composite power plant 中文意思是什麼

composite power plant 解釋
混合式動力裝置
  • composite : adj 1 併合的,復合的,混成的,合成的,集成的。2 【建築】混合式的;【造船】鐵骨木殼的。3 【植物;...
  • power : n 1 力,力量;能力;體力,精力;(生理)機能;〈常 pl 〉才能。2 勢力,權力,權限;威力;政權;權...
  • plant : n 1 植物,草木 (opp animal); 草本;〈商用語〉樹秧,苗木。2 莊稼,作物,收獲;(植物的)生育。3 ...
  1. This original presents the universal insulation materials and the general testing and evaluating method for pipelines " insulation of the thermodynamics power generating plant ; performs the insulation testing and evaluating of the high temperature steam pipelines of longfeng heat and power plant ; takes composite structural research on the high temperature steam pipelines, and establishes the relevant optimizing physical and mathematical model of the insulation layer, confirms the constraint and boundary condition, carries on optimizing design for the thickness of insulating layer ; in order to more systematically analyzing the present situation of insulation of the installation and pipelines of longfeng heat and power plant, develops a suit of software namely " the information associated decisive system for the insulation project ", taking advantage of this software can achieve. the design, evaluation and direction to building for the insulation project, examine the criterion of design and building, the perform ance and manufacture data of different insulation material, which is convenient to the selection of insulation material

    在進行保溫結構優化的過程中,主要是針對高溫蒸汽管道進行復合結構研究,並建立相應的物理及數學模型,找出其約束條件和邊界條件。同時為了更加系統地對龍鳳熱電廠設備及管道的保溫現狀進行分析,開發了一套「絕熱工程信息決策系統」軟體,利用該軟體可以實現絕熱工程的設計、評估及施工指導,並可以查閱設計及施工標準、各種絕熱材料性能和生產廠家的資料,便於絕熱材料的選擇。該套軟體的設計填補了國內空白,避免了絕熱工程改造、設計及施工過程中的無序現象,規范了絕熟工程市場,從而為我國絕熱工程的選材、設計、施工及管理提供科學依據。
  2. The influence of both synchronous generator and the distance from local power plant to load bus on load modeling are analyzed. when the influences are not negligible, the composite induction motor load model can not effectively describe the actual load. besides, the identifiability in this case is analyzed

    分析了同步發電機在綜合負荷中所佔的比例、地方發電廠離負荷母線的距離對負荷建模的影響,指出當同步發電機影響必須計及時,通常的感應電動機綜合負荷模型就不能正確描述區域負荷,並對由此引起的可辨識性及建模問題作了分析。
分享友人