( for the needing of safety and comfort in the place where is windy and earthquake occurred frequently ) ; low stiffness in strong motion earthquake ( for the flexibility of residential building in the strong motion earthquake ) and absorbing seismic energy

    從技術角度講,如何使鋼結構適應住宅建築的特點,滿足住宅產業化發展的需要,還有許多問題有待進一步研究,如抗側力體系、維護體系及其樑柱的節點問題等等。針對鋼結構住宅中急需解決的抗側力體系問題,本文研究了一種正常使用情況下剛度大(滿足建築物在風載及常遇地震下人們舒適性和安全感的要求) ,強震時剛度低(保證強震時建築具有柔性的特點) ,而且可吸收地震能量的新型抗震單元。
  17. The deformation analysis was made to a 12 storey reinforcement concrete structure, building in site condition ii, earthquake fortification level 8, by a program idarc - 2d which is put forward by the state university of new york at buffalo. the strong ground motion records obtained from pacific earthquake engineering research ( peer ) stiong ground motion database. thirty - eight waves were selected from the database by sorting the site condition and peak ground acceleration a comparison was made to the thirty - eight records " response spectra and the design response spectrum. thirteen waves were selected to the deformation analysis, el - centro wave and taft wave were added as a comparison. the result of computation shows that the selected waves damaged the structure severely than the el - centro wave and taft wave

    利用idarc - 2d對一建於8度類場地上的12層鋼筋混凝土框架結構進行了大震下的變形驗算。強震記錄取自加州國家地震中心強震數據庫,按場地類別和峰值加速度對數據進行分類處理,從中選出38條波進行反應譜的擬合。最終選定擬合較好的13條波進行本次試算,作為比較加入了常用的el - centro波和taft波。
  18. Motion moved by hon alan leong kah - kit was passed - " that the panel urges the government to defer its plan to demolish the existing star ferry pier and its clock tower in central and to incorporate, upon extensive public consultation, the existing clock tower together with the relevant building structures into the future new development plan for the central district, with a view to preserving, on a people - oriented basis, the historical traces that form part of the collective memory.

    梁家傑議員所動議的議案獲得通過- "本委員會促請政府暫緩清拆現有中環天星碼頭及鐘樓計劃,在進行廣泛公眾諮詢后,把現有鐘樓與相關建築融入將來中環新發展規劃藍圖,在以民為本的基礎上,保留具集體回憶的歷史痕跡。
  19. Firstly, a whole control model is given after analyzing the wheeled structure with nonholonomic constraints and the model of dc servo - motor building. secondly, we develop a motion control system using at90s8515 microcontroller

    首先,通過對非完整輪式移動結構和直流伺服電機模型的分析,建立了移動機器人的控制系統模型。
  20. Speech by spl at the legco motion debate on review of building ordinance chinese version only

    檢討建築物條例的動議辯論2000年1月26日立法會
分享友人