fast load 中文意思是什麼

fast load 解釋
快速裝入
  • fast : adj 1 緊 (opp loose), 牢實的,堅牢的,粘得緊的,堅固的;固定的。2 忠實的,可靠的。3 耐久的;不...
  • load : n 1 裝載,擔子;負擔;工作(負荷)量。2 (車船等的)裝載量;一馱,一車,一飛機。3 【電、機】(機...
  1. In the positioning servo - system, which generally is configured by the d. c. pulse width modulator ( pwm ) velocity governing system and position servo - loop, the parameter perturbance of pwm velocity loop really exist by reason of such as the load behavior ; power voltage supply ; operating setting value, etc. 1, 2 , and it cannot be ignored. by using the identification technique to form the mathematical model of the system, authors have confirmed the facts. therefore, to design the discrete sliding mode controller ( dsmc ) of the positioning servo - system, the perturbed parameters value bounds of the pwm velocity loop, which is as the controlled plant of position servo - loop, should be accounted. consequently, the design principle of dsmc for accounting system with parameter perturbance is proposed by the authors. the proposed method can ensure the stability of system with parameter perturbance and the behavior of non - overshoot, fast precise positioning. in order to reveal the effects of the design method, the comparative research work is done by the authors. also, it has been tested in an industrial experiment, the results proved it is satisfactory

    由直流脈寬調速系統( pwm )和位置環構成的定位系統中,速度環的參數隨負載特性;電網電壓;給定工況而攝動是不容忽視的.作者通過系統辨識建模也證實了這一事實1 , 2 .因此在設計位置環的離散滑模控制時,必須針對速度環(即位置環的控制對象)的參數攝動范圍採用「對象參數攝動離散滑模控制器的設計方法」 ,以確保系統在參數攝動時的穩定性和快速、無超調、準確定位的優良動態品質.為剖析該設計方法的控制效果,本文作了對比性研究,並將該設計方法用於工業試驗中,取得了滿意的結果
  2. Static benefits are generated from peaking and valley - filling, which are further divided into capacity benefits and coal saving benefits. dynamic benefits come from its fast starting and flexible operation, including frequency regulation, synchronous condenser operation, fast coverage of steep load gradient and synchronous spinning reserve. as for the calculation of static benefits of pumped storage plant, the alternative coefficient method is normally adopted at present

    目前在抽水蓄能電站的靜態效益計算中,一般採用替代系數法,即用抽水蓄能電站的裝機容量乘以容量替代系數( 1 . 05 1 . 1 )計算抽水蓄能電站的替代容量;用抽水蓄能電站的發電量乘以電量替代系數( 1 . 05 )計算替代電站的發電量,再根據循環效率的大小計算抽水蓄能電站的燃料消耗。
  3. A fast decoupled load flow method based on fuzzy inference

    一種基於模糊推理的快速解耦潮流演算法
  4. The n3306a electronic load provides fast operation and the accurate programming and read - back needed for high - volume dc power supply test systems

    N3306a電子裝載為大容積直流電源測試系統提供快速的操作和準確編程和讀取需要。
  5. Fast - load area

    快速加載區域
  6. Fourthly, a fast back projection ( fbp ) algorithm is presented. it sloves the problem of large computational load of bp algorithm and the condition of dividing the subapterture is presented

    接著提出了一種快速後向投影演算法( fbp ) ,解決了bp演算法計算量大的問題,給出了子孔徑劃分的條件。
  7. Then the air distribution system of the above - mentioned hotel ' s multi - function - hall was simulated with fidap, and the indoor temperature and velocity under the preliminary option was calculated. under the half - load condition of small air - supply quantity and slow velocity, finds that the problem has arisen, which the cold jets fall too fast in summer and the air distributes layer upon layer in winter

    然後應用fidap對上述旅館的多功能廳空調氣流組織初步方案進行了數值模擬計算,預測了該初步方案的室內溫度、速度分佈,發現在送風量和送風速度小的半負荷工況下,會出現夏季送風時冷射流過早下降,冬季送風時氣流分層分佈的現象。
  8. With the development of the electric power system, static - state reactive power compensators ca n ' t have met the requirements of the actual production and operation, and the trend to the fast and dynamic compensation for reactive power become greater and greater. since ertan hydroplant and 500kv transmission systems in sichuan power system have been operated, many power plants of load center are forced to halt during the high - water period, because the great deal of power is transmitted to far - distance load center. thus the load center loses voltage sustentation and the level of the system stabilization is debased greatly

    四川電網的二灘水電站和500kv輸變電系統投入運行后,由於二灘水電站的大量電力遠距離輸送至負荷中心,迫使負荷中心的火電機組在豐水期大量停機,使負荷中心失去電壓支撐,大大降低了電網的電壓穩定水平;同時,因為四川電網中的無功補償裝置全為靜態無功補償電容器(或電抗器) ,這些設備只能在系統正常運行狀態下起到無功補償和電壓支撐的作用,而在電網出現事故時,不但不能起到電壓支撐作用,反而會促使電網電壓崩潰事故的發生。
  9. Table name or view name variable fast load

    「表名變量或視圖名變量快速加載」
  10. Table name or view name variable - fast load

    表名變量或視圖名變量-快速加載
  11. Data access mode table or view fast load

    數據訪問模式=表或視圖快速加載
  12. Other fast load options are stored in a comma - separated list in the

    其他快速加載選項則存儲在
  13. To learn more about fast load options, see

    若要了解快速加載選項的詳細信息,請參閱
  14. Provided more information about fast load options

    提供了有關快速加載選項的詳細信息。
  15. In addition, certain fast load options are available only in the

    另外,某些快速加載選項僅在
  16. To fail. in addition to the fast load options exposed in the

    對話框中公開的快速加載選項以外,
  17. This property is available only with the fast load option

    僅在選擇快速加載選項時,此屬性才可用。
  18. Loading double - byte character set dbcs data requires use of one of the fast load options

    請注意,雙位元組字符集( dbcs )數據需要使用一個快速加載選項。
  19. The unit coordinated control of coal - fired power plant is essential to the automatic generation control ( agc ). in order to get the fast load response characteristic and the stable main parameters that the power network dispatching center required, we must reconsider the existing unit coordinated control schemes by analyzing the specialty of the coal fired power plant

    燃煤電廠的機組協調控制是機組投入自動發電控制( agc )的基本條件,為了機組能夠迅速響應電網的負荷要求,同時保證機組各主參數保持相對的穩定,必須在進一步分析機組被控對象的特性的基礎上,重新研究現存機組協調控制方案。
  20. Data access mode table name or view name variable fast load variable name

    數據訪問模式=表名變量或視圖名變量快速加載
分享友人