first class load 中文意思是什麼

first class load 解釋
一級負荷
  • first : adj 1 最初的,最早的。2 最上等的,第一流的。3 基本的,概要的。4 高音(調)的。n 1 最初,第一;第...
  • class : n 1 階級;社會等級。2 學級;班級,年級,級,班;組;(有組織的)講習班;〈美國〉同年畢業班;【軍事...
  • load : n 1 裝載,擔子;負擔;工作(負荷)量。2 (車船等的)裝載量;一馱,一車,一飛機。3 【電、機】(機...
  1. First, we have the resource of web cluster allocated among the classes with pareto optimal method in microeconomic1 model, and have the resource load of each class controlled not to be overused. then a policy for supporting service level agreement ( sla ) is proposed to optimize the resource utility among the web hosting users who may have idle resources or lack resources

    通過採用微觀經濟模型中的pareto最優資源分配方法實現了web集群中業務類的資源分配,然後基於資源利用率來控制業務類服務質量;我們進一步提出sla經濟策略,用來對webhosting客戶資源過剩和不足的情況進行管理,目標是使服務商和客戶的利益最大化。
  2. The exportation resistance of a device work device with what link after loading the resistance s the certain connections for should satisfying, in order to prevent mount to load the appearance produce the obvious influence. with each other connect to say to electronics equipments, for example after signal connect the enlarger, ex - class to connect class, only behind first - degree importation resistance before larger than first - degree exportation resistance 5 - 10 times are above, can think the resistance to match good ; connect the box come saying, electronics tube the machine should choose to use with for the enlarger its output to carry the mark to call the resistance the box for, but transistor enlarger then have noing this restrict, can take officing why resistance of equal or approximate box

    一件器材的輸出阻抗和所連接的負載阻抗之間所應滿足的某種關系,以免接上負載后對器材本身的工作狀態產生明顯的影響。對電子設備互連來說,例如信號源連放大器,前級連后級,只要后一級的輸入阻抗大於前一級的輸出阻抗5 - 10倍以上,就可認為阻抗匹配良好對于放大器連接音箱來說,電子管機應選用與其輸出端標稱阻抗相等或接近的音箱,而晶體管放大器則無此限制,可以接任何阻抗的音箱。
  3. Because the parent class loader is always given the opportunity to load a class first, the class is loaded by the class loader nearest the root

    因為父類別類別載入器總是先得到載入類別的機會,所以類別載入器載入的類別最靠近根。
  4. Because deh system can use feedback signal of the first class pressure as practical power of turbine, it can avoid the reverse control, have the good ability of anti - disturbing. by the sophisticate control logic deh can make swift change of the control demand for following best value according to the circumstance, largely improved the dynamic characteristic when the unit sundenly discharge the full load

    Deh系統控制器中的pid系數可根據試驗情況方便的調整,實現較好的動態特性,並可使調汽門動態過開,使再熱機組有良好的一次調頻能力; deh系統可採用調節級壓力做為汽輪機實發功率的反饋信號,避免出現反調現象,抗內擾和外擾能力強。
  5. The first time value is the time taken for constructing the first reflection replacement class, which includes the time to load and initialize the classes in the framework code

    第一個時間值是構建第一個反射替代類所花費的時間,這個時間包括裝載和初始化框架代碼中的類的時間。
  6. Running the two test passes is important for a reasonably fair test - the first pass through the code is going to load all the necessary classes, which adds a lot of overhead to both the javassist and bcel class generation process

    類中的每個屬性調用一次。運行兩次測試對于測試的公正性是很重要的第一次運行代碼要裝載所有必要的類,這對于javassist和bcel類生成過程都會增加大量開銷。
  7. If class load, module load, and thread start events are ignored as they are by default, the program stops on the first executable instruction of the main thread

    如果忽略類加載、模塊加載和線程啟動事件(默認情況下如此) ,程序將在遇到主線程的第一條可執行指令時停止。
  8. If cordbg. exe is ignoring class load, module load, and thread start events as it is by default, the program stops on the first executable instruction of the main thread

    如果cordbg . exe忽略類加載、模塊加載和線程啟動事件(默認情況下如此) ,程序將在遇到主線程的第一條可執行指令時停止。
分享友人