date of built 中文意思是什麼

date of built 解釋
建造日期
  • date : n 1 日期。2 時期;時代,年代。3 〈美口〉(和異性的)約會;〈美俚〉約會的對象。4 〈口語〉同日;本...
  • of : OF =Old French 古法語。
  • built : adj. 1. 建造成的,組合的,拼成的。2. 〈俚語〉體型美的。n. 〈俚語〉體型美,肉體美。
  1. The origins of tallinn date back to the 13th century, when a castle was built there by the crusading knights of the teutonic order

    塔林的起源可追溯到13世紀,當時條頓騎士團的十字軍騎士們在這里建造了一個城堡,而後這里發展成為了漢斯同盟的主要中心。
  2. The elysee palace, built in 1718, has a long history of closing to [ 2 ] 300 years to date

    愛麗舍宮興建於1718年,迄今已有近300年的歷史。
  3. Key issues of this edition are the integration of maerz ofenbau ag into the polysius group, the design and implementation of large capacity maerz pfr kilns as well as a survey of maerz lime kilns built to date in india with its booming market, above all in the iron and steel industry

    窯的執行麥爾茲石灰窯在印度的建造及對其繁榮市場的調查,最重要的是在鋼鐵工業。同樣, 「新聞」中也包括最新訂單的更新和執行的工程
  4. The data structure type was built for the photograph data, the international calculation criteria were adopted for the numeric data, the specific file table and file explanation was established for the text data, the date express type was established for the date data, and the definition of any specialty words and phrases was kept consistent

    其中,對圖片數據確定數據結構類型;對數值數據統一採用國際標準的計量單位;對文字數據擬定具體的文檔編碼表及文檔說明;對日期型數據確定日期表達的形式;任何專業名詞、術語的定義都嚴格保持概念的一致。
  5. Moore estimates have been produced to date, nearly every one has been built on the “ ground level, ” directly on the surface of silicon crystals

    半導體工程師完成了一項令人意想不到的成就,就是讓微晶片里的電晶體密度加倍成長,這在業界稱為摩爾定律。
  6. Approximately three months prior to the scheduled date for mechanical completion, buyer shall advise seller that it is ready to have a minimum of two seller representatives, to be provided through seller ' s affiliate to proceed to the site, at buyer ' s expense, to inspect the plant and to ascertain that the plant has been built in accordance with the project specifications and is ready for commissioning

    在擬定的機械完工日期前3個月左右,買方應通知賣方準備要賣方從其所屬單位選派至少兩名代表來現場對工廠進行檢查,並確定工廠的建設是否符合項目技術規范,是否具備了試車的條件;選派上述人員而發生的費用應由買方承擔。
  7. The message box is not displayed and the out of date project configuration is built

    將不顯示消息框,並且生成過期項目配置。
  8. The message box is not displayed and the out of date project configuration is not built

    將不顯示消息框,並且不生成過期項目配置。
  9. From conception to delivery, heng tong can produce custom - built, individually designed products, utilising the most up to date computer aided design tools and software, our dedication to maintaining the highest standard of quality and service means we consistently deliver total

    我們堅持「精品質優,熱忱服務,顧客滿意」的企業基本方針。 「製造客戶滿意的產品,提供客戶滿意的服務」 。
  10. A computer system has been built to improve efficiency in the collection of operational data from the department s district environmental hygiene offices across hong kong. up - to - date management information can now be compiled more easily, timely and consistently

    本署現已建立了一套電腦系統,提高了收集全港各分區環境?生辦事處運作數據的效率,讓員工可更容易更適時和更一致地編制最新的管理資訊。
  11. ( 3 ) the statistics model is employed to press and analyze the date, which were collected through the security field monitoring, to the stress and deformation of the med, and then these results were compared with fem results, of the med before it was banked to 140m. ( 4 ) the stress and deformation prediction the med has been made both while the dam has been built height of 185m and after the reservoir is full of water

    ( 3 )茅坪溪防護大壩填築至140米高程時應力和變形安全監測資料分析:使用統計模型對應力和變形安全監測獲取的應力和變形資料進行數據處理和分析,並與茅坪溪防護大壩140米高程以下施工情況下的應力和變形的分析計算結果作出比較。
  12. Based on the data of ice flood from 1957 to 1983, the method of topological forecasting of grey theory was applied to study the law of ice condition of inner mongolia reaches of the yellow river, and topological models of ice flood were built, and the freeze - up date and break - up date of the yellow river from 1984 to 2005 were calculated

    摘要本文應用灰色拓撲預測方法,根據1957年- 1983年的實測資料,探討黃河內蒙古段冰情預報的規律,並建立了冰情預測模型,對1984 ~ 2005年的開河、封河情況進行了預測。
  13. Web service based distributed file service system, which is based on web, xml, and soap and built on hierarchical cache management, distributed mass - storage data management, access control, has a good extensibility, flexibility, reliability and security on the management system of enterprise ' s mass file date

    基於webservice構架的分散式文件服務系統基於web 、 xml和soap技術、以及層次式緩存管理、分散式海量數據管理、訪問控制等等多項技術,系統實現了企業級海量文件數據管理系統對可擴展、柔性、全分佈、可靠、安全等幾方面需求的支持。
  14. Then, we come in front of a tall and big monument, this was built for the last file that commemorated kim il sung signed before death, sign date as july 7, 1994 on the tablet

    接著,我們來到一個高大的紀念碑前,這是為紀念金日成生前所簽署的最後一份檔而建造的,碑上署名日期為1994年7月7日。
  15. According to the date inscribed on the name board hanging over the main entrance, the ancestral hall was believed to be built around twenty - seventh year of qianlong reign of the qing dynasty i. e. 1762

    據懸于祠堂正門的牌匾年份推測,居石侯公祠約建於清乾隆廿七年( 1762 ) 。
  16. In addition, authoring such large targets with so many tasks makes it difficult to perform good incremental builds builds in which only those targets that have not been built before or targets that are out of date are rebuilt

    此外,編寫具有這么多任務的大型目標將加大執行好的增量編譯(僅重新生成以前未生成的目標和過期的目標)的難度。
  17. To enable incremental builds builds in which only those targets that have not been built before or targets that are out of date, are rebuilt, the microsoft build engine msbuild can compare the timestamps of the input files with the timestamps of the output files and determine whether to skip, build, or partially rebuild a target

    為啟用增量生成(這類生成僅重新生成以前未生成過或已過期的目標) , microsoft build engine ( msbuild )可以比較輸入文件的時間戳和輸出文件的時間戳,並確定是跳過、生成還是部分重新生成某個目標。
  18. In the second, the internal weakness and strength are set up through analysis of the key fundamental factors that affect gea performance. in the end, gea ' s developing strategy is built up applying up - to - date corporation strategy management theory. as a result, a series of product developing strategies, marketing strategies, human resource exploiting strategies and financing strategies are formulated to diversity strategy

    本文將以中國當前的市場經濟環境為背景,首先對陜西銀河電力自動化有限公司所處的外部環境進行深入系統的分析和研究,找出企業面臨的外部威脅和市場機遇;並根據企業內部經營管理各種基本因素的弱勢和優勢,運用現代企業競爭戰略理論,確定企業發展戰略總目標和方針政策,制定了一系列的以經營歧異性為指導思想的產品創新戰略、市場營銷戰略、融資策略和人力資源策略。
分享友人