flood control project 中文意思是什麼

flood control project 解釋
防洪工程
  • flood : n 1 洪水,水災。2 溢流,漲水,潮水最高點,泛濫,洶涌。3 〈詩〉河,湖,海。4 充溢,豐富;大量,一...
  • control : n 1 支配,管理,管制,統制,控制;監督。2 抑制(力);壓制,節制,拘束;【農業】防治。3 檢查;核...
  • project : vt 1 投擲,拋出;發射(炮彈等);噴射。2 使突出,使凸出。3 設計,規劃,計劃,打算,籌劃。4 投影;...
  1. Character of flood control and project plan in

    衛星灌區的防洪特點與防洪工程規劃
  2. Application of gps in surveying of flood control project

    在防洪工程測量中的應用
  3. Application of geomembrane in flood control project

    在防洪工程中的應用
  4. Application of the art of anti - seepage wall by jet cement with high pressure in flood control project

    高壓噴射注漿法在公路工程施工中的應用
  5. For the low water head water control project at a branching channel, its flood discharge capacity is related not only with the total discharge width but also with the discharge width ratio of the two branches

    摘要位於分汊河段的低水頭樞紐,其泄洪能力不僅與樞紐的總泄流寬度有關,而且與兩汊泄流寬度之比有關。
  6. Flood control during construction period at zipingpu water conservancy project

    紫坪鋪水利樞紐工程施工期防汛工作淺析
  7. Hydrology regime and river channel evolution become complex because of double influences of river flow and tide. there is little appropriate method so far. therefore, when the impact us assessed of water project on flood control, the following aspects should be focused on, river evolution and stability of project - sections, design tidal level, flood - tide combination scheme, pre - project and post - project impacts on river channel, water level and flow condition

    長江河口段為潮流河段,徑流潮流的雙重作用使得區域水文情勢、河道演變規律錯綜復雜,開展防洪影響評價研究時,河道演變及工程段穩定性分析,設計潮位的分析計算,洪潮組合方案擬定,工程前後對河道及水位流態影響的模擬等均是目前尚無十分成熟的方法,需要進一步研究的課題。
  8. By the turn of the century. the design of various flood control schemes for the river indus is progressing with completion dates to tie in with the shenzhen river regulation project so as to relieve the risk of flooding by 2002

    多項梧桐河防洪計劃的設計工作正在進行,預計完工日期可配合深圳河治理工程,目的是在二零零二年或之前,可減低發生水浸的危險。
  9. Protection against flooding is being improved in the area. the construction works for some of the flood control schemes for the river indus are progressing with completion dates to tie in with the shenzhen river regulation project so as to relieve the risk of flooding by 2002

    梧桐河防洪計劃多項工程正進行得如火如荼,竣工日期均已訂出,務使工程與深圳河治理工程配合,以期在二零零二年或之前減低水浸風險。
  10. Abstract : variation of flow condition caused by the multi - pur pose regulation schemes has been investigated on the basis of measured date in r iver model. flood - control of the upper river, operation of the power - station, saf ety of the bridge and power - station, navigation and evolution of the river are a nalyzed. a reasonable and feasible project alternative and the improvement measur ement are proposed

    文摘:涪江潼南河段防洪整治是一項以防洪為主體的綜合性河岸整治工程,在平面二維數值模擬計算的基礎上再進行河工模型試驗,比較分析各防洪整治方案下潼南河段水流條件的變化,及其對上游防洪、河道、大橋、電站、航運、河勢的影響,提出合理可行的工程方案
  11. Abstract : by analyzing the changes of incoming water and sediment in the lower weihe river, in allusion to the question of flood discharge capacity being not enough, control project being short, river pattern can ? t being controlled and the management being loose etc, advise to increase the investment, consummate the measures of flood prevention engineering and non - engineering. strengthen the management, consolidate the consciousness of flood prevention and disaster alleviation, in order to raise recent ability of flood prevention in the lower weihe river

    文摘:通過對渭河下游來水來沙變化的分析,針對現狀堤防過洪能力不足、控導工程少、河勢得不到控制和管理工程等方面存在的問題,提出應加大投入力度,完善防洪工程措施和非工程措施,加強管理,強化防洪減災意識,提高近期渭河下游防洪能力。
  12. Application of vibration percussion in treatment of the foundation of flood control emergency project in liao river

    振沖法在遼干防洪應急工程壩基處理中的應用
  13. In order to analyze side flow of one dimension river flow, the iterative method that comes from control equation system is introduced and applied to the project examples. the results show this method is practicable and is important role in flood control system computation. this method could apply to the inflow computation on large reservoir prevent and control flood

    對于旁側入流反分析,採用直接從控制方程出發,推導出同時求解旁側入流的迭代方法,從正問題解的反求,以及實測水庫入庫洪水的反求等實例都說明,本文的方法是一種實用的方法,該方法對水庫防洪調度洪水演算具有重要的價值,可以應用於大中型水庫洪水調度的入流反算。
  14. The dissertation focus on the main conflict of flow and sediment change, by analyzing the flow and sediment features, and change in rivercourse of typical period in histry, collecting the data of riverbed change. according to the flow and sediment change condition, combining the existed water works, and based on the results of former researches, the study are conducted on the law of flow state change by comparing rivercourse conditions before and after the completion of sanmenxia project, which may provide some idea for flow state change when xiaolangdi project completed and put into operation and some basic clue for the prediction of variation trend of river section from tiexie to shendi, from shendi to tieqiao near zhengzhou, from tieqiao near zhengzhou to dongbatou, from dongbatou to gaocun and so on in the year 2010 and the period 2010 to 2020. the result may provide some reference for flood control of these wangdering river sections, and some guidelines for planning of water projects and arrangement of project sequence

    本課題緊緊抓住小浪底水庫運用后水沙變化這一主要矛盾,通過分析研究以往典型時期的水沙特點和河道演變特點,收集分析河床邊界條件變化資料,小浪底水庫運用后水沙資料變化,結合現有河道整治工程建設情況,總結前人的研究成果,重點研究三門峽水庫運用後下遊河道河勢變化的規律和特點,探索小浪底水庫運用後下遊河勢變化情況,分析預測游蕩性河道鐵謝至神堤、神堤至鄭州鐵橋、鄭州鐵橋至東壩頭、東壩頭至高村等各個河段在2010年, 2010年至2020年期間的河勢變化趨勢,為分析游蕩性河段的防洪形勢,指導河道整治工程建設的規劃和工程安排提供決策參考和依據。
  15. Combined with the existing problems of the national key project - linhuaigang flood - control project, this paper systematically studied the theories of sluice structures design foundation model modern calculation methods of both plane and spatial sluice structures ; at the same time, static and dynamic analysis of he spatial structure of the jiang tang lake ' s flood - entry sluice was studied using the finite element method

    本論文結合國家重點水利工程臨淮崗洪水控制工程中遇到的實際問題,系統地研究了水閘結構的設計理論、地基模型、平面和空間水閘結構的現代計算方法;並對姜塘湖進洪閘空間結構進行了有限元靜動力計算分析。
  16. When the construction project is to be put into operation or use, their flood control works should pass the acceptance by the water conservancy administrative department

    建設項目投入生產或者使用時,其防洪工程設施應當經水行政主管部門驗收。
  17. Comments on free - board of levees of flood control project in urban areas

    城市軌道交通網路規劃決策系統研究
  18. Supervision practice in construction of urban flood control project of jiujiang city

    九江城市防洪工程建設監理實踐
  19. Application of geomenbrane to vertical seepage control of liaohe river flood control project

    土工膜在遼河防洪工程垂直防滲中的應用
  20. Application of reinforced concrete slope protection in flood control project of dalinghe river in chaoyang city

    鋼筋混凝土護坡在大凌河朝陽防洪工程中的應用
分享友人