  1. Since its foundation, this institute has completed 3800 or more projects of exploration and design of which projects of priority are fengpu, lupu bridges, i, ii, iii stages of comprehensive sewage treatment, inner, middle, outer ring roadways, yan an dong lu viaduct ( east and middle sections ), main entrance roadway and graded crossing in pudong international airport, first and second stages of humin viaduct, expressways ( hujia, huqingping, hulu, jialiu, xinfengjin ) and chongming cross river projects, r3 and m7 light rail projects both situated in city proper or suburban area

    自創建以來,完成了各類工程勘察設計項目3800餘項,其中已完成或正在進行的項目有:上海市奉浦大橋、盧浦大橋、污水治理一二三期工程、 (內、中、外)環線道路、延安高架道路(東、中、西段) 、浦東國際機場航站區主進場道路及航站區立交、滬閔高架道路一、二期、 (滬嘉、滬青平、滬蘆、嘉瀏、莘奉金等)高速公路、崇明越江通道、軌道交通r3線、 m7線等工程。
  2. We rounded analysis that ring stator ’ size parameter how to affect ring stator ’ characteristic frequency by use the software for numeric analysis, and afford theoretical foundation for the optimum design of ultrasonic motor ’ structural parameter

    本文還利用分析軟體,全面地分析了定子圓環各個尺寸參數對特徵頻率的影響,為超聲波電機結構參數的優化設計提供了理論依據。
  3. Researches on ring beam retaining structure of deep foundation pit by spacial analytical method

    深基坑環梁支護結構空間分析方法的研究
  4. The factors affecting the spatial effects of the deep foundation pit are researched in detail with the mutual deformation analysis method. these factors include the plane dimensions of pit, ring beam, middle beams, corner braces, embedded depth and brace stiffness. the results are compared with those of two - dimensional analysis, and their differences and adaptability are clarified

    此外,本文還利用共同變形分析方法,對影響深基坑空間效應的諸多因素(包括基坑的平面尺寸效應、圈樑和腰梁效應、角撐效應、樁身插入深度和支撐剛度等)進行了深入探討,並與目前常用的平面分析方法做了比較,指出了兩者的區別及其適用性。
  5. Ring beam may control the top displacement of piles validly. it has affect on keeping buildings stabling around foundation pit

    圈樑可以有效地控制樁頂位移,可以起到維持基坑周圍建築物穩定的作用。
  6. In order to improve the quality of the voltage signals, this paper has adopted the scheme of three phases and six organs in signal - generator part, which can eliminate the errors caused by the assembly warp and the zero shift of organs. this paper also has analyzed the distribution and varying rules of the magnetic field in the signal - generator part, then based on the conclusion of the analysis improved the structure of signal - generator, which could completely eliminate the noise signal caused by the roughness of the face on the magnetic steel ring. the improvement not only met the requirement of this study, but established the theory foundation for the super - high precision magnetic encoder in future research

    因此,為提高原始電壓信號的質量,本文採用三相六元件的信號發生方案,通過差分處理濾除了由於裝配偏差和零點漂移帶來的信號誤差;本文對編碼器信號發生結構進行了磁場分析,依據磁場分析的結論對編碼器常用的信號發生結構進行了改進,改進后的結構利用積分原理在理論上能夠完全消除信號中由磁鋼環表面粗糙度引起的信號噪聲,進一步提高了信號質量,此結構不僅滿足了本課題的需要,而且為今後研製超高精度的磁電式編碼器奠定了理論基礎。
  7. Based on comparison of several technical schemes, the method of sand bedding pre - elevating and step water - filling pre - compressing is adopted. so the dissertation is consist of two parts : ( 1 ) the applicability study for the method of sand bedding pre - elevating and step water - filling pre - compressing, including numerical analyses for the thickness of sand bedding, the consolidation, settlement and stability of foundation, drainage, possibility of foundation liquefaction under seismic loading, et al. ( 2 ) monitoring at construction stage and checking the effect of foundation treatment, including the measurements of the settlement velocity and non - uniform settlement of ring beam under the tank, pore pressures and horizontal displacements in foundation, the pressure distribution at the bottom of oil tank and the strength increase of soils

    通過多種技術方案比較,最終選擇了技術先進的砂墊層預抬高分級充水預壓法,論文工作主要由以下兩部分組成: ( 1 )砂墊層預抬高分級充水預壓法的適用性研究,其中包括砂墊層厚度、地基沉降與固結度、地基穩定性、降水、地震作用下砂土液化的可能性等方面的計算分析; ( 2 )施工監測與地基處理效果檢驗,其中包括油罐環梁基礎沉降速率與不均勻沉降程度、各分級充水加載階段地基超靜孔壓與深層水平位移、油罐底板壓力分佈及地基土強度增長等方面的實測與數據分析。
  8. The state, distribution and value of the earth pressure acted on the retaining structures, which are the key factors that affect the deformation and stability of the deep foundation pit, are determined with the actual displacement caused by the interactions and mutual deformations of the retaining structures, ring beams, middle beams and the foundation soil without any hypotheses

    根據基坑開挖過程中支護結構、圈樑、腰梁和地基相互作用及共同變形所產生的實際位移方向及其大小來確定影響基坑變形和穩定的關鍵因素? ?作用在支護結構兩側土壓力的狀態、分佈形式和數值大小,而不對其作任何預先假定。
  9. On the basis of the sufficient consideration of the interactions and mutual deformations among retaining structures, brace structures, ring beam, middle beams and foundation soil in the deep foundation pit system, the spatial mutual deformation analysis method for the deformation and stability analysis of deep foundation pit is proposed with the finite element method

    在充分考慮深基坑支護體系中支護結構、支撐結構、圈樑、腰梁和地基相互作用及共同變形的基礎上,本文利用有限單元法,首先建立了深基坑變形和穩定分析的空間共同變形正分析方法。
  10. All the pile foundation projects of jilin yinmahe bridge, changchun ring freeway crossing bridge, haerbin - dalian line dongliaohe bridge and changtu highway bridge etc, designed and constructed by jilin geological prospecting institute, have won the high opinion for its rapid and high quality construction, the geological survey for many projects such as teachers ' high - rise residence building for changchun jiefangda road primary school, and dalian binhaiyinyue hotel etc, and the engineering survey for jilin television transmitting tower, hawaii hotel, zhongma building and fangzhi building etc projects have won the high opinion

    承擔施工的吉林省飲馬河大橋、長春環城高速公路立交橋、哈大線東遼河大橋及昌圖公路大橋等工程的樁基礎工程均以快速優質的施工受到好評,承擔施工的長春市解放大路小學教師高層住宅樓、大連濱海音樂渡假賓館等多項工程的勘察項目以及吉林電視臺發射塔、夏威夷大酒店、中馬大廈和紡織大廈等工程勘察項目均受到委託方贊譽。
  11. Discussion on pile foundation construction in karst area of guangzhou west 2nd ring expressway

    廣州西二環巖溶地段樁基施工技術方法探討
  12. It is on condition of the retaining and protecting piles imitated by nylon sticks, the top ring beam imitated by steel board, the foundation wadded by sandy soil, and the sectional size and extra load changed

    本文試驗是以尼龍棒模擬支護樁,以扁鋼模擬樁項圈樑,採用砂土填築地基,通過變換圈樑的截面尺寸及堆載進行了八組試驗。
  13. This paper is a part of the research project named the static and dynamic characteristic research of the radial - thrust floating ring hybrid bearing which is supported by the natural science and technology research foundation of the nation

    本文完成的工作是國家自然科學基金項目「徑向?推力聯合浮環動靜壓軸承靜、動特性研究」中的一部分。
  14. Deformation of the foundation is analyzed by using the in - situ data of the settlement of the oil tank ' s cone and the ring beam, and by considering the relationship between the settlement and displacement of the ring beam and foundation

    根據現場油罐錐面和環梁沉降觀測資料,以及環梁沉降與地基土沉降和位移的關系,分析了油罐地基土體的變形。