drill site 中文意思是什麼

drill site 解釋
井位
  • drill : n 1 【軍事】操練,演習;(嚴格而有系統的)盤練,訓練;〈英口〉教官。2 【機械工程】鋼鉆,鉆頭;鉆...
  • site : n 1 地點;位置;地基。2 場所,現場。3 遺址。4 【計算機】網站,站點〈電腦網路用戶的網站地址〉;萬...
  1. As the main drill site for the eight metropolitan prefectural municipal authorities, various drills were executed in tokyo including a drill in which the rescue team of the seoul fire department participated as a foreign support force

    作為8個都會縣級市級權威訓練基地中的主要演習場地,東京舉行過各種演習。韓國首爾消防部救援隊也作為外國支援力量參與其中。
  2. Indeed, after all the various attendant service needed to drill a well are summed up, there could be as many as a hundred service and supply companies working at the drill site at one time or another

    實際上,累計鉆一口井所需要的服務,在一個鉆井場地同時或不同時有一百多家服務或供應公司工作。
  3. The site boundary of the drill yardparade ground of the fireboat station and pier needs to be fenced off by a 3 m high fence wall or fencing with spikes on top ( please refer to item 23 of annex viii to schedule of accommodation and technical schedule for reprovisioning of tsim sha tsui fire station complex in the cd - rom contained in volume two of the ifp )

    滅火輪消防局和碼頭的操場有需要用三米高而頂部帶有尖刺的圍墻或圍欄沿界線圍起來。這方面請參閱重置尖沙咀消防局綜合大樓的空間分配表和技術規格附件viii第23項(載于發展建議邀請書第二冊附連的光碟內) 。
  4. 2 operating drill through the centralized control panel ensures assure safety operation and on - site cleanliness

    2鉆機通過操縱臺集中操作,安全衛生。
  5. Through reservoir prediction, it indicated that the reservoir in mainan structure and mopan - laowan buried structure which located in short limb and bottom wall were finely developed, this two areas were the primary area for the further exploration and drill site design in dachiganjing structural belt

    通過儲層橫向預測,發現麥南構造和陡翼斷層下盤的磨盤老灣潛伏構造儲層較發育,是大池乾井構造帶下一步勘探及井位部署的重點區域。
  6. Though the drill site is not in a disputed area, the field straddles the contested demarcation line and japan worries that reserves in the area might be sucked dry

    雖然鉆探地點不在爭議區域(一個跨越爭議勘界線地域) ,但日本擔心這一地方的資源會被榨乾。
  7. The hkma back - up site was remodelled during 2005 to meet the requirements of a revised and expanded business continuity plan. a two - week drill was carried out with satisfactory results

    金管局在2005年改建后備場地,以配合經修訂及擴大的持續運作計劃,並進行了為期兩周的演習,結果令人滿意。
  8. 3 a set of front - mounted adjustable columns on drill frame is used for adjusting height of mast front - end, which makes it easy to align with hole site

    3鉆機機架前部設有上下調節立柱及哈夫,可調節桅桿高低國家專利: zl02264791 . 0 ,施工時對孔位快捷方便。
  9. 3 a set of front - mounted adjustable columns on drill frame is used for adjusting the height of mast front - end, which makes it convenient to align with hole site

    3鉆機機架前部設有上下調節立柱及哈夫,可調節桅桿高低國家專利: zl02264791 . 0 ,施工時對孔位快捷方便。
分享友人