driven tunnel 中文意思是什麼

driven tunnel 解釋
入土隧道
  • driven : adj. 1. 被逼迫的,不得已的,被驅使的。2. 打入的。3. 吹積起來的。4. 【機械工程】從動的。
  • tunnel : n 隧道;地道;坑道;管道,煙道,風洞;【礦物】石巷,平峒。 tunnel warfare 地道戰。vt (〈英國〉 l...
  1. At about 11. 30 am today ( october 4 ), a private car driven by a 35 - year - old man was travelling along the sound bound carriageway of canal road flyover. it crashed to a roadwork and the embankment when it reached the entrance of the aberdeen tunnel. after the impact, the 35 - year - old driver and five passengers, comprising a five - year - old girl, two men and two women aged between 18 and 49, were injured

    今日(十月四日)上午約十一時三十分,一名三十五歲男子駕駛私家車沿堅拿道天橋南行,駛至香港仔隧道入口時,突然沖向一個道路工程及石? ,結果導致三十五歲男司機及五名乘客受傷,包括一名五歲女童及年齡十八至四十九歲的兩男兩女,六名傷者全被送往律敦治醫院治理。
  2. Through analyzing all kinds of construction methods of building metro station under shield driven method in many countries, this paper studies the construction technique ( method ) of building metro station under shield driven method, taking in guangzhou no. 3 metro line, and linhe xilu station as the actual object. according to station class, function and topography and geology, the station schemes of twin - bore tunnel ( island ), firstly, three parallel tunnels ( island ), tri - bore tunnel ( island or side ) and four parallel tunnels ( island or side ) are proposed. secondly, the shape and main parameters of station structure on two schemes are analyzed with load - structure mode, for different overburden depth of tunnel and lining thickness, etc. thirdly, the construction process is simulated in 2d fem.,

    根據建站的規模、使用功能及站位地形地質條件,提出了兩連拱結構島式站臺車站、三條平行隧道島式站臺車站、三連拱結構島式和側式站臺車站以及四條平行隧道島式和側式站臺車站方案;採用荷載?結構模式,對四種方案的主體結構的形式和重要參數進行分析研究,分不同的埋深、襯砌結構厚度和拱形結構的拱跨比進行了多組數值計算;採用平面有限元方法對四種車站結構的開挖施作過程進行了模擬分析。
  3. The whole project comprised the building of the dam, a 2, 428 - yard tunnel driven through the wong nai chung gap valley and a 5, 500 - yard brick and stone aqueduct to connect the reservoir with the storage tank and filter beds at albany road. each day the volume of water being conveyed reached 7 million gallons. the 6 filter beds of the project were situated on the eastern side of the albany nullah ; measuring 3, 245 sq

    除水壩外,其他配套的工程包括: (一)一條長達2 , 428碼、貫穿黃泥涌峽谷的隧道; (二)一條長5 , 500碼的引水道,可連接水塘隧道的亞賓尼濾水池及配水庫,該引水道用石及磚砌成,每天可輸水700萬加侖; (三)位於亞賓尼水渠東部的六個過濾池,該濾水系統面積廣達3 , 245平方碼,深30尺,每天可過濾570萬加侖水,原水過濾后,經一條直徑18寸鐵水管,流入花園道與寶雲道交界的配水庫。
  4. According to the requirements of propeller aerocraft model test in wind tunnel, specifications of the driven motor is presented by aerodynamic analysis, and a short - term operated high power density three - phase induction motor is developed with reasonably designing the motor, such as electromagnetism load, heat checkout and high - efficiency heat exchanger

    摘要針對螺旋槳飛機模型帶動力風洞實驗要求,通過氣動性能分析提出驅動電機的技術指標,在滿足結構約束的條件下,通過合理設計電機的電磁負荷、校核發熱、採用高效冷卻裝置等,研製出短時工作制高功率密度三相異步電機。
  5. Autosd is a compositive software for hydraulic tunnel aided design, with functions of route selection of tunnel, atress analyse and computation, exporting drawings and reports. autosd software is programmed by visual basic6. 0, organized by event - driven methods

    Autosd軟體專門針對小型有壓水工隧洞設計的一個集成性輔助設計系統軟體,它集隧洞選線,水工各種計算,圖紙繪制以及報告輸出等多項功能於一體。
  6. In the end, two illustrated examples - one is two nesting thick cylinders subjected to internal pressure and the other is a shield - driven metro tunnel, were solved with this method successfully

    最後,應用給出的方法計算了2個算例內壓作用下2個相套厚壁圓筒接觸和用盾構法修建的地鐵隧道的受力變形。
  7. Application of high performace concrete in lining segment of shield driven tunnel

    高性能混凝土在盾構隧道管片中的應用
  8. According to this practical project, beijing metro no. 10 line crosses under the beijing metro no. 13 line existed station structure, this paper has made an overall and systemic analytical study on crosswise surface settlement and the longitudinal surface settlement process which influence by metro tunnel construction with shield driven method through analyzing a mass of site monitoring data. the settlements in different period are concluded, the crosswise surface settlement influence scope, some construction factors to surface settlement has been analyzed too

    本文針對北京地鐵十號線芍藥居至北土城東站區間隧道下穿既有城鐵十三號線芍藥居車站結構這一實際工程,通過大量的現場監測資料分析,研究了盾構掘進過程中對橫向地表沉降和縱向地表沉降的影響過程;探討了盾構掘進各個階段的沉降占總沉降量的百分比;分析了盾構掘進對橫向地表沉降的影響范圍,以及各種施工因素對地表沉降的影響。
  9. Some experiences on guangzhou metro are summed up and some suggestions on the present design of shield driven tunnel are put forward

    總結了廣州盾構隧道設計中的成功經驗,並對當前盾構隧道設計中有關問題提出了建議。
  10. 3d fem analysis of shield driven tunnel with super shallow depth

    超淺埋盾構法隧道施工方案三維有限元分析
  11. The shield driven tunnel of yuexiu park to sanyuanli in no. 2 line of guangzhou metro has been built and used in informal business in 2002

    摘要廣州地鐵二號線越秀公園三元里區間盾構隧道已於2002年建成並投入試運營。
  12. Based on some calculation methods on transverse ground settlement, the mechanics of ground settlement caused by shield tunnel construction are discussed. in combination with the shield driven section from xuanwu gate station to new mofan road station of nanjing metro, the monitoring data are analyzed. mainly zone and the subordinate zone of ground settlement caused by shield tunneling is summed up, and the influence zone are definite

    2 、通過對盾構推進產生地表沉降機理的論述,在總結了各種理論計算方法的基礎上,結合南京地鐵玄武門新模範馬路區間的實際情況,實測了大量的橫斷面數據,並進行分析研究,得出了盾構推進對地表影響的主區域和次區域,明確了盾構推進時對橫向地表的影響范圍,研究結論具有很好的社會效益和經濟效益。
  13. Tunnel construction technology with shield driven method is being widely used in building metro engineering because of its ’ unique characteristics and advantages such as intelligence, safety and quickness, etc. however, it is inevitably caused ground surface settlements and soil distortion

    盾構法已經成為我國地鐵工程中一種重要的施工方法。盾構法隧道以其獨有的智能化、安全、快捷等特點和優勢,在地下工程中得到廣泛的推廣和應用。
  14. For this reason, this paper proposes the construction plan of expanding building metro station combined with natm ( new australia tunnel method ) on the base, of shield driven internal tunnel that has been built

    為此,提出了在已經建成的區間隧道基礎上,結合新奧法進行擴挖而形成地鐵車站的施工方案。
  15. Waterproofing of joints between segments in shield - driven tunnel from yuexiu park to sanyuanli in no. 2 line, guangzhou metro

    樁基托換技術在廣州地鐵三號線工程中的應用
  16. Shortly before midnight, a light - goods - vehicle ( lgv ) driven by a 35 - year - old man was travelling along the fast lane of tsing kwai highway towards the airport. on reaching near the entrance of cheung tsing tunnel, it reportedly rammed the rear part of a maintenance truck which stopped on the same lane

    約凌晨時分,一名三十五歲男子駕著一輛輕型貨車沿著青葵公路快線往機場方向行駛,接近長青隧道入口時,據報撞向一輛停在同一行車線的維修工程車的尾部。
分享友人