factor of load distribution 中文意思是什麼

factor of load distribution 解釋
載荷分配因素
  • factor : n 1 〈英國〉經銷人;(代客買賣收取傭金的)經紀人;代理商;代辦人;〈蘇格蘭語〉 土地經管人。2 要素...
  • of : OF =Old French 古法語。
  • load : n 1 裝載,擔子;負擔;工作(負荷)量。2 (車船等的)裝載量;一馱,一車,一飛機。3 【電、機】(機...
  • distribution : n 1 分配,分發,配給;分配裝置[系統];配給品;配給量;【經濟學】配給方法,配給過程;分紅;【法律...
  1. First, the theory of fretting wear and studies on fretting fatigue were introduced and the parametric method was used in the process of creating the model of dovetail joints in ug software. the elastic contact problem is analyzed in finite element method ( fem ) and is used to the parameters " distribution and contact stress of the joint are obtained on the base of ansys code. with the effect factor of load frequency, the prediction method of fretting fatigue life of dovetail joint under low and high / low cycle complex load is proposed

    本文介紹了微動損傷的機理和微動疲勞壽命的研究方法;利用ug軟體對燕尾榫聯接結構創建了參數化實體模型;基於ansys軟體平臺求解彈性接觸問題,獲得了榫聯接結構接觸應力及接觸狀態量的分佈;在已有微動疲勞壽命預測模型的基礎上,引入載荷頻率影響因子,對低周、高低周復合載荷作用下的燕尾榫聯接結構進行了微動疲勞壽命的預測,與試驗結果對比表明採用本文提出的方法預測榫聯接結構的微動疲勞壽命是有效的。
  2. Assemblage ) represented the coastal shallow - water environment ; factor 2 ( protelphidium tuberculatum assemblage ) represented the alongshore cold - water current area or cold shallow sea environment ; factor 3 ( elphidium magellanicum assemblage ) represented the sh allow sea ( < 20 - 30m depth ) deposit ; factor 4 ( ammonia ketienziensis assemblage ) represented the shallow - sea water more than 50m depth ; and factor 5 ( buccella frigida assemblage ) represented the colder - water sea environment ; and the distribution of factor load accorded with the character of benthic foraminifer community

    Q型因子分析揭示ey02 - 2孔5種有孔蟲組合,分別對應濱岸鹽沼環境、黃海沿岸流冷水分佈區、高潮坪淺海沉積環境、水深大於50m的現代淺海環境及較冷的沉積環境。因子載荷的分佈與有孔蟲群落特徵吻合較好。南黃海有孔蟲含量? ?水深轉換函數關系式有一定的局限性,並不能在南黃海陸架地區推廣使用。
  3. Through calculation and dynamic adjustment of the distribution factor for every power plant and tie line, more accurate load flow change can be obtained

    通過計算並動態調整各個調節電廠和聯絡線的調節分配因子,得到比單個鬆弛節點計算時更加實際的潮流變化。
  4. ( 2 ) based on the existing theory of lateral load distribution rule, and combined the structure characteristic of pre - stressed lager cantilever composite beam with corrugated steel webs, this thesis proposed the modified rigid beam method. taking this method, it is facilitated to compute the lateral load distribution factor of bearing composite cantilever beam with variable - stiffness under the load in arbitrarily position

    ( 2 )以現有的橫向分佈理論為基礎,結合大懸臂波形鋼腹板組合挑梁的結構特點,提出了修正剛接梁法的計算方法,能夠方便地計算變剛度懸臂組合梁任意點位的橫向分佈系數。
  5. Section iii proposes a possible organization of a reactive power market, a regional reactive power market established according to the distribution of the load and the reactive supply. the regional reactive power market is composed of a reactive energy market based on marginal pricing and a reactive capacity market based on a reactive regulating capacity payment. the cases in section iv, based on the market organization proposals and the reactive bid structure previously presented, performed on a five - bus system and the ieee 14 bus system, are used to analysis the effects of active bid, voltage control and power factor on the reactive marginal price

    本文首先回顧了電力市場發展的歷史和現狀;然後對市場中的定價方法和無功輔助服務的內容及特點進行了總結,並介紹了一些國家的無功輔助服務市場模式和交易方法;接著立足我國國情,提出了單邊開放電力市場下的無功市場框架:即根據負荷和無功源的分佈特點建立區域無功市場,各區域無功市場又由相應的無功電量市場和無功容量市場組成;並提出了該無功市場模式下的機組報價模型和基於報價的以系統總購電費用最小為目標的無功電價計算方法;最後用一個5節點系統和ieee14節點系統進行了實例分析,初步研究了發電機有功報價、系統電壓控制以及負荷功率因數對無功電價的影響,得出了一些有借鑒意義的結論。
  6. Thereafter, the fractal dimension value of cracks distribution was presented as an effective index to appraise the corrosion level. relations between fractal dimension and rebar corrosion ratio, concrete deterioration factor and strength of the member were studied respectively. fractal nn model was also built up to predict the ultimate load bearing capacity of crc members obtained from the field corroded structures, good results are achieved, which could provide an applicable method to evaluate the durability of crc members

    揭示出受腐蝕鋼筋混凝土構件在荷載作用下表面裂縫分佈服從統計意義上的分形,並對其進行了分形描述;提出以裂縫分形維數作為受腐蝕程度的有效衡量指標,首次實現了構件受腐蝕程度的定量描述;建立了裂縫分形維數與鋼筋銹蝕率、混凝土劣化系數、構件承載力之間的定量關系,並建立了分形神經網路模型對實際受腐蝕鋼筋混凝土構件進行了極限承載力的預測,取得了較好的預測效果。
  7. By analyzing the load factor and unbalance factor of distribution transformer, the method of calculating and selecting the low voltage reactive power compensation capacity and compensation equipments, and the connection mode of capacitors were presented

    摘要通過對配電變壓器負載率和不平衡率的分析,提出低壓無功補償裝置補償容量的計算選擇方法和電容器的接線方式。
  8. Based on wind tunnel test and theoretical analysis, the vibration mechanism, vibration shape, dynamic response and equivalent wind load factor of the long - span grid roof of taizhou stadium subjected to wind excitation are analyzed systematically in this dissertation, and some valuable results are obtained. in the matter of wind tunnel tests, the distribution rules of roof under various wind directions are obtained through the data got from the wind tunnel tests for rigid model of long - span grid roof of taizhou stadium

    在風洞試驗方面,通過對臺州體育中心屋蓋剛性模型在模擬大氣邊界層風洞中進行的不同風向角下的風洞試驗所得數據的研究,獲得了結構在各種情況下的屋面風壓分佈規律,並且繪制了臺州體育中心屋蓋在各個風向角下的屋蓋平均風壓系數和脈動風壓系數分佈等值線圖。
  9. The math model built into the distribution reliability management system of daqing oil field power system is clear, and the relation among each factor is explicit. this dissertation resolves the questions, which the calculation speediness and the node capability, and breaks through the number limitation of load - points and lines, by making use of special model method and new - found calculation thought. so it is an object - oriented computer management system, and is also a signification attempt in research of distribution system reliability assessment

    大慶油田電網可靠性管理系統所建立的數學模型清晰,各相關因素關系清楚,獨特的建模方法和全新的計算思路,突破了負荷節點數和線路條數的限制,解決了節點容量和運算速度等技術難題,是一個面向工程應用的計算機管理系統,是配電系統可靠性評估領域一個有意義的嘗試。
  10. Being basis on the 14 regional grid planning texts of historical data of hunan province, initially determining the factors that affecting power grid construction ; to reflect the distribution of information to determine the scale of construction leading indicators to assess the scale, with its own network of intelligence presented to the region to assess the scale of the distribution network - building indicators system ; establishes assessment models of evaluating 110kv distribution network building scale integrated ; considering the main factor that influencing the construction scale of the distribution network, the improvement method of 10kv distribution networks capacity - load ratio is proposed ; the combination of high voltage distribution network planning optimization technology results presented evaluation pressure distribution network building scale integrated assessment methods

    課題以湖南省14地區電網已有規劃文本歷史數據為基礎,初步確定各種影響電網建設的因素;以反映配電網建設規模的主導信息來確定規模評估指標,提出了符合自己網情的地區配電網建設規模的評估指標體系;建立了評價110kv配電網建設規模的綜合評估模型;通過研究各影響因素與負荷發展儲備系數參數的關系提出了確定10kv變電容載比的方法;結合高壓配電網規劃的優化技術成果,提出了評價中壓配電網建設規模的綜合評估方法。
  11. The effect of mud on the performence of system can be considered the mud ' s efficience obtained by the link simulation, which depends on the algorithm of the mud, and the system multiplexing factor which depends on all kinds of factors related to the radio propagation environment in the cell network system planning, for example the cell scale, channel model, the system load and the user distribution

    隨后對影響多用戶檢測效率的干擾相消效率和系統復用因子兩個因素進行了全面而深入的分析。其中前者與接收機採用的mud演算法有關,一般通過鏈路模擬得到其結果,後者主要與蜂窩系統規劃設計中各種與環境相關的因素有關,如小區尺寸、通道模型、系統負載、用戶分佈。
分享友人