ground bridge 中文意思是什麼

ground bridge 解釋
(沼地上)木棒鋪成的路。

  • ground : adj 碾碎了的,磨過的,磨成粉的。 ground and polished piston 【機械工程】研磨活塞。n 1 地,地面;...
  • bridge : n 1 橋,橋梁;【造船】艦橋,船橋。2 鼻樑;(假牙上的)齒橋;【音樂】弦柱,弦馬;【電學】電橋;【...
  1. Application for communication system between air vehicle and ground based on wireless bridge

    無線網橋在空中運動體與地面通訊系統中的應用
  2. Erection of segmental bridge decks by ground support method cpr - 2

    運用施工架興建中的高架橋
  3. So far, there has existed several kinds of theory of ground fault protection for field winding of generator. in these methods, pingpong bridge field ground protection is a simple and effective one

    目前已有多種原理的發電機勵磁迴路接地保護,其中乒乓式勵磁迴路接地保護是一種簡單有效的保護原理。
  4. Aircraft ground equipment - passenger boarding bridge or transfer vehicle - requirements for interface with aircraft doors

    飛機地面設備.乘客登機橋或運輸工具.與飛機艙門介面的要求
  5. The major diameter filling pile drilling machine of qj250 - 1 type applies to major diameter bridge pier hole of various geologic conditions such as ravelly ground, clay loam layer, sandy gravel, breaking layer and lithosphere as well as other various major diameter pore forming construction

    1型大直徑灌注樁鉆孔機適用於鬆散地層、粘泥層、砂礫層、破碎層和巖石層等多種地質條件的大直徑橋樁孔,以及其它各種大直徑成孔施工。
  6. Construction technique for treatment fossil landslide on duimen bridge natural ground in chongqing - huaihua railway

    渝懷鐵路對門坡大橋天然地基古滑坡整治施工技術
  7. Application of gravel piles for ground stabilization of transition zone between subgrade and bridge on qinhuangdo - shenyan occupation railway of passenger train

    碎石樁在秦沈客運專線加固路橋過渡段基礎中的應用
  8. The highest bridge in the world measured by distance from deck to ground level remains the royal gorge bridge in colorado, us which is 320 metres 1, 053 feet above the river arkansas

    如果按照從橋面到地面的距離來算,世界上最高的橋仍然是橫跨阿肯色河之上,高320米1053英尺的美國科羅拉多州皇家峽谷大橋。
  9. Distribute in natural situation and scenery, scenic spot divide pairs of bridge ditch, long level ground ditch and sea sub ditch 3 scenic spots into

    按自然形勢和景色分佈,風景區劃分?雙橋溝長坪溝和海子溝3個風景區。
  10. Hydraulic pile hammer is one of the pile driving machines that drive prefabricated piles into the ground in the construction of pile foundation such as construction, bridge, dock, etc. with the development of science and technology, the prefabricated pile driving machines evolve from block hammer, steam - hammer, diesel hammer to hydraulic hammer. hydraulic pile hammer is one of ideal prefabricated pile driving machines because it can adjust stress waveform, decrease stress peak value, prolong effectual action when it drives piles. hydraulic pile hammer is used widely and formed series in developed countries now

    液壓打樁錘是用於建築、橋梁、碼頭等樁基礎施工中打入預制樁的樁工機械。隨著科學技術的進步,預制樁施工機械由落錘、汽錘、柴油錘,發展到了液壓打樁錘。用液壓打樁錘打樁,可以調整撞擊應力波波形,減小應力峰值,延長有效作用時間,是一種比較理想的預制樁施工機械,目前在發達國家已被廣泛使用,並形成了系列化。
  11. First, the field test of soft ground at the jialichen bridge - head on the highway from luqiao to zeguo was performed and the observation results of test site were analyzed

    首先,對路橋至澤國一級公路浹里陳大橋橋頭軟基進行現場試驗研究,對試驗段的各項監測與試驗成果進行了分析。
  12. The collapsible loess is often met during the construction of the high - grade highway in the loess area, and the main failure is the uneven subsidence of the roadbed and the culvert, which affects the safe usage of the roadbed and the culvert, etc. directed against this, based on the chankou - lanzhou freeway construction, the paper analyzes the application of the composite ground formed by lime - soil pile under the bridge and designs the project, discusses the rules of the contact pressure, the stress ratio of the pile and the soil, compares the p - s curves of one pile, the composite ground formed by one pile and the composite ground formed by two piles based on the in - situ plate loading test, evaluates the bearing capacity of the composite ground of the project

    黃土地區的高等級公路建設中經常遇到濕陷性黃土問題,其病害類型主要是地基土受水浸濕后引起路基、橋臺、涵洞等的不均勻沉降,直接影響路基、構造物等的正常使用。針對此問題,本文依託甘肅讒口至蘭州柳溝河高速公路建設工程,對橋基灰土樁復合地基應用的可行性進行了深入分析,根據具體工程進行了合理的設計與計算,並配合現場靜載荷試驗及壓力盒實測數據,探討了基底應力分佈規律,樁土應力比,變形模量的變化關系,對比分析了單樁、單樁復合和雙樁復合的p ? s關系,對橋基灰土樁復合地基承載力進行了整體評價。
  13. Be opposite this of 1992 cloth " labor law " revise share 44, new after revising " labor law " have the following characteristic : suited to build the real case that realizes formal diversity with the adjustment that develops structure of system of socialist market economy, economy, state ownership already, highlight again was aimed at increasingly complex and changeful working relationship ; the maintenance that highlighted labour union function, made clear workers congress system and collective contract system shift of power of these two main thought, aggrandizement labour union organizes construction, organize broad worker in labour union to provided legal basis and safeguard for utmost ground ; increased the protective strength to labour union cadre, aggrandizement specific safeguard, make labour union cadre ok more the function that fulfils his duty to fulfill labour union responsibly ; protected labour union to produce bridge and bond effect better, fulfilled labour union to share politics, economy, culture and the approach that the society lives, made clear the essential mechanism that labor of labour union mediate concerns ; those who made clear union funds capture range, aggrandizement of union funds capture strength, ensured labour union to organize the necessary material base that develops function of labour union of activity, implementation lawfully ; set legal liability, made clear the punishment to violating principal part, enhanced law to deter force

    這次對1992布的《工會法》的修改共有四十四條,新修改後的《工會法》有以下特點:既適應了建立和發展社會主義市場經濟體制、經濟結構的調整、公有制實現形式多元化的實際情況,又突出針對了日益復雜多變的勞動關系;突出了工會的維護職能,明確了職工代表大會制度和集體合同制度這兩個主要維權手段,強化了工會組織建設,為最大限度地把廣大職工組織到工會中來提供了法律依據和保障;加大了對工會幹部的保護力度,強化了具體保護措施,使工會幹部可以更加盡職盡責地履行工會的職能;更好地保護了工會發揮橋梁和紐帶作用,落實了工會參與政治、經濟、文化和社會生活的途徑,明確了工會調處勞動關系的根本機制;明確了工會經費的收繳范圍,強化了工會經費的收繳力度,保障了工會組織依法開展活動、實現工會職能的必要物質基礎;規定了法律責任,明確了對違法主體的處罰,增強了法律威懾力。
  14. Learened from the construction of composite ground for subgrade and transition zone between subgrade and bridge qinhuangdao - shenyang passenger special line a12 a13 section

    13標路基及路橋過渡段復合地基施工體會
  15. Result shows : the vibration of vehicle is mainly relevant to velocity and uneven path. the higher the velocity is, the more uneven the path is, the more violent the vibration of vehicle is ; comparing dynamical response of middle bridge stride on vehicle passing bridge and on equivalent moving loads, the displacement is same but the velocity and the acceleration are different ; the result of velocity and acceleration of vehicle is big over the ground path than over the same path of bridge

    結果表明:車輛的振動主要和車速及軌道不平順有關,車速越高,軌道越不平順,車輛振動的就越劇烈;車過橋時橋梁跨中動力響應與等效移動荷載作用下橋梁跨中動力響應比較,橋梁跨中的位移基本相近,速度和加速度則不同,等效移動荷載作用情況下的數值比較大;車輛過地面軌道不平順時的速度、加速度比車輛過橋上同樣軌道不平順時的數值大。
  16. In this paper, based on the static - load tests of tension piles in soft ground lying on the province of zhejiang such as zhongshan garden, gongchen bridge canal piazza, etc, the calculations of ascending displacement, developing mechanism of the side friction and utmost bearing capacity of the tension piles are studied

    本文以中山花園、拱宸橋運河廣場等浙江軟土地區抗拔樁靜載試驗為背景,對抗拔樁抗拔承載力計算、上拔量計算、抗拔樁側阻發展機理進行了分析研究。
  17. To solve horizontal thrust at arch feet and rheological change in soft soil is the first problem for arch bridge construction on soft soil ground

    在軟土地基上建造拱橋首先要解決拱腳處的水平推力以及軟土地基的流變問題。
  18. Shuan - xin residential building invested by rebar group is located at the head of the chung ho xiu - lang bridge. the building is 34 stories high upper ground and 5 stories underground with a total construction area of 70, 233. 71 m2

    力霸集團投資興建之雙星住宅大廈,位於中和秀朗橋頭,望山面水,視野壯闊,該大廈地下五層,地上三十四層,總建築面積70 , 233
  19. Shuan - xin residential building invested by rebar group is located at the head of the chung ho xiu - lang bridge. the building is 34 stories high upper ground and 5 stories underground with a total construction area of 70, 233. 71 m2. it has a total of 5 buildings with 642 households

    力霸集團投資興建之雙星住宅大廈,位於中和秀朗橋頭,望山面水,視野壯闊,該大廈地下五層,地上三十四層,總建築面積70 , 233 . 71 ,共5棟642戶。
  20. Abstract : large transmission main pipe line engineering, treated foundation on deep muddy, thick backfilling ground is introduced in this paper, cement mixed combined earth foundation is designed and calculated, pipe bridge 、 pipe pass through dam and etc, technical measures are also introduced

    文摘:本文介紹深淤泥厚填土場地大型輸水干管工程的地基處理,水泥攪拌樁復合地基基礎設計與計算及過橋管、過堤管等的技術處理措施。
分享友人