capping 中文意思是什麼

capping 解釋
n. 名詞 〈美國〉(拍賣時)使用假買手誘騙哄抬。

  1. Glass infusion bottle capping machine

    玻璃輸液瓶軋蓋機
  2. Magnetic moment capping system, adjust, adgree of tightness freely

    磁力矩旋蓋頭,松,緊,任意調節。
  3. Beverage hot - filling and screw capping machine

    飲料熱灌裝擰蓋機
  4. Screw capping machine

    螺旋裝蓋機
  5. The series of products is mainly include the caterpillar, wind and magnetic cap - conveying machines, respectively applied for the plastic security caps, aluminum security capl, skull caps. this machine mainly conveys the caps from a lower place into the hopper of the cap - screwing machine at a higher position, an anxiliary equipment for the capping machine

    本系列產品主要有覆帶式、風力式、磁力式輸蓋機,分別用於塑料防盜蓋,鋁質防盜蓋,皇冠蓋,該機主要用於將瓶蓋從低處輸送到較高位置的旋蓋機料斗內,是封蓋機的一種輔助設備。
  6. Capping each backfilled pit with uncontaminated mud effectively isolating the contaminated mud from the surrounding marine environment

    利用未受污染淤泥覆蓋每個已回填的泥坑,以有效地分隔污泥和附近的海洋環境。
  7. Specification for white metal ingots for capping steel wire ropes

    澆制鋼絲繩端頭用白色合金錠規范
  8. Analysis for the internal force of pile capping beam considering continuity of soil mass

    考慮土體連續性的樁基承臺梁內力分析
  9. Due to the complexity of the behavior of pile capping beam widely used in the construction, the inverted continuous beam method is usually adopted in design methods to simplify the computation

    條形樁基承臺梁在我國現代建築工程中應用極為普遍,其設計計算大多採用倒置的連續梁模式進行簡化計算。
  10. Based on the detailed investigation, the distribution of cracks in capping beam of the abutment of huaihe river bridge on the national road 107 is presented, the causes leading to the cracks are thoroughly analyzed, and the construction scheme and methods for remedy of the cracks in the abutment are described as well

    摘要在詳細調查的基礎上,介紹了107國道槐河大橋橋臺蓋梁裂縫的分佈情況,深入分析了裂縫形成原因,並闡述了該橋的加固方案和施工方法。
  11. Consequently, on the basis of non - winkler foundation model, a finite - element method that utilizes foundation flexibility matrix into iterative calculation is proposed in this paper originated from the item " the optimal design theory and research of pile capping beam " sponsored by natural science fund of hunan province, which the continuity of soil mass can be accounted for under various boundary conditions, different loadings and irregular beam characters

    本文結合湖南省自然科學基金項目「樁基承臺梁優化設計理論與方法研究」 ,針對非文克爾地基(半空間、線性變形層或單向壓縮層地基模型等)上的樁基承臺梁,提出一種利用地基柔度矩陣來進行迭代的有限單元法,可充分考慮梁下土體的連續性,並對基礎與土體脫開、承臺梁截面變化、梁體邊界條件復雜、上部荷載類型變化以及梁下基樁承載力差異等情況進行分析計算。
  12. The behavior of capping beam that joints single rank of piles, which nowadays is widely applied to the construction in china, is complexly influenced by many factors. while conversed continuum beam pattern is primarily adopted in existent design methods to predigest computations, it still lacks of satisfaction as a result that it could n ' t reflect on the variance of piles and the infection of soil

    條形樁基連續承臺梁在我國現代建築工程中應用極為廣泛,其受力影響因素極為復雜,現行設計大多採用倒置的連續梁模式進行簡化計算,其無法考慮基樁的差異性以及地基土體對承臺梁的影響,計算結果難以令人滿意。
  13. In addition, the computer method is proposed to get the stochastic pile capacity and the random optimum analysis is done in virtue of the genetic algorithm which can easily think over the influence of the randomness of pile capacity on the internal force of capping beam based on the thorough analysis about the primary factors influencing the randomness of pile capacity. an optimization program is worked out for the analysis which can consider the pile - soil - cap interaction and the non - linear character of the foundation soil

    此外,本文對影響基樁承載力差異性的主要因素進行了深入分析,提出了基樁承載力隨機生成的計算機方法,並採用遺傳演算法對承臺梁內力進行隨機優化分析,可方便地考慮基樁承載力隨機性對承臺梁內力的影響,並開發出能考慮樁?土?承臺共同工作及地基土非線性特性的樁基承臺梁內力優化分析程序。
  14. But this method could n ' t reflect the influence of the variance of pile capacity on capping beam internal force and the partaking of soil to the load. combined with the item " the optimal design theory and research of pile capping beam " financed by natural science fund of hunan province, a new method which can consider the pile - soil interaction and tide over the disfigurement of the winkler soil model is used to adjust the foundation base reactions in this paper. by this method, the proper solution about the internal force of capping beam can be achieved and the relative stiffness and the relative position of soil spring are thought out well

    本文結合湖南省自然科學基金項目「樁基承臺梁優化設計理論與方法研究」 ,考慮梁下土體和基樁對承臺梁的共同作用,提出了能對梁下地基反力進行自動調整的一種新型方法,其克服了文克爾地基模型所存在的缺陷,該法在調整過程中,充分考慮了梁下各土體彈簧之間的相對剛度,相對位置,更接近承臺梁的實際工作情況,有利於獲得承臺梁內力的正確解答。
  15. Hi addition, with regard to the computation of the maximum / minimum moment, shear force, settlement and foundation reaction of pile capping beam, the randomness of both pile capacity and foundation modulus are statistically analyzed in virtue of the method ? monte carlo. accordingly, the random probability analysis of the internal force of pile capping beam can be achieved

    並通過蒙特卡洛( montecarlo )法對基樁承載力、土體基床系數的隨機性進行統計分析,獲得了承臺梁彎矩、剪力、沉降以及基底反力的最大(小)值,從而實現了樁基承臺梁內力計算的隨機概率分析。
  16. This paper studys basement fold, capping fold, arc structure and magma activity in xingguo area, preseats the concept. of spinning - decollement structure in the area, and makes inquisiton of its mechaninsm of formation

    摘要通過興國地區基底褶皺、蓋層褶皺、弧形構造及巖漿活動的研究,闡述了該區旋滑構造的特徵,並對其形成機制進行了探討。
  17. 2s ( th / u4u and 227th / 2x " th dating on two mammal fossil teeth gave age ranging from 85 to 139 ka, which evidence the stratigraphic order between the capping flowstone and the underlying fossil - bearing deposits and support to the age assignment of older than ca. aoo ka to die hominid fossil teeth

    伴生的貘牙化石和鹿牙化石的二種鈾系法年代范圍為85 - 139ka ,表明該地點含化石堆積與表層鈣板間無地層倒序現象,支持人牙化石大於100ka的結論。
  18. Actin capping and severing proteins

    肌動蛋白的加帽和支解蛋白質
  19. With an area of 5300 km2, dongpu depression is located in the southwest of lin - qing depression, bohaiwan basin, bounded with lu - xi uplift by lan - liao fault in the east, with nei - huang uplift by chang - yuan fault in the west, with lan - kao heave by the north feng - qiu fault in the south, with xin country depression by ma - ling fault in the north, while spreading along nne defection, taking on the forms of being wide in the south, and narrow in the north. it is a rift fault depression basin with the characteristics of striking, with the basement being the paleozoic and mesozoic, and the capping beds being the cenozoic

    東濮凹陷位於渤海灣盆地臨清坳陷西南端,東側以蘭聊斷裂為界與魯西隆起為鄰,西側以長垣斷裂為界與內黃隆起相接,南以封丘北斷層為界與與蘭考凸起相鄰,北以馬陵斷層為界與與莘縣凹陷相望,是以古?中生界為基底,以新生界為蓋層,古近紀形成的拉分走滑?裂谷型箕狀斷陷盆地。
  20. Three group capping consist of first rotating and re - rotating the degree of moment may be adjusted singlely. ensure that will be tight. the machine has clutch to avoid the cap over - rotating

    旋蓋分初旋、復旋工三組,扭矩大小均可單獨調節,保證旋緊,並帶有離合裝置而不回過緊,損傷蓋子。
分享友人