compaction control method 中文意思是什麼

compaction control method 解釋
壓實度控製法
  • compaction : n. 緊密;緻密;壓縮。
  • control : n 1 支配,管理,管制,統制,控制;監督。2 抑制(力);壓制,節制,拘束;【農業】防治。3 檢查;核...
  • method : n 1 方法,方式;順序。2 (思想、言談上的)條理,規律,秩序。3 【生物學】分類法。4 〈M 〉【戲劇】...
  1. The paper introduces the construction technique and quality control of the concrete ground container, the project uses the small machine - constructing method which vibrates beam and the vibrating spear unify, through example of key working procedure : the construction survey, the ground basic roller compaction, two ash zone constructions, the steel bar construction, the template construction, the concrete surface layer construction craft and the quality control, the small machine construction method prove to meet the project needs

    摘要介紹了混凝土集裝箱堆場施工工藝與質量控制,工程採用振動梁和振動棒相結合的小型機械法施工,通過對關鍵工序如:施工測量、場區基層碾壓、二灰層施工、鋼筋施工、模板施工、混凝土面層的施工工藝與質量控制,表明小型機械法施工能滿足工程需要,工程完成後符合驗收標準,滿足了業主的使用要求,對于同類工程的施工具有借鑒意義。
  2. Conclusions as following have got through test study : ( 1 ) when impact compaction technology is applied to treat collapsible loess subgrade, the effect depth may be treated generally can not override 80 cm and impact compaction pass is optimum at 30 times. ( 2 ) for stratified impact compaction of subgrade, when compactness of each level reaches codeslstandards loose laying depth of 80 cm fits 40 impact compaction pass is the optimum combination of subgrade construction. when average compactness in each level reaches codeslstandards loose laying depth of 80 cm fits 30 impact compaction pass is the optimum combination o ( 3 ) the quality control method may request impact compaction pass as the main control index and at the same time the final division settlement is less than 10 % of total settlement as large area subgrade is constructed

    通過試驗研究主要得出如下認識:沖擊壓實技術處理濕陷性黃土地基時,其有效處理深度一般不超過80cm ,沖壓遍數以30遍左右為宜;對路基分層沖壓,在要求土體中各點壓實度均達到規范要求時,路基沖壓最佳組合為虛鋪厚度80cm 、沖壓40遍;在只要求土體平均壓實度達到規范要求時,路基沖壓最佳組合為虛鋪厚度80cm 、沖壓30遍;大面積施工時,質量控制方法可按照在以沖壓遍數作為主要控制指標的同時,要求最後10遍分計沉降量小於累計沉降量10 ;在施工單位自己購置沖擊壓實機情況下,與傳統施工相比較,沖擊壓實技術是一種既能節約資金又能大量縮短工期的施工方法。
  3. In this paper, first discussed are the corresponding results in highway and dam constructions and the engineering characters of rock - fills are deeply analyzed, especially the relationships between gradation, strength and maximum dry density, long - term stability of fillers including earth - fillers and rock - fillers and some conclusions of use are drawn. by in - situ tests and researches on compacting mechanism of high - filled rock embankments, effecting factors on compaction, construction technology and shock compacting technology, obtained in this paper are the compacting technology of high - filled rock embankment and the optimal parameters of rolling compaction. by deeply research on the theory and methods of quality control of high - filled embankment, settled are the questions as quality detection method and control standard of high - filled rock embankment

    本文首先總結和分析了國內外公路和壩工行業已有的相關成果,深入探討了填石料的工程性質與最大幹密度、長期穩定性等之間的關系,得到了一些有益的結論;通過現場試驗路堤的試驗和對高填石路堤壓實機理、填石路堤壓實效果影響因素、施工工藝和沖擊壓實技術等研究,解決高填石路堤壓實工藝和最優碾壓參數控制等技術問題;通過深入研究填石路堤壓實質量控制原理和方法,解決高填石路堤壓實質量檢測方法和控制標準技術難題;解決高填石路堤沉降觀測技術問題,並根據沉降觀測結果研究高填石路堤地基和路堤沉降變化規律,得到了能預測沉降變化規律的「龔帕斯」成長曲線預測模型;根據工程實際,深入研究了邊坡穩定性的影響因素,得到了有益的結論。
  4. Abstract : the paper unifies xing near the highway construction practice, from aspects and so on material preparation, mixing at site, roller compaction, keeping in good health elaborated two dust subbase construction craft, proposed the quality control examination method, and proposes the countermeasure to the common plant disease

    摘要:論文結合邢臨高速公路的施工實踐,從材料的準備、現場拌和、碾壓、養生等方面闡述了二灰土底基層的施工工藝,提出了質量控制檢測的方法,並對常見的病害提出對策。
  5. Simultaneously, the quality control method for the compaction, the construction technologies and measures and the roller - compacted parameters are studied and optimized, in this way the investment is saved at last

    同時,制訂了壓實質量控制方法,研究和改進了填築的施工工藝和措施,優化了大壩體型及施工碾壓參數,節約了投資。