hanging wall 中文意思是什麼

hanging wall 解釋
【礦物】上盤,頂板。

  • hanging : n 1 懸掛,懸吊。2 弔死,絞刑。3 〈 pl 〉 懸掛物(如簾子,帷帳,壁紙;工作吊架等)。4 斜坡,傾斜。...
  • wall : n 1 墻壁;(石、磚等的)圍墻;城墻。2 (形狀、用途)像墻壁的東西,障壁;土堤,堤防。3 (礦井、容...
  1. At present the main products of company have : courtyard the light, ceiling lamp, last light, foot of a wall the the lights, light not under water, ceiling lamp, hanging overhead light, half a ceiling lamp, wall lamp, light, desk lamp, desk lamp, floor lamp, energy - conservation light, emergency light, sodium light, mirror headlight, putting out mosquito s light, searchlight, dampproof light, street lamp, wooden light, crystal light, shot - light, cow hide light, sheepskin light, cloud stone light, stone skill light, copper light, shelf light, etc.

    大至酒店賓館的燈飾照明工程,小到家庭裝飾的照明燈具。目前公司主要燈飾系列產品有:庭院燈吸頂燈地插燈墻腳燈水下燈吊燈吊頂燈半吊燈壁燈燈臺燈桌燈落地燈節能燈應急燈鈉燈鏡前燈滅蚊燈探照燈防潮燈路燈木燈水晶燈射燈牛皮燈羊皮燈雲石燈石藝燈銅燈架子燈等。
  2. Sxotf is recognized in the northern qaidam based on the analysis of structures of area. this oblique trusting fault zone with northwestern - southeastern trending consists of fault gouge, fault breccia and fault cleavage. fault hanging wall consists of sertengshan - xitieshan napple, which is distribution in dextral en echelon. fault footwall consists of youcangshan formation in neogene

    本文在對賽什騰? ?錫鐵山斜沖斷裂詳細地段構造解析的基礎上,結合盆地的沉積特徵、地球物理資料等對該斜沖斷裂的幾何學、運動學及形成時代進行了研究,論文著重探討了賽什騰? ?錫鐵山斜沖斷裂的地質意義。
  3. The results of 2 - d resistivity inversion of the yishui - tangtou and the liujazhuang faults indicate that electrical structures on both sides of the fault zone present obvious difference, the resistivity of the hanging wall is low and partially high, while that of the foot wall is high, and the faults are high - obliquity faults

    沂水湯頭斷裂、劉家莊斷裂的二維電阻率反演結果表明,斷裂帶兩側的電性結構呈現出整體性的差異,正斷層的上盤為低阻區和局部高、低阻擾動區;而斷層下盤多為均勻的高阻區;斷層為高角度斷層。
  4. The hanging wall block is relatively little disturbed, but the ore zone beneath bears abundant evidence of tangential movements.

    上盤巖塊相對地變動不大,而其下的礦石帶卻具有許多切線運動的證據。
  5. Study on the mining method for the hanging wall ore and that under the open - pit bottom

    露天掛幫礦及境界以下礦石開采方法研究
  6. Based on a comprehensive analysis of stability for the rock seam above hanging wall at dongxiang copper mine, effects of the stability on structures on ground surface are demonstrated, which provides science base for treating rationally relation between the structures and underground mining

    通過對東鄉銅礦采空區上覆巖層穩定性的計算分析,論證其對地表建(構)築物的影響,為合理處理這些地表建築物和該采區地下開採的關系提供科學決策的依據。
  7. Greenschist facies, low green schist facies and brittle shear deformation facies. the attitude of different structural element of the yagan mcc are keeping coordination. analysis of kinematics demonstrates the sse - directed shearing - off of the hanging wall relative to the footwall along the penetrative mylonitic lineation

    其變形相由變質核中心到上盤巖系(由深至淺)依次為高角閃巖相? ?綠片巖相? ?低綠片巖相? ?脆性剪切變形相,顯示亞干核雜巖由中心向邊部變形層次遞減的特點。
  8. The study area is composed of sandstone & conglomerate reservoir of alluvial fan & fan delta, which belong to sha3 lower member and sha4 upper member of lower tertiary of yong " an town oilfield in dongying depression. the target stataum develops in the hanging wall of the synsedimentary fault in the scarp zone of dongying depression. the frequently intense movements result in the variation of sandstone and conglomerate reservoir and the evolution of the time and space of sha3 lower member and sha4 upper member in yong " an town oilfield

    研究區是東營凹陷永安鎮油田沙三下段、沙四上段的沖積扇和扇三角洲砂礫巖體,目的層發育在東營凹陷陡坡帶同生斷層的下降盤,因斷層多期強烈活動,導致永安鎮油田沙三下段、沙四上段的砂礫巖體成因類型多,時空演化變化大,在扇根一帶小層對比難度大,給油田開發帶來很大的難題,在這種背景下進行流動單元研究難度更大。
  9. The hanging wall of sag extended in southeast direction, with the tulage fault being the boundary fault. yinggete - bagemaode metamorphic core complex developed adjacent to northwest of chagan sag, which evolved from late jurassic to cretaceous with three - layer construction style. the kinematics mechanism of metamorphic core complex and chagan sag is a simple shear model, chagan sag extended and faulted as the metamorphic core complex rised

    在查干凹陷西北側發育英格特?巴格毛德變質核雜巖帶,可能具有三層結構模式,其形成與演化時代為晚侏羅世末?白堊紀;該變質核雜巖與查干凹陷的運動學機制為統一的簡單剪切模式;在變質核雜巖隆升的同時,查干凹陷發生伸展斷陷。
  10. 2 both the hanging wall and the footwail rock of ore bodies are garnet biotite schist, protoliths are alkaline volcanic rocks ( tracyh andesite ). according to characteristics of trace elements assemblages and the setting of tectonics, these alkaline volcanic rocks were derived from the lower degree melting of metasomatic and enriched mantle ( eml ) in the initial stage of middle proterozoic epoch. they strongly enriched in large ion lithophile elements ( lile ), such as ba

    2 、礦體頂、底板圍巖(石榴石黑雲母片巖、鈉長黑雲母片巖等)的原巖為堿性火山巖(粗面安山巖) ,相對富集大離子親石元素ba 、 cs 、 rb 、 k 、 lree及貧zr 、 sr 、 ti 、 hf 、 hree ,為早元古代末期-中元古代早期交代富集地幔低程度部分熔融所形成的堿性火山巖。
  11. The roots of the old pagoda tree hanging down from the damaged roofs makes it looks like the wall is the support of the tree and the leaves are the cover of the roof

    老榕樹氣根自然而然自損壞的屋頂垂下攀附生根,形成樹以墻為干、屋以葉為瓦的特殊景觀。
  12. I dried my hands and took out my pocketbook from the inside of my tunic hanging on the wall.

    我揩乾手,從掛在墻上的制服里掏出皮夾子來。
  13. There was two old dirty calico dresses, and a sun - bonnet, and some women s underclothes hanging against the wall, and some men s clothing, too

    還有兩件臟舊不堪的花洋布衣服,還有一頂太陽帽和幾件女人的內衣,都掛在墻上。墻上還掛著幾件男人的衣服。
  14. The trim hedge, the grass - plot before the door, the little flower - bed bordered with snug box, the woodbine trained up against the wall, and hanging its blossoms about the lattice ; the pot of flowers in the window ; the holly, providently planted about the house, to cheat winter of its dreariness, and to throw in a semblance of green summer to cheer the fireside ; all these bespeak the influence of taste, flowing down from high sources, and pervading the lowest levels of the public mind

    宅前樹籬齊整,綠草茵茵,花圃精巧,四周黃楊密植;忍冬緣墻而上,其花綻放,星星點點,綴于窗欞;窗臺飾有盆花,居所四周植有冬青,聊以消解寒冬之孤寂,室內爐火熊熊,雖非夏日,宅前院后綠意濃濃,亦使居者倍感愜意;凡此種種,皆孕高雅之情趣,自紳士名流,至草根百姓,澤被萬民。
  15. Recovery of wall - hanging orebody outside south mining area boundary of liuheyu deposit

    柳河峪礦床南采區境界外掛幫礦體的回收
  16. If you specify the duration only, you enable microsoft project to schedule the clock - hanging flexibly, moving the start date forward or back if the wall - painting occurs later or earlier than planned

    如果只指定工期, microsoftproject便能靈活地排定懸掛鐘表的日程,如果粉刷墻壁比原規劃有所提前或推遲,懸掛鐘表的開始日期也就相應地提前或推遲。
  17. For example, if you specify a fixed start date for hanging clocks on a wall and the date for painting the walls slips, you and the clocks are going to get awfully messy

    譬如,如果為懸掛鐘表指定了固定的開始日期,但是粉刷墻壁的日期有所推遲,那麼您的項目和這些鐘表就會出現混亂。
  18. Situated in the north and facing the south with a little to the west, the temple was built with a mixed structure of sheer wall with girder system. a typical hanging over bracket set structure of southern china

    建築座北朝南略偏西,構造形式為承重墻加柱樑系統的混合構造,柱樑系統為南方特有的疊斗式,承重墻則為磚造再予以粉刷。
  19. * * * the work can overlap. if the museum crew prepares one gallery wall at a time, maybe they can start hanging clocks before all the walls are finished

    譬如,博物館全體工作人員準備依次布置陳列室的墻壁,則他們可以在所有墻壁粉刷結束之前就開始懸掛鐘表。
  20. For example, the exhibit planner might add lag time between painting a wall and hanging clocks on the wall, because the planner knows the paint will take time to dry

    譬如,展覽會的計劃者可能在粉刷墻壁和在墻上懸掛鐘表之間添加延隔時間,即塗料乾燥所需的時間。
分享友人