harbour construction 中文意思是什麼

harbour construction 解釋
港口建築
  • harbour : n 1 海港,港口;港灣。2 〈比喻〉避難所,藏身處。3 【軍事】坦克掩蔽場。vt 1 隱匿,窩藏(罪犯等)。...
  • construction : n 1 建築,結構,構造,架設,鋪設;建設;設計;工程;建築法,構造法,建築物;【戲劇】搭置,布景,...
  1. The two unbuilt piers ( including the one abutting wkcd ) shown on the original draft ozp were finger - type piers which would extend into the harbour and their construction would involve reclamation

    該兩個未有興建的碼頭(其中一個位於西九龍文娛藝術區旁邊)顯示于原分區計劃大綱草圖,形如手指,向海港伸展,須填海興建。
  2. It is a non - propelled crane ship after conversion, operating in ports and calm waters, deploying towing in chinas coastal class ii navigational area and suitable for salvage of sunken ships, harbour construction, lifting of bridge beams sections for erection, loading unloading heavy cargoes as well as offshore oil drilling production platform and other offshore hook - up

    本船改建后為非自航固定式起重船,以港口及平水區域作業為主,可在我國沿海ii類航區中調遺拖航,適用於打撈船舶港口建設橋梁吊裝裝卸重大物件,以及海上石油鉆井採油平臺和其他海上弔裝工程。
  3. On the western side, belcher bay reclamation and the construction of belcher bay link on it were completed in february 1997 to tie in with the opening of the western harbour crossing

    在港島西面,卑路乍灣填海工程及在該填海區興建的卑路乍灣連接路,已在一九九七年二月竣工,配合西區海底隧道的啟用。
  4. We have participated in many major projects in europe in the field of harbour construction ; bridge building, ships lock construction as well as giant dredging machinery building

    自成立以來,我公司參與了歐洲范圍內的一系列主要的大型港口,橋梁的改造及大型機械的建造項目。
  5. Contract cc - 604 is awarded to costain - china harbour joint venture for the construction of the west rail depot buildings at a contract sum of hk $ 693 million

    Cc - 604是為西鐵興建車廠大樓,合約價值六億九千三百萬港元,中標公司為高捷達- -
  6. According to the analysis of the beach distribution, landforms and structure of flood land, hydrologic geology and bad geological phenomena in the middle - lower reaches of yangtze river, this paper comprehensively studies the environmental geological conditions for harbour construction in the banks of yangtze river. discussed are the relation between inner material component and rock system beheath in the beach. presented are beachs structure and the category and the behaviour of groundwater, and offers a scientifis basis for harbor construction

    論述了長江中下游漫灘分佈特徵及其成因,分析了漫灘微地貌及其相關沉積物的地質特徵,從漫灘內部物質組成及其下覆巖系關系,全面地論述了漫灘的結構特徵,闡述了地下水的類型及動態,以及由此引起的不良地質現象,為長江中下游港口工程建設提供了地質依據
  7. Design and construction code of rock - socketed piles for harbour engineering

    港口工程嵌巖樁設計與施工規程
  8. Design and construction technical standard for cast in - situ pile of harbour engineering

    港口工程灌注樁設計與施工規程
  9. Manning norm for engineering ship. harbour construction ship

    工程船舶勞動定員航務工程船舶
  10. This vessel is a harbour crane ship, may also do towing work along coast and mainly be used for the construction of nansha a coastal harbours, load unload heavy cargoes, lifting erection work on water and salvage of wrecks

    本船為港內起重船,可在沿海拖航遺,主要用於南沙及沿海港口建設,裝卸重大物件水上弔裝工程和打撈沉沒物體。
  11. Growing along with hong kong, we have been taking up projects of larger scale towards the late 80 s. the construction of the china harbour view hotel was one of the examples

    建築方面,鴻業承接了樂基大廈的改建及加建工程,將一座工廠大廈改建為寫字樓,另外加四層新寫字樓。
  12. This text introduces economic development of fenghua and interior river and transports the current situation at first, including the respects, such as resource, port facilities, inland channel of inland port, etc., analyse the composition of passenger - cargo traffic volume at present of fenghua, and predict its throughput of water transport goods, put forward the necessity of building and using green engineering construction of harbour of inland centre of fenghua

    本文首先介紹奉化市經濟發展和內河水運的現狀,包括內河港口資源、港口設施、內河航道等方面,分析奉化市目前客貨運輸量的構成,並對其水運貨物吞吐量進行預測,提出奉化市內河中心港建設和運用綠色工程建設的必要性。
  13. Zhejiang 8 amounting to tunnel engineering limited company is alley of well of bridge of road surface of channel of pilot a ship into a harbour of water and electricity of volume road tunnel, railroad channel, irrigation works, roadbed, mine, large cubic metro of earth and stone blow up the professional construction company that construction is an organic whole, have channel highway project to always contract two class aptitude

    浙江八達隧道工程有限公司是集公路隧道、鐵路隧道、水利水電引水隧道、路基路面橋梁、礦山井巷、大型土石方爆破施工為一體的專業施工企業,擁有隧道公路工程總承包貳級資質。
  14. The construction of phase iii started in september 1935 and was completed in 1939, when the third cross - harbour pipeline had been laid. this phase included the laying of twin cross - harbour pipelines that connected kowloon and hong kong island, the building of the tunnel and pumping station, the heightening of the main dam from 115 ft. to 275 ft. and the construction of an auxiliary dam, named the pineapple pass dam

    第三期工程於1935年9月展開,至1939年第三條海底輸水管建成后才告完工,主要工程包括兩條連接九龍至香港的海底輸水管、連接水塘與供水網路的輸水隧道、抽水機、主壩由115尺加高至275尺,以及興建82尺高的菠蘿凹副壩。
  15. The director of highways, mr mak chai - kwong, today signed the 1, 012 million contract on behalf of the government with dragages - china harbour joint venture for the construction of east tsing yi viaduct

    路政署署長麥光代表政府,與寶嘉中國港灣聯營公司簽署該份工程合約該合約造價為十億一千二百萬元。
  16. The west dam faced the inner sea of rocky harbour and was 2, 470 ft. long and 333 ft. high. the construction of the 2 dams was a complicated process, as 2 cofferdams had to be constructed at each of the sites, before the main dams could be built. these were to keep the dam sites dry for construction

    兩條主壩建築工程相當復雜,在興建主壩之前,需于建築堤壩地點建造圍堰,將海水隔開,抽乾海床范圍內的海水,挖除黏土和沙,才築堤壩,使主壩能穩固地建造在堅硬的巖石上。
  17. The formal project agreement was signed in september 1993, with the western harbour tunnel company limited, to finance, construct and operate the tunnel under a 30 - year franchise. construction works commenced in september 1993 and were completed in april 1997

    工程合約於一九九三年九月與香港西區隧道有限公司正式簽定,在為期三十年的專營期內,西隧公司負責隧道集資建造及經營。
  18. Hon hui cheung - ching raised a question on the proposed construction of a cross - harbour bridge connecting zhuhai and hong kong

    許長青議員就興建連接珠海及香港的跨海大橋的建議提出質詢。
  19. For the construction of the new airport in hong kong, the airport core programme was designed involving substantial reclamation of land, construction of an airport, associated bridges and railway systems, a cross - harbour tunnel, expressways and a new town

    在香港新機場的工程中,機場核心工程包括大規模填土、興建機場各座大樓、鋪設橋梁及鐵路系統、跨海隧道、高速公路與建設新市鎮等。
  20. Evaluation, design, construction, field observation, supervision in soft ground engineering, harbour engineering, foundation engineering, and highway engineering, etc

    土木水利工程中軟基加固、港口碼頭、地基基礎及道路等工程的評估、設計、施工及安全監測、工程監理的咨詢。
分享友人