elevation order 中文意思是什麼

elevation order 解釋
高程等級
  • elevation : n. 1. 高舉,高陞;【醫學】挺起,隆腫。2. 升級;上進,向上。3. 高尚。4. 高處,高地,高度;海拔;(槍炮的)仰角,射角;【測】標高。5. 【建築】正視圖;立視圖。
  • order : n 1 次序,順序;整齊;(社會)秩序,治安;狀況,常態;健康狀態;條理;會場秩序;議事程序,日程;...
  1. Because of the complexity of calculation result data, and in order to simplify the analysis of results, this paper only provides annual temperature isoline map of february, may, august and november during construction, temperature isoline map of the first, fifth, tenth, twentieth and thirtieth year during operation, duration curve of temperature and stress of typical point at different elevation, the maximal stress distribution along dam height, point at different elevation, the maximal stress distribution along dam height, and the maximal and minimal temperature and the maximal tensive stress and its position of every month

    因計算結果數據量非常大,為便於成果分析,本文僅給出施工期每年2 、 5 、 8 、 11月份和運行期第1 、 5 、 10 、 20 、 30年的溫度等值線圖,壩體不同高程典型點溫度和應力歷時曲線圖,最大應力沿壩高分布圖,逐月最高、最低溫度和最大拉應力值及相應的位置等。
  2. The geological factors are important besides them, which are related to the loess landslide and evolution of gullies, specially for bedrock folds, bedrock joints and loess joints. in field, the data of the bedrock elevation in the three sheets combined with the research from south to north lively were got by gps12xlc pocket locator, the type and its evolution of bedrock, loess landslides and distribution of hydrographical net were explored too. at office, the synthetic analysis and contrast were used including the simulating analysis about the data by mapinfo 6. 5, software of gis, discussion and communication with experts, in order to demonstrate and reveal the rules between the loess landforms and its pale bedrock landforms and the impact of structure on erosion interiorly in shaan bei

    在野外,以代表調查區和路線調查相結合的方法,利用gps12xc型手提式定位儀採集基底高程數據,實地觀察基底地層產態變化規律和特徵,觀察黃土地貌、黃土崩塌、水系展布及土壤侵蝕等與地質構造之間的關系;在室內主要進行綜合分析與對比,利用gis系統的mapinfo6 . 5軟體對採集數據模擬分析,並將認識成果與其他專家學者進行交流和探討,從而論證和揭示陜北黃土地貌南北縱向分異與基底古樣式關系特徵及水土流失與構造因素之間的內在規律。
  3. After the reservoir sluices, the national highway 213 in this area will be submerged. so the national highway 213will increase its elevation to about 920 meters. in order to estimate the influence of the slope - sliding and bank - collapsing which caused by the reservoir sluices to the elevated highway, and to estimate possible emigration problem, stability analysis of landslide body no. l, 2, and 3 in i, ii area which located in bank accumulation body of zipingpu reservoir in national highway 213 is made by transfer coefficient method and 2 - d 3 - d fem in this paper

    紫坪鋪水庫正常蓄水位高程877m ,水庫蓄水后將淹沒該段現國道213線,因此國道213線將改線抬高至920m高程附近,為正確評價因水庫蓄水造成的滑坡、塌岸對改線公路的影響,以及可能產生的移民問題,本文用傳遞系數法和二維、三維有限元方法對有可能失穩的213國道紫坪鋪庫區庫岸堆積體、區的1號、 2號、 3號滑坡體進行了穩定性分析。
  4. Under his meticulous supervision the grand plan for shanghai gradually took shape, for example the opening up of pudong and its elevation to a financial centre. the city also sought advice from the japanese experience in order to secure an international expo in the near future. these projects, set in motion in the 1980s, are now splendidly bearing fruit

    在他全力籌劃之下,上海市未來發展的面貌,已具雛型,例如開發浦東並將之提升為金融中心,向日本世博專家取經,為上海爭取成為未來世博會址等大計,在八十年代初期,已逐一推行。
  5. In this paper the friction piles are used in zipingpu multi - purpose dam construction project, the spillway in the side slope is covered with overburden, the horizontal area is from sp. 0 + 200m to sp. 0 + 280m, the elevation is about from el. 810m to el. 950m, there is hard and integral rock under the overburden, which provides enough anchor ability, and it ' s requirement to set the friction pile at the appropriate place ; in order to improve the slope stability that suitable excavation or weeding off the disadvantage load on the landslide are good measures, for the scarp it ' s better to reduce the slope

    摘要紫坪鋪水利樞紐工程溢洪道樁號0 + 200 ~ 0 + 280 、高程810 ~ 950m范圍的內側邊坡為覆蓋層邊坡,坡體下部有較為完整堅硬的巖石,具備提供足夠錨固力的條件,在適當的位置可以考慮設置抗滑樁,再通過適量的開挖提高邊坡穩定性,或將滑坡體上部不利於穩定的荷載挖除,對于陡坡的坡面可以將坡削緩,則效果會更好。
  6. Moreover, in order to enhance the image of high - rise buildings in detail, more analysis for the rule of elevation design has been made based on the study of form composition. the thesis puts forward the image of high - rise buildings " form and facades in the future by analyzing subjective conception of contemporary culture

    同時,在造型研究基礎上,論文對高層建築立面細部設計的內在規律作了進一步分析,力圖從整體到細部實現造型的完善和細化;並通過分析當代新藝術觀念影響下的立面設計思潮,提出了目前高層建築領域中造型及立面設計的發展方向與未來趨勢。
  7. The competition of twenty - first century is the competition of talent while talent are deternined by education. the new stage ask the students which we trained not only have the ability to deal with information comprehensively, but also learn how to cooperate with others, how to do things and how to recognize things and how to survive in order to cultivate the new generation with creativity, we must reform the present teaching models of china. the popularity of modern educational technology which is the " commanding elevation " and " breach " of education reform not only affects the process of our country ' s educational informatization reformbut also determines whether we could win the talents competition of twety - first century

    二十一世紀的競爭是人才的競爭,而人才取決于教育。新時代要求我們的教育能夠培養出不僅具有綜合信息處理能力,還要「學會生活,學會做事,學會認知和學會生存」的具有創新能力的一代新人,因此我們必須改革我國現有的教學模式,現代教育技術作為教育改革的制高點、突破口,它的普及和推廣不僅影響我國教育信息化的進程,還決定著我國在二十一世紀的人才競爭中是否能夠取勝。
分享友人