footbridge 中文意思是什麼

footbridge 解釋
人行小橋。

  1. Lcq15 : extension works of pedestrian footbridge system in mong kok

    立法會十五題:旺角行人天橋系統伸延工程
  2. Right : looking down the yarra river towards the yarra footbridge with flinders walk and the city on the right

    右:在耶那河上向耶那人行橋和弗林德斯道望去,城市在河的右側。
  3. Footbridge linking kwun tong road and tsun yip lane

    連接觀塘道和駿業里的行人天橋
  4. The footbridge over the river is no longer in use

    河上的人行橋已不再使用了。
  5. Footbridge along connaught road central and vicinity

    沿干諾道中的行人天橋及附近一帶
  6. Passengers must cross the line by the footbridge

    旅客必須由天橋穿過馬路。
  7. Tenders invited for footbridge at kai cheung road

    招標承建橫跨啟祥道天橋
  8. Long ping footbridge outside west rail station

    西鐵朗屏站外的行人天橋
  9. Public footbridge linking wu king estate and siu hei court

    連接湖景與兆禧苑的公眾行人天橋
  10. " general view of footbridge b northern portion

    行人天橋b的北段概覽
  11. At that time, the at - grade crossing currently below the footbridge will be closed. in addition, the footbridge north of the tin wah roadtin shui road junction connecting tin yan estate and phase 2 of chung fu shopping centre was opened for public use on 1 september

    有關工程進度理想,預期該橋在九月底可重新開放供居民使用,而現時位於該處橋底的臨時路面行人過路處,則將在南橋開放后停止使用。
  12. New footbridge at pedder street, central

    中區畢打街的新行人天橋
  13. Unlit footbridge subway lighting

    行人橋隧道照明問題
  14. During the temporary closure of the footbridge, kcrc has installed a temporary at - grade pedestrian crossing under the existing footbridge at tin shui road

    在行人橋暫封期間,九鐵已於天瑞路近現有行人橋底設置臨時的路面行人過路處。
  15. A footbridge at the south side of the station crosses chap wai kon street and connects to an elevated walkway system leading to prima villa and yu tsui court

    車站南面興建的一條行人天橋,橫越插桅桿街,連接欣廷軒及愉翠苑的高架行人系統。
  16. Active progress is also being made to enable the supply of conditioned air to the lo wu footbridge

    此外,在羅湖橋加設空調系統的工程亦進行得如火如荼。
  17. From two international finance centre through the footbridge and the covered walkway in man kwong street

    由國際金融中心第二期經行人天橋及民光街的有蓋行人路。
  18. The footbridge linking the tuen mun town park and trend plaza has been demolished and a temporary replacement footbridge opened on 4 march 2002. piling works near pui to light rail stop are now underway. track diversion works will be implemented later

    至於其他路段,現正進行壓土工程,預期於六月底前壓土工程可全部完成,而車站及路軌工程將于壓土工程完成後,陸續開始施工。
  19. Providing emergency maintenance services on traffic signals, footbridge and subway lighting ; and

    為有關交通燈行人天橋行人隧道照明設備的故障提供緊急服務
  20. The streets around sai wan ho market including tai on street and a section of shaukeiwan road in front of tai on building ; the vicinity of quarry bay market including quarry bay footbridge, a section of king s road between finnie street and hong on street and outside jusco area

    西灣河街市四周的街道包括太安街和太安樓對出的一段筲箕灣道魚涌街市附近一帶包括魚涌行人天橋介乎芬尼街與康安街的一段英皇道,以及吉之島對開地方
分享友人