day tank 中文意思是什麼
day tank
解釋
日槽-
It mainly controls the dilution of original chemical and the transfer to the day tank
主要控制將原化學試劑稀釋並移入日箱的過程。 -
It mainly controls the transfer of the chemical from the drum container to the day tank
主要控制將化工試劑從桶形容器移至日箱的過程。 -
It mainly controls the receiving of the chemical from the day tank and the supply of the chemical to the p. o. u
主要控制從日箱接收化學試劑並將其分配到使用點的過程。 -
The whole project comprised the building of the dam, a 2, 428 - yard tunnel driven through the wong nai chung gap valley and a 5, 500 - yard brick and stone aqueduct to connect the reservoir with the storage tank and filter beds at albany road. each day the volume of water being conveyed reached 7 million gallons. the 6 filter beds of the project were situated on the eastern side of the albany nullah ; measuring 3, 245 sq
除水壩外,其他配套的工程包括: (一)一條長達2 , 428碼、貫穿黃泥涌峽谷的隧道; (二)一條長5 , 500碼的引水道,可連接水塘隧道的亞賓尼濾水池及配水庫,該引水道用石及磚砌成,每天可輸水700萬加侖; (三)位於亞賓尼水渠東部的六個過濾池,該濾水系統面積廣達3 , 245平方碼,深30尺,每天可過濾570萬加侖水,原水過濾后,經一條直徑18寸鐵水管,流入花園道與寶雲道交界的配水庫。 -
Various forms of combining parts of the invention, by which water in multi - stage recirculating water - heating tank for collector and / or multi - stage confluent water - heating tank, as a whole or separately, can be heated by solar energy collector, or a heat pump, or an electrical heater, fall into the following categories : on sunny day, it ' s enough to use the solar energy collector to heat water, then hot water is stored ; in confrontation with off - peak electricity at night, use the heat pump or the electrical heater to heat water, then hot water is stored ; during the time of a cloudy day without off - peak electricity, use the heat pump to instantly heat water according to the storage capacity of predetermined amount of produced hot water, then hot water is stored
所述的經太陽能集熱器、或熱泵、或電加熱裝置同時或分別對集熱器循環加熱水箱、分級加熱式匯流熱水箱中的水進行分級加熱的組合包括:陽光天可全部採用太陽能集熱器進行加熱和儲存熱水,夜間峰谷電時段可採用熱泵或電加熱裝置進行補充加熱和儲存熱水,無陽光的非峰谷電時段可根據定量的熱水儲量設置需求採用熱泵進行即時加熱和儲存熱水。 -
Following the requirement of the reservoir operation section of north - west electricity management bureau in developing a 10 day runoff forecasting scheme and considering the situation of no suitable forecasting model to serve the purpose, this thesis, from ge shouxi ' s and wmo ' s point, defined a group of standards which are practicability, information ability which means the ability of a model to adopt information contend in observed data, extension capacity and robustness, being used for evaluating performance of a forecast model and with them makes a comparison among systematic models as multi - regression model, generalized tank model, neural network method and system model of genesis ( in short smg ), and one conceptual model, the xinganjiang model
針對西北電網水調部門提出的開發黃河上游徑流中長期預報軟體的任務,根據wmo和葛守西的總結,本論文利用四個系統模型和一個概念模型對黃河上游的龍、劉兩庫的汛期入庫徑流量進行旬徑流預報嘗試,並對所用的模型進行了泛化性、穩健性、模型結構、對水文信息反映和實用性及作中長期預報時何種系統模型的輸入最好作了比較研究,為龍、劉兩庫的徑流中期預報模型的採用提出了建議。 -
Israel has launched several more airstrikes on southern lebanon today, cutting shorter a two - day pause in the attacks after hezbollah guerrillas blew up an israeli tank
以色列今日再度對黎巴嫩進行空襲。這次空襲結束了自真主黨游擊隊炸毀了一輛以色列坦克后兩國間的兩天停戰。 -
One day two ants were playing by a road. suddenly a truck came on which lay an oil tank. the word written on the tank read “ explosion
一天兩只螞蟻在路邊玩,突然一兩卡車開過來,上面有一油罐,罐上寫著「爆」字。 -
Yards and a depth of 30 ft. each day 5. 7 million gallons of water could be filtered. after being filtered, water passed through the 18 - inch diameter pipe to the storage tank at the junction of garden road and bowen road. the tai tam valley scheme was gigantic even for the first phase, in 1883 - 1888, costing the government 1, 250, 000 dollars
大潭的供水系統工程龐大,單在1883 1888年第一期的工程已耗資125萬元,較薄扶林水塘總支出50萬元,高出一倍有多,而大潭水塘擬興建的容量為2
分享友人