dry weather flow 中文意思是什麼

dry weather flow 解釋
旱季流量
  • dry : adj 1 乾的,乾燥的;無水分的,干透了的。2 (井、河等)乾涸的,枯竭的;(氣候)乾旱的;無奶的;無...
  • weather : n 1 天氣,氣候;暴風雨(天氣)。2 (某種)時候;處境;狀況。vt 1 使暴露在風雨中;通風,晾乾,吹乾...
  • flow : vi 1 流,流動。2 (血液等)流通,循環。3 流過;川流不息;(時間)飛逝;(言語等)流暢。4 (衣服、...
  1. Construction and operation of a sewage pumping station with an average dry weather flow of about 12, 100m3 per day

    建造及營辦一個平均旱季流量約為每天12 , 100立方米的污水泵水站。
  2. As their name implies, dry weather flow interceptors function to intercept polluted effluent flow and divert it to sewers and thence to treatment plants

    顧名思義,該設備可阻截染污河水使其流至污水渠,繼而輸往污水處理廠。
  3. However, dry weather flow interceptors are only interim measures. as is always the case, it is improved sewerage that makes the biggest difference to river water quality

    然而旱季截流設備僅是臨時性的減污措施,要徹底改善河溪水質,完善全港的污水系統才是治本之法。
  4. Since 1992, dry weather flow interceptors have been constructed as an interim measure downstream of some key villages, to intercept polluted flows and direct them into sewers

    自1992年起,政府在一些主要的鄉村下游安裝旱季截流設備為臨時措施,將污染河水引至污水渠。
  5. At the end of 2003, the dry weather flow interceptors that had been installed along the kai tak nullah were upgraded and turned into an enclosed conduit that helped reduce the odour problem

    在2003年底,啟德明渠內裝置的旱季截流設備進行了一項全面的改善工程,轉換為密閉式導管,以紓緩渠水惡臭的問題。
  6. One way to help minimise pollution even before all expedient connections have been eliminated and a comprehensive sewerage system put in place is to build dry weather flow interceptors below pollution sources

    要清除所有非法接駁的排污渠和擴展公共污水收集系統至全港各地需要一定的時間,目前為盡量減低河溪污染,政府在污染源下游建設了旱季截流設備。
  7. As for villages still not served by the public sewer network, the dry weather flow interceptors are continuing to serve their purpose, and the epd has been active in offering villagers advice on how to properly maintain their septic tanks so as to minimise pollution risks

    至於目前尚未接駁至公共污水收集系統的鄉村,則會繼續以旱季截流設備作臨時措施,環保署亦會積極指導村民如何妥善維持化糞池運作,把污染風險減至最低。
  8. Various sewerage works were outlined in the east kowloon and north south kowloon sewerage master plans drawn up for the area, and these began to be carried out in the 1990s. they included construction of a number of dry weather flow interceptors along the nullah to intercept polluted storm flow, along with the replacement of worn - out and often overloaded sewerage facilities

    東九和九北部及南部污水收集整體計劃為該區規劃了多項污水工程,這些工程在九十年代陸續動工,當中包括沿啟德明渠建造旱季截流設備以截止污染雨水,以及更換負荷過重又殘舊的污水設施。
  9. To further minimise the problem caused by wastewater found in the communal drains, the drainage services department had installed a dry - weather flow interceptor in the section of the underground communal drainage system around the intersection of dundas street and portland street. during dry weather, the interceptor can intercept the wastewater discharged into the communal drainage system and divert it back to the communal sewerage system

    為進一步減低流入公用排水渠的污水所造成的問題,渠務署亦已於登打士街和?蘭街交界的地下公用排水系統設置旱流污水截流設施,在無雨的時候將排放到公用排水系統中的污水引回公用污水系統。
分享友人