flood hole 中文意思是什麼

flood hole 解釋
流水孔
  • flood : n 1 洪水,水災。2 溢流,漲水,潮水最高點,泛濫,洶涌。3 〈詩〉河,湖,海。4 充溢,豐富;大量,一...
  • hole : n 1 洞,穴,孔;(衣服等上的)破洞;傷口;漏洞;窩,坑;水流的深凹處,(河道的)緩流窪。2 (獸的...
  1. The stress condition ; overall stability ; effect of filling gravels into the hole of the block of the precast concrete interlocking blocks in the water flow during the flood period as well as the resistance parameters of the blocks are studied through experimental simulation ; in which a comprehensive analysis is made on the mechanical stability and the anti - erosion properties of the blocks, and then the requirement and the safety degree of the gravel filling are given

    摘要通過試驗模擬研究了預制混凝土連鎖塊在洪水期水流中的受力狀況、整體穩定性、孔內填充碎石的作用及連鎖塊阻力參數,綜合分析了連鎖塊結構的力學穩定性和抗沖性,給出了碎石填充的要求及安全度。
  2. Bottom hole layout of flood discharing and sediment flushing and application of silicon powder concrete in baishi reservoir

    白石水庫泄洪排沙底孔布置及硅粉混凝土應用
  3. All negative landforms, which are shaped by flood - dominated current, such as souring hole, scouring channel and flood channel, are belong to the study area of flood channels

    通過以上的研究認為河口漲潮槽的概念應該有更為廣泛的含義,包括河口一切由漲潮流作用為主形成的負地形,如漲潮沖刷坑,漲潮沖刷槽和漲潮水道等,漲潮槽的特徵應該保持多年。
  4. ( 5 ) according to the calculated average section velocity. we can decide the type of the revetment. ( 6 ) when the scour hole depth of the dam head and trail parts is calculated inthe paper. we can validate whether the revetment material is strong enough to resist the degradation of the flood flow

    根據以上計算所得的各斷面平均流速,初步確定需要鋪設的摘要護面類型計算在鋪設護面以後壩首和壩末的沖坑深度,以驗證護面材料是否可以抵抗洪水泄流的沖刷。
分享友人