ground floor construction 中文意思是什麼

ground floor construction 解釋
底層地面構造
  • ground : adj 碾碎了的,磨過的,磨成粉的。 ground and polished piston 【機械工程】研磨活塞。n 1 地,地面;...
  • floor : n 1 地板,地面。2 (樓房的)層。3 (船底的)肋板。4 (海洋、山洞等的)底。5 議員席;經紀人席。6 ...
  • construction : n 1 建築,結構,構造,架設,鋪設;建設;設計;工程;建築法,構造法,建築物;【戲劇】搭置,布景,...
  1. The internal and classic style is cultured and stylish with hall of the modern construction mutually blends. the lights very shines on the ground. the frone desk on the first floor provides exprese and high effciency check in and in quires service for you

    文怡酒店是一間由明師設計精心打造的四星級酒店,時尚高雅的分格與先進的配套設施,專業的管理和無微不至的服務,讓你倍感舒適。
  2. This paper put forward some conception designs for the ground floor room from three aspects of building layout, single building design and construction design. it is hopeful to give designer and building standard organizers references

    本文著重從建築群體布置、單體設計、局部構造措施方面提出對寒冷地區住宅底層室內環境的改善方案供設計人員和規范編制人員參考。
  3. With the traditional way of constructing floor or ground, if the ingredient material component can be improved, and if the construction method can be increased, a good result can also be obtained

    摘要在傳統樓地面的做法中,如果能在組分材料上加以改進,在施工方法上加以完善,同樣能收到很好的效果。
  4. The construction work was completed in around 1931. the ground floor of the building was occupied by a chinese bone - setting medicine shop named " lui seng chun ", while the upper floors became living quarters for the members of lui s family

    建築物約於一九三一年落成,底層為一間名為雷生春的跌打藥店,其上各層則用作雷氏家庭成員的住所。
  5. All the tasks required to lay a foundation must be completed before construction of the ground floor begins

    在鋪設地板之前,修建地基必需的所有任務都應該完成。
  6. Design and construction for side shoring of deep foundation pit for five layer ground floor

    土釘支護深基坑工程的施工監測及事故分析
  7. Code for construction and acceptance of ground and floor engineering

    建築地面工程施工及驗收規范
  8. Construction operation specification for ground and floor engineering

    地面與樓面工程施工操作規程
  9. Best known is his " slipform " method of construction, which enables one high - rise floor to be erected every three days. his 2x350mw coal - fired shajiao b power station in guangdong set a world record of sending the first electricity in month 22 after ground - breaking - a feat that earned the company the british construction award of 1988

    他以滑模的施工技術聞名,能夠每三日加建一層樓。他僅僅花了二十二個月便在廣東省建成了2x35萬千瓦的沙角b發電廠,用煤發電,並隨即開始供電,打破了世界紀錄,更贏得一九八八年的英國建築獎。
分享友人