cushion power 中文意思是什麼

cushion power 解釋
氣墊功率
  • cushion : n 1 軟墊,椅墊,靠墊。2 【機械工程】緩沖墊層,汽墊,膠墊,緩沖器;【植物;植物學】葉枕。3 (撞球...
  • power : n 1 力,力量;能力;體力,精力;(生理)機能;〈常 pl 〉才能。2 勢力,權力,權限;威力;政權;權...
  1. First, it is compressible and cushiony ; second, it can be transported to a long distance with a little power loss ; the last, its flux and velocity of flow are quite high, so the reaction time of the operators can been considerably shortened. aiming to solve the problems of vibrating machinery such as short life - span, poor cushion and high energy consumption, the writer, on the basis of characteristic of pneumatic mentioned, contrives a set of valve controlled pneumatic vibrator, which has larger output vibrating force and longer life - span with simple structure. then, it is applied to drive a vibrating screen and the result is fairly well

    文中針對氣動技術本身的特性及優點,如:可壓縮,具有緩沖性;能耗損失小,便於遠距離輸送;流量大、流速高,執行元件響應速度快等,以解決振動機械在應用過程中的緩沖、能耗以及使用壽命等問題為目的,設計出一套輸出激振力大、結構簡單、使用可靠的閥控氣動激振器,並將其成功地運用到振動篩上,取得了較好的效果。
  2. According to the results of the satiable modle test and trdimensional seepage computation, the structure arrangement of the cushion bottom could be asserted. to recheck the factors of safety against overturning and float flotation of cushion bottom, the stability computation methods of bottom of the literature, xiao wan hydraulic power station and ertan hydraulic power station were refereed

    根據穩定模型試驗及三維滲流計算成果,確定水墊塘底板的結構布置,參考國內小灣、二灘及參考文獻建議的底板穩定計算方法,復核水墊塘底板的抗傾、抗浮穩定。
  3. The main contents are as follows : in order to finish this work well, the author collected the basic parameters of water cushion in china and foreign countries, and analyzed the questions and shortcoming in the designing of cushion in domestic and abroad, and summarized the design experiment of xiao wan hydraulic power station and ertan hydraulic power station in china, finally the main controlling design parameters of baishan water cushion, that is the allow dynamic impact water pressure and unit water consumed energy rate were asserted

    具體內容如下:為了做好白山水墊塘設計,本文通過收集國內外水墊塘設計的基本參數,分析水墊塘設計存在的問題及不足,總結國內小灣、二灘工程的經驗,確定白山水墊塘設計主要控制參數即允許動水沖擊壓力及水墊塘單位水體消能率。
  4. To design the water cushion of baishan arc dam, the design experiment of ertan hydraulic power station, xiao wan hydraulic power station were refereed. through large amount of scientific experiments and theoretical calculation, and the design coefficients of water cushion in domestic and abroad were summarized, then the design layout of the baishan cushion was worked out at last

    本文針對白山拱壩水墊塘方案設計,參考國內二灘、小灣等工程設計經驗,通過大量的科學試驗和理論計算,總結國內外的水墊塘設計參數,最後確定了白山水墊塘的設計方案。
  5. The dj - a gynecological examination bed is uses the electrically operated lead screw to make the surface of bed fluctuation the power supply, when use so long as inserts the power source, controls the surface of bed with the foot the fluctuation, the seat back cushion and the cushion adjustment is uses was mad the spring makes the poweruses the electrically operated lead screw is the power supply, surface of bed fluctuation, the seat back cushion and ( manually controlled ) sits the board the angle adjustment the switch to control by the foot control, easy to operateif must cause to inspect the bed to move the position, blooms a base four feet turn of slightly tight pine, transfers to needs the position afternoon tight foot turn then the foot pad is the add - on component, may conveniently install according to the surgery need or dismount

    型婦科檢查床是採用電動絲桿作床面升降的動力源,使用時只要插上電源,用腳控制床面的升降,靠背和坐墊的調節是採用氣彈簧作動力.採用電動絲桿為動力源,床面的升降,靠背和坐板的角度調節均由腳控(手控)開關控制,使用方便.如果要使檢查床移動位置,將底部四個腳輪的稍緊松開,移到所需位置后稍緊腳輪即可.腳墊是附加裝置,根據手術的需要可方便地裝上或卸下。
  6. It features stable running, low power consumption, easy maintenance, etc. nonetheless this kind of cushion - shape machine has been widely used, such theories as air layer formation, spiral - slot style, pores arrangement requires further analysis and research since the machines are only manufactured based on common, design and test so far and many relations among the data have been fixed yet

    盡管氣墊機已被普遍使用。但迄今為止,對氣墊機的氣膜形成、盤槽形式、氣孔分佈等理論分析與研究還不夠深入,只是在常規設計和試驗的基礎上進行設計製造,許多參數之間的關系還沒能確定。
  7. According to the selected project, a stability test with scale of 1 : 35 of cushion bottom had been done. with the research results of the experiments and the flow shape of xiao wan hydraulic power station were thought about, on the other hand, the ternary complex jet shape of baishan water cushion was analyzed, all this gave a base for the analysis of the force of the cushion bottom. through observation, the dynamic water pressure, the fluctuation pressure, the time - homogeneous pressure on the surface of the bottom and the characteristics of the fluctuation pressure could be got, also the calculation method and the test results were compared to get the argument

    針對選定的方案,進一步做了1 : 35比尺的水墊塘底板穩定性試驗;通過試驗及借鑒小灣水墊塘內水流流態的研究成果,分析白山水墊塘內三元復雜淹沒射流流態,為水墊塘內底板受力分析打下基礎;通過觀測得到水墊塘底板動水沖擊壓力、脈動壓力、底板上下表面的時均壓力及脈動壓力特性,並通過計算方法與試驗成果進行相互比較論證。
  8. Abstract : for high arch dams in valleys with the characteristics of high water head, large discharge and large power, the problems of energy dissipation and scour prevention are serious. based on scientific studies, new comprehensive measures are proposed, including dispersion of discharge to waken wallop of the current, and reinforcement of riverbed to enhance the erosion - resistance. the measures can be used to solve the problem of energy dissipation properly. a typical layout scheme has been proposed in which slotted bucket with diversion teeth, double deck with pores, and cushion pool are considered practice has proved that the scheme is reliable and the effect of energy dissipation is obvious

    文摘:高拱壩泄洪消能的特點是壩高落差大,流量大,功率大,位於河谷狹窄地區,泄洪消能與防沖問題突出.經科學研究,採用「分散泄洪,削弱水流沖擊力,加固河床,增強河道抗沖能力」的綜合治理措施,較好地解決泄洪消能布置問題.提出了表孔大差動坎加分流齒、雙層多孔、水流撞擊、下設水墊塘聯合消能的典型布置方案,經實踐證明,方案可靠,消能效果好
  9. Power transformers and reactor fittings - protective relay for hermetically sealed liquid - immersed transformers and reactors without gaseous cushion

    電力變壓器和反應堆配件.密封的液浸變壓器和無氣墊反應堆用保護繼電器
  10. Power transformes and reactor fittings - part 3 : protective relay for hermetically sealed liquid - immersed transformers and reactors without gaseous cushion

    功率變壓器和電抗器配件.第3部分:無氣墊的密封液浸式變壓器和電抗器用保護繼電器
  11. Power transformer and reactor fittings - part 3 : protective relay for hermetically sealed liquid - immersed transformers and reactors without gaseous cushion

    功率變壓器和電抗器配件.第3部分:無氣墊的液體浸漬密封變壓器和電抗器用保護繼電器
  12. Power transformer and reactor fittings - part 3 : protective relay for hermetically sealed liquid - immersed transformers and reactors without gaseous cushion ; german version en 50216 - 3 : 2002

    電力變壓器和電抗器配件.第3部分:無氣墊的密封液體浸
  13. Higher energy prices could limit central banks ' ability to lower interest rates to cushion the impact of the credit squeeze and also reduce consumer purchasing power, weakening the economy even further

    能源價格走高,可能限制各國央行以下調利率來緩和信貸危機影響的能力,並且削弱消費者購買力,導致美國經濟進一步走軟。
  14. ( 6 ) the above mentioned research achievements are applied to rainfall infiltration analysis of cushion pooi slope of xiaowan power plant, atomized rain infiltration analysis of cushion pool slope of xiluodu power plant and influence of surface infiltration to the stability of cushion pool slope of xiluodu power plant

    將上述研究成果應用於小灣電站水墊塘區岸坡降雨入滲分析、溪洛渡電站水墊塘區岸坡霧化雨入滲分析以及霧化雨入滲對溪洛渡電站水墊塘區岸坡穩定性的影響等實際工程問題的研究。
分享友人