building regulation 中文意思是什麼

building regulation 解釋
房建規則
  • building : n. 1. 建築物,房屋,大樓,大廈。2. 製造;營造,建築;組合,組裝;建築術。
  • regulation : n 1 規則,規程,規章,條例。2 控制,管理,限制,(情慾等的)節制。3 調整,調節,整頓。4 校準;穩...
  1. The thesis has summarized the development of the oblique - pull bridge, its construction technology and the importance of bridge construction control, then has introduced project general situation, and has narrated detailed regulation, organization construction, the major work and difficult part of this bridge construction control. the following is the key part of this thesis, firstly, it has introduced the experiment work of early stage, structural calculation and its theoretical result : the absolute altitude of each operating mode, the absolute altitude of building mould in each section and the absolute altitude after pouring concrete ; then, it has discussed the method and content of the line shape control of the main beam, actual absolute altitude of building mould is put forward, and it has described the method of structural stress monitoring, how to arrange measure point and collect data, and how to analyze data. it has also narrated the method of rope force detection and structural temperature inspection

    本論文在總結了斜拉橋的發展及其施工工藝,並指出了橋梁施工控制的重要性之後,簡要的介紹了工程概況,敘述了炳草崗金沙江大橋監控細則、組織機構及監控的主要工作和難點部分;論文的核心部分,在介紹了炳草崗金沙江大橋施工控制與監測工作的前期實驗工作和施工各工況標高、各節段支模標高、澆注混凝土后的標高的結構計算和其理論計算結果之後,詳細論述了主梁的標高線形控制方法和內容,實際支模標高的提出,結構應力監控的方法、布點、測讀及其對測讀數據的合理分析方法,索力檢測和結構溫度監測的方法。
  2. Air regulation systems in mining - air locks - building and operation

    空氣調節系統.空氣閥門.結構和操作
  3. Based on the analysis, it is concluded that the congruous contract between the managers and the manipulative stockholders, shielding of the cpas, the banks and the local government, the passive supervision of the government and the defective corporate governing framework set off accounting fraud of listed companies. at last, it introduces six countermeasures which concern law, regulation, institution building and political institution reform

    本文得出結論:大股東與經營者的和謀、注冊會計師(會計師事務所) 、銀行和地方政府對上市公司舞弊者舞弊行為的包庇、政府監管部門的消極監管和上市公司治理結構的缺陷是引發上市公司會計舞弊問題的根本原因,並據此從法律、法規、制度建設、政治體制改革等六個方面提出了治理上市公司會計舞弊的相關建議。
  4. Assure law " regulation : divide the following outside two kinds of circumstances, farmland, curtilage base, plot of land for personal needs, leave the collective such as hill oneself all land access must not mortgage : ( 1 ) the land access of the moorland such as grave of the barren mountain that guaranty person contracts lawfully and mortgages via sending a bag to just agree, barren, desolate sands ; ( 2 ) with countryside ( town ), the building such as the workshop of village enterprise mortgages, its take up the land access inside limits mortgages at the same time

    擔保法》規定:除以下兩種情況外,耕地、宅基地、自留地、自留山等集體所有的土地使用權不得抵押: ( 1 )抵押人依法承包並經發包方同意抵押的荒山、荒丘、荒灘等荒地的土地使用權; ( 2 )以鄉(鎮) 、村企業的廠房等建築物抵押的,其佔用范圍內的土地使用權同時抵押。
  5. Build a house according to building a department on october 31, 1995 [ 1995 ] 624 " about dismantling change town demesne the reply that whether can building land access compensate a problem " regulation, the city that tear open change demesne building land access is not to grant compensatory

    根據1995年10月31日建設部建房1995 624號《關于拆遷城市私有房屋土地使用權是否可以補償問題的復函》的規定,拆遷城市私有房屋土地使用權是不予補償的。
  6. 10. building standards of sanitary fitments, plumbing, drainage works and latrines amendment regulation 1997

    10 . 1997年建築物生設備標準水管裝置排水工程及廁所修訂規例
  7. Construction ministry " housing project quality guarantees method " made lowest guarantee to housing project the regulation of deadline : among them 1, foundation foundation project and project of main body construction, to design the reasonable use fixed number of year of this project that the file sets ; 2, the waterproof project, toilet that has waterproof demand, room mixes the building outside of metope prevent leakage, for 5 years ; 3, heat addition and supply cold system, for 2 heating period, offer cold period ; 4, electric cop, to catchment conduit, equipment installation is 2 years ; 5, decorate a project to be 2 years

    建設部《房屋建築工程質量保修辦法》對房屋建築工程作了最低保修期限的規定:其中1 、地基基礎工程和主體結構工程,為設計文件規定的該工程的合理使用年限; 2 、房屋防水工程、有防水要求的衛生間、房間和外墻面的防滲漏,為5年; 3 、供熱與供冷系統,為2個採暖期、供冷期; 4 、電氣管線、給排水管道、設備安裝為2年; 5 、裝修工程為2年。
  8. What you contract land belongs to collective all land, " matter right law " following regulation is helpful to you : the 42nd need for public interest, the limits of authority that according to law provides and program can collect collective the building etc of all land and unit, individual is praedial

    你所承包的的土地屬于集體所有的土地, 《物權法》的下列規定對你有幫助:第四十二條為了公共利益的需要,依照法律規定的權限和程序可以徵收集體所有的土地和單位、個人的房屋及其他不動產。
  9. Service fund, it is to show property manages company foundation the ministry of finance " financial management of property management company sets " ( money radical word ( 1998 ) 7 ) regulation, accept owner management committee or person of property property right, use person entrusts the building that govern on somebody ' s behalf common place maintenance fund and fund of maintenance of public facilities facilities

    維修基金,是指物業治理企業根據財政部《物業治理企業財務治理規定》 (財基字( 1998 ) 7號)的規定,接受業主治理委員會或物業產權人、使用人委託代管的房屋共用部位維修基金和公用設施設備維修基金。
  10. Basis " beijing already bought public housing to appear on the market offer executive way " regulation, change cost price to buy the town dweller of public housing according to the room, can according to in those days the room changes cost price 1 % fill after making gold of land sell one ' s own things or land profit, to the building room of land of place area, county is in charge of bureau application to handle property of commodity room house card

    根據《北京市已購公有住房上市出售實施辦法》的規定,按照房改成本價購買公有住房的城鎮居民,可以按照當年房改成本價的1 %補交土地出讓金或土地收益后,向房屋所在區、縣國土房管局申請辦理商品房房屋所有權證。
  11. Based upon the present regulation, the design and construction check and structure strength check, the electric power generation water inlet anchor gate crane platform ' s hydro - engineering structure of fushui power plant were conducted and an analysis for the reasons of building structure fracture was carried out

    摘要進行了富水電廠發電進水口閘門啟閉機平臺安全檢測,依據現行規?對其建築物進行了設計與施工復核、結構的強度復核和建築物的裂縫成因分析。
  12. So, to accelerate the regulation to abandoned land and replenish the arable area is implementing the scientific concept of development ; to adhere to the strictest arable land protection system and implement sustainable use of land which is an important measure, is of great significance to the restoration and improvement of the ecological environment, development of a recycling economy, building a conservation - minded society and the promotion of comprehensive, coordinated and sustainable development of economy and society

    加快推進礦山廢棄地整治,補充耕地面積,是貫徹落實科學發展觀,堅持最嚴格的耕地保護制度,實施土地可持續利用的重要舉措,對恢復和改善生態環境、發展循環經濟、建設節約型社會、促進經濟社會全面協調可持續發展具有十分重要的意義。
  13. To introduce a regulation under the bmo to require ocs to procure third party risks insurance in relation to the common parts of the building

    制訂附例,規定業主立案法團必須就樓宇公用部分購買第三者保險。
  14. The resident that leases mutual building is to be torn open the use person of change building, enjoy following right : ( 1 ) have the right that signs the contract that tear open change lawfully ; ( 2 ) have the right that receives finding a place for lawfully ; ( 3 ) because tear open change, have and remove, the requirement tears open change person to pay move the right of accessorial cost ; ( 4 ) have the transition in the regulation period inside, have the right that asks the person that tear open change pays to find a place for allowance is expended temporarily

    租住共有房屋的住戶是被拆遷房屋的使用人,享有下列權利: ( 1 )有依法簽訂拆遷合同的權利; ( 2 )有依法得到安置的權利; ( 3 )有因拆遷而搬遷的,有要求拆遷人支付搬家補助費的權利; ( 4 )有在規定的過渡期內,有要求拆遷人支付臨時安置補助費的權利。
  15. The obligation of person of the change that be torn open : ( 1 ) after tearing open change compensation to find a place for the agreement is signed, should refer estate of building of the change that be torn open to the person that tear open change according to consultative agreement authority certificate and cancel estate right a power of attorney ; do not have estate right certificate ought to refer corresponding property right to prove file and the declaration that abandon estate right ; ( 2 ) after tearing open change person to give compensation to find a place for, finish inside the deadline of the regulation that tear open change remove ; ( 3 ) the agreement that fulfils the agreement that tear open change, be in transfer after expiring, vacate room of have enough to meet need remove the person that tear open change ; ( 4 ) fulfill director office and relevant people government already the legal copy clerk of become effective ; ( 5 ) book of the judgment that fulfills people court to had produced legal effectiveness, mediation and ruling book, the arbitral adjudication book that arbitral perhaps orgnaization makes and arbitration mediate a book ; ( 6 ) other and legal or the agreement is voluntary

    被拆遷人的義務: ( 1 )在拆遷補償安置協議簽訂后,應按照協議的約定向拆遷人提交被拆遷房屋房地產權證書及注銷房地產權利委託書;沒有房地產權利證書的則應當提交相應的產權證實文件及放棄房地產權利的聲明書; ( 2 )在拆遷人給予補償安置后,在規定的拆遷期限內完成搬遷; ( 3 )履行拆遷協議的約定,並在過渡期滿之後將周轉房騰退給拆遷人; ( 4 )履行主管機關及相關人民政府已經生效的法律文書; ( 5 )履行人民法院已經發生法律效力的判決書、調解書和裁定書,或者仲裁機構作出的仲裁裁決書和仲裁調解書; ( 6 )其他法定或約定義務。
  16. Based on the analyses of pollution characteristics of rural rivers, this paper discussed a series of countermeasures to control the pollution effectively, such as preplanning, attaching importance to these issues, bringing crowd into play, comprehensive regulation, recycling utilization, distinguishing the properties and treating accordingly, building up a efficient system for a lasting management and so on

    在對農村河流污染特點進行分析的基礎上,對如何有效控制農村河流污染的措施進行了一定的探討,提出規劃在前、政府重視、發動群眾、綜合整治、循環利用、結合特點、區別對待、建立制度、長效管理的農村河流保護措施。
  17. When building a building, what regulation do floor height and building span have ? how is 1 - 2 layer always blocked now sunshine ? violate compasses construction

    蓋樓時,樓層高度與樓間距有什麼規定?怎麼現在1 - 2層總被擋陽光?是不是違規建設
  18. Planning was essential for the provision of housing in the shenzhen sez in three major aspects. ( 1 ) land use zoning under certain planning concept and in terms of various levels of physical plans governed directly the amount of land to be designed for residential use. ( 2 ) development targets within a specified time frame such as population growth and economic development in different areas determined the amount of housing provision. ( 3 ) various planning standards and regulation controlled the amount of gross floor area of residential building

    計劃在三個方面對在深圳經濟特區提供住房是最基本的. ( 1 )一定計劃概念下根據不同層次物質計劃的土地使用分區制直接支配設計為居住用途土地的量. ( 2 )開發對象在某一規定的時間框架以內如不同區域的人口增長和經濟發展決定住房提供的量. ( 3 )不同的計劃標準和規定控制居住建築的毛樓層面積的量
  19. The standard system of the university performance audit must be established on economy, efficiency and effectiveness and constituted by the standard of economy and efficiency, the standard of effectiveness and the good system standard, in which the standard of economy and efficiency is reflected through funding structure, fund balance ratio, the resource use efficiency indicator and the fund use structure indicator ; the standard of effectiveness is reflected through educational standard, research capabilities, student training quality and social well - known and recognized degree ; the good system standard is reflected through school running thoughts, school target positioning, school regulation building, school

    高校績效審計標準體系必須圍繞經濟性、效率性和效果性來建立,由經濟性效率性標準、效果性標準、良好制度標準三部分組成。其中經濟性、效率性標準通過經費來源結構、經費結余比率、資源利用效率指標、經費使用結構指標四方面來反映;效果性標準通過辦學水平、科研能力、學生培養質量、社會知名和認可程度等指標來反映;良好制度標準通過學校辦學思路、學校目標定位、學校規章制度建設、學校教學質量監控及測評系統等方面來體現。
  20. Our focus will be on the protection of health by reduction of air, noise and water pollution, and on improvement to living quality by better urban planning, building regulation and conservation of natural resources

    我們的工作重點,是要透過減少空氣噪音和水污染,來保障市民的健康同時亦透過更完善的城市規劃和建築物規例,以及保護天然資源,來改善我們生活質素。
分享友人