flood height 中文意思是什麼

flood height 解釋
洪水位
  • flood : n 1 洪水,水災。2 溢流,漲水,潮水最高點,泛濫,洶涌。3 〈詩〉河,湖,海。4 充溢,豐富;大量,一...
  • height : n 1 高,高度;身高;海拔。2 〈常 pl 〉高地,山丘。3 高貴,卓越。4 絕頂,頂點;【聖經】天。5 〈罕...
  1. So this article analyses deeply in the method of ensur ' my designing food rolume which is an important element to affect the " designimy height of bridge " it brings forward an " arverage optiminmy suiting line " method which is a bondage discommode series at the same time it puts forward a ensurmy principle for rough coefficient " and " fallimy flood proportion which are both suitable to heilongjiang province at last this article introduces the " three - days rainimy rolume " method

    本文立足於黑龍江省各種河流的洪水特點,結合以往工程實際,對影響跨河橋梁設計高度的主要因素? ?設計洪水流量及其相應洪水位的確定方法加以詳細分析。提出有約束不連序系列的加權優化適線法及適合於黑龍江省的河流粗糙系數和洪水比降的確定原則,並介紹了三日降雨量法。
  2. So according to the technology regulation of reclamation engineering, hydraulic calculation must be carried out in the design of final closure. this paper firstly introduces the progression and present situation of reclamation engineering, emphasizing on the features of present reclamation and on the experiences and theories of home and abroad ; using fortran perfects the hydraulic calculation program of the closure and makes the program to meet different conditions ( such as considering flood, the variation of time interval, multi - entrance, multi - reservoir capacity ), and after comparing and analyzing a great deal of schemes, the reasonable computation scheme was brought up ; the interface of the program was carried out by the programming language vb to make the process of calculation become easier and more distinct, so the result can be analyzed and handled more directly ; vb is used in the later management of the result to plot the graphic chart of the isoline of the maximum of hydraulic element ( the velocity of flow, the drop height and the rate of flow ) automatically ; finally it was applied in the reclamation project of dongbidao of fuqing

    本文首先介紹圍海工程的發展進程與國內外圍海的開發現狀,重點介紹了我國目前圍海工程的特點及在圍海工程實踐中積累的經驗和理論;利用fortran語言完善堵口工程龍口水力計算程序,使程序可以滿足圍海工程復雜工況下(如考慮內港洪水、計算時段的變化、多口門、多庫容、多水閘)的龍口水力計算,並進行大量方案的比較和分析,提出合理計算方案;利用面向對象的可視化編程語言vb進行界面開發,使計算過程有良好的人機界面,更直觀地對計算結果進行分析和處理;計算結果的后處理採用vb編程實現龍口水力要素最大值等值線圖的繪制;並運用所編軟體對福建省福清市東壁島圍墾工程進行龍口水力計算,為堵口合龍提供科學依據。
  3. The curves of the consolidation settlement in soft clay base of flood land are gained, which compare the effect of sand drain. the settlement - time curves in different period are also gained, which increase the height of embankment to 8m, based on the test data of hang - yong highway. furthermore, the consolidation settlement characters of these entity engineering are analyzed, and, the variation rules of the rate of grade and degree of the curves in different period in the whole section, the maximal settlement and the liner regression relations between the rate of grade and degree are calculated

    本文利用大變形固結有限元分析程序( lscfea )中的小變形平面固結分析單元( sse2 ) ,結合實體工程項目進行了地基固結沉降的有限元計算,分別得出河灘相軟土地基在考慮砂井和未考慮砂井作用下的固結沉降曲線及杭甬高速公路試驗段在高堆載情況下的固結沉降曲線;並對以上曲線特徵進行了分析,得出各時間段曲線斜率、角度在整個斷面的變化規律,以及沉降最大值與斜率、角度變化之間的線性回歸關系。
  4. The hotel s five restaurants and bars serve the best in asian and western cuisine and drinks. and the hotel s newly remodeled health club features a gym, sauna, swimming pool and flood lit tennis courts. with panoramic city views as standard, the china travel service tower literally offers the height of luxury

    飯店共有372套豪華現代化的客房, 6萬多平方米的寫字間, 24小時營業的商務中心,全面的旅遊和銀行業務,四個集東西方美食精華的餐廳,酒吧,品種全的商品出售,飯店還設有各種娛樂設施。
  5. In this paper, the climatic variation features and spatial and temporal distribution of the flood and drought in zhejiang province were analyzed by using 36 monthly and seasonal station data during 1961 - 1999 observed over zhejiang province, 160 rainfall and temperature data during 1951 - 1999 observed over china, northern hemisphere 500mb height data during ! 961 - 1999, the planting and flood disasters area data in zhejiang province during 1949 - 1998. we used many method : calculated trend coefficient of rainfall and temperature, used eof, reof, ssa ( singular spectrum analysis ) and mem ( maximum entropy spectrum ) method and synoptic method. we first studied the climatic variation features of summer and autumn and characters of the flood and drought in zhejiang

    本文用1961 - 1999年浙江省36個氣象觀測站的降水量和氣溫資料、 1951 - 1999年全國160站的降水量和氣溫資料、 1961 - 1999年500hpa月平均高度資料和1949 - 1999年浙江省11個地市的受災面積、成災面積、耕地面積等資料,通過計算趨勢系數、變量場eof分解、旋轉eof分解、奇異譜分析和最大熵譜分析等多種統計學方法和天氣學方法,研究了浙江省氣候變化特點及旱澇災害時空分佈的特徵。
  6. Using monthly mean rainfall and temperature data in north - west of china ( nwc ), the characteristics of rainfall anomaly at rainy season in nwc and the inter - annual varieties of drought / flood are diagnosed by means of eof, reof and wavelet analysis et al. and the ncep / ncar monthly reanalyzed data are employed to analyse the evolution character of water vapor flux and it ' s divergence flux, 500hpa height and u, v wind field. results show that ( a ) the space distribution of rainfall anomaly can be separated into seven climate sensitive areas, the first and the third region have the same rought / flood trend

    本文使用西北(區) 168個站1961 2000年6 9月(主汛期)月平均降水、溫度資料,運用eof 、 reof 、小波分析等方法診斷了主汛期月降水異常和旱澇的年代際變化;同時利用ncep ncar月平均資料,分析了強(弱)季風年西北空中水汽通量及其散度場、 500hpa高度場、 u 、 v風場的演變特徵,結果表明: ( a )西北汛期降水可分為七個氣候異常區,第一、三異常區旱澇趨勢相同。
  7. On the basis of the result of the research on the landslide damming of river, failure of landslide dam, outburst flood and landslide surge, the failure of the part of landslide will arise a maximum surge height to 6m at the dam site, at the same time, the height of landslide dam will reach possibly 33m, and the flood peak of outburst flood will reach 15841 ~ 7613m3 / s, and make water level to rise at 11 ~ 4m through jinjiang to xiluodu of the jinsha river

    堵江潰壩及涌浪研究結果表明,局部的邊坡失穩在壩址處引起的涌浪高達6m ,並可能形成高約33m的滑坡堵江壩,潰決洪水將在金江至溪洛渡河段形成15841 7613m ~ 3 / s的洪峰流量,使得此段江水位上漲11 4m 。
  8. At last the corresponding formulae was yielded. 4. the design scheme of jiangtang lake flood - intake sluice was systematically researched, including selecting the sluice location, calculating the height of the sluice soleplate, selecting of the sluice structure and bank wall, and then the reliable proof for determining rational structure scheme was provided

    4從閘址選擇、閘底板高程確定、閘室結構和岸墻等方面,對姜唐湖進洪閘工程的設計方案進行了系統的研究,為最終確定較為合理的結構方案提供了可靠依據。
  9. We classified flood and drought years of summer and autumn, it is pointed out in the paper that there are circulation anomaly in 500mb height field before flood or drought years. we also find out that there are intimated relation between autumn floods and droughts of zhejiang province and the macro - scale rain belt. the meteorological elements emergence abnormal features in summer before flood and drought years. we make out predictor to predicate summer precipation

    論文結合三種排序方法劃分了夏秋旱澇年,研究表明,夏季、秋季旱澇年前期冬季和夏季500hpa高度場環流有明顯的異常特徵,夏秋旱澇與我國夏秋大尺度天氣氣候異常有密切的關系,旱澇前期我國氣象要素場有明顯的異常特徵。製作了浙江省夏季旱、澇預報工具。
  10. Having experienced many vicissitudes of life for a century, the bigleaf banyan with a stalk 6 meters in girth displays its outside roots ( 0. 5 meters height and 4 meters length ) which look like flood dragons with scales on skin sporting under the tree

    位於紀念堂南門至主體建築之間的西側園道邊,歷盡滄桑的大葉榕胸莖周長6米,地根外露形成一景(外露的根莖高0 . 5米,根長4米) ,有脊有鱗,宛如蛟龍游戲于樹下。
分享友人