closure condition 中文意思是什麼

closure condition 解釋
閉合條件
  • closure : n 1 關閉,停業;截止;末尾,結束;〈英議會〉終止辯論(=〈美國〉 cloture)。2 閉塞物;【建築】隔...
  • condition : n 1 狀態,狀況,情形;品質。2 〈pl 〉外界狀況,周圍情形。3 地位,身分。4 條件;【語法】條件子句。...
  1. A one - dimensional oceanic mixed layer model with the m - y level - 2. 5 turbulence closure schemes is employed. the rate of energy loss by breaking waves is estimated by parameterization and incorporated into the model as a source of turbulence kinetic energy ( tke ) by modifying the existing surface boundary condition of tke equation. the velocity field and turbulence energy budget are calculated under different forcing conditions ( the results given below are for a wind speed of 20 m / s. )

    採用一維2 . 5階湍封閉混合層模式,根據參數化方法對波浪破碎導致的能量耗散率進行了估計,通過改變湍動能方程的上邊界條件引入波浪破碎對湍動能生成的影響,計算了不同風應力強迫下的混合層流場結構和湍能量收支(下述給出的結果是取風速為20m s得到的) 。
  2. Seawall and sluice are the parts constructed in advance, while final closure is the last part in construction. the hydraulic condition during the final closure process is worse than that during any other processes. and with the compressing of the entrance, the hydraulic condition becomes badly, the drop height of entrance can reach 2 to 3 meter, the maximum velocity of flow even reaches 6 to 8 meter per second and flow condition also becomes complex

    海堤和水閘的修建都是圍海工程先期施工的部分,堵口則是海堤修築的最後階段,堵口合龍成敗關繫到圍海工程成敗,由於此階段所遇到的水力條件十分惡劣,口門落差可達2 3m ,流速最大可達到6 8m / s ,且水流極其復雜,根據我國《圍海工程技術規范》規定圍海堵口必須進行龍口水力計算。
  3. At first, the relations between vegetation structures and their controlling soil erosion are discussed. the results show that magnitude of plant community coverage or canopy closure is n ' t certainly the adequate condition of an anti - erosive effective community because the community function of soil and water conservation is related to height of coverage layer as well as community coverage or canopy closure

    首先,討論了植被結構與其防止土壤侵蝕作用的關系,結果表明,植被蓋度或郁閉度的大小並不一定就是防蝕有效植被的充分條件,植被保持水土功能還與覆蓋層的高度密切相關,覆蓋層高度大並不有利於植被保持水土。
  4. The reform of the service of the logistics in colleges is vital to ensuring the smooth process of the educational reform. the direction of the reform is to realize the socialization of the logistics, namely, to afford the logistics service to the school, to improve the condition of running the school and the condition of life, relying on social power and translate social resources. simultaneously, the present logistics department of colleges should be transformed from closure to opening and become the economic entity of industrialization and socialization which can independently manage itself, assume sole responsibility for its profits or losses, self - develop and self restrict so as to form the system of guarantee and service with the omnidirectional sustain, enterprise managing and market operating

    高校後勤服務工作的改革,對于保證教育改革的順利進行極為重要,改革的方向是實現後勤社會化,就是要依託社會力量和調動社會資源,為學校提供後勤服務,改善辦學條件和生活條件,同時使現有校內後勤部門由封閉走向開放,轉化為自主經營、自負盈虧、自我發展、自我約束的產業化、社會化的經濟實體,從而形成全方位支持、企業化管理、市場化運作的後勤保障系統和服務體系。
  5. Standard classification of environmental condition of property area types for defense base closure and realignment facilities

    防禦掩體和改線設施軍用財產區域環境條件的標準分類
  6. During the construction of concrete cut - off wall of the auxiliary dam in huangbizhuang reservoir, in the section with complex geographical condition, especially the closure section of concrete cut - off wall ( about 120m ), the deterioration of the underground water ' s flow state and the existence of the overseep channel in the stratum result in the several collapses in the dam crest. through the analysis of ever } 1 collapse ' s reason, the proposal of handling measure and its effect, the paper expounds and proves that the cut - off wall can be safely constructed and devoted into normal usage after dealing with collapse. the psper improves the construction technique and method of concrete cut - off wall especially under complex geological condition and in the overseep stratum

    本文通過對歷次塌坑的原因分析及歷次塌坑處理措施的提出和對歷次塌坑處理效果的分析,論證了塌坑處理後防滲墻能安全施工和投入正常運用;完善了在復雜地質條件及強滲漏地層混凝土防滲墻的施工工藝和施工方法;提出了對病險水庫加固及在地質條件復雜地層中修建混凝土防滲墻的施工要點;同時提出了在強滲漏地層修建防滲墻的關鍵是在防滲墻施工前通過預注漿封閉強滲漏通道的重要論點;對塌坑一些處理措施中的不足之處亦進行了分析研究,供國內類似工程借鑒。
  7. Model of single condition closure adjustment

    單條件閉合差調整通用模型
  8. Moreover, if f has only one basic set, then this basic set is the whole space. in the end, we give a sufficient condition for f having the potp in the closure of periodic points set

    當這個自同胚既有偽軌跟蹤性,又是等度連續的時,它在周期點集的閉包上保持偽軌跟蹤性。
  9. Rock - fill dam is the one chief type of soil - rock dam, there are much virtue of safety function, adaptability used the local material, be benefit to mechanical building, be short in building time and low in cost, being simple in the building during closure and diversion, etc. it suit the condition of our nation and the environment where the water conservancy works and hydroelectric power plant located, we accumulate the ample practical experience and a series of achievement in scientific research and become a model of having ample competition in the construction and development of piled rock clam

    堆石壩是土石壩的主要壩型之一,它具有適應性強,就地取材,便於機械化施工,工期短,造價較低等優點,在水利樞紐設計中被廣泛應用,而且已經積累了豐富的實踐經驗和成套的科研試驗成果,在水利樞紐的壩型選擇中具有很強的競爭力。就堆石壩而言,根據築壩方式和築壩材料的不同,也有多種壩型。
分享友人