high slope 中文意思是什麼

high slope 解釋
高邊坡
  • high : adj 1 高的〈指物,形容人的身高用 tall〉;高處的;高地的。2 高級的,高等的,高位的,重要的。3 高尚...
  • slope : n 1 傾斜,坡度;坡,斜坡,斜面;【印刷】斜體。2 【軍事】掮槍的姿勢。3 【數學】斜率。4 【礦物】斜...
  1. The above analysis shows some results as follows : generally the discontinuities including bedding planes are favor to the stability of slope, which means that most of the slopes will not suffer large sliding failure ; most of the high slopes situated in the interest area are stable. however there are some potential unstable wedges which can be identified based on the key block theory ; some suggestions for reinforcing high slope are presented based on the stability analysis and environmental friendly consideration

    結果表明:該區邊坡巖體條件對邊坡整體穩定性有利;區內高陡邊坡以穩定及基本穩定為主,不穩定邊坡較少,但潛在局部不穩定塊體較多;依據邊坡的工程地質特徵及穩定性評價結果,對該區高陡邊坡的防治提出了建議。
  2. Instable zone analysis of high slope after landslide

    開挖邊坡潛在不穩定范圍的預測分析
  3. In this paper, research is emphasized on the situation of slope protection in shaanxi areas, analyses the engineering and economic effect of all kinds of slope protection, compare the traditional protection with the new, puts forward the protection principle that should be followed in shaanxi areas, study the destruction mechanism and stability analysis of high slope in ocher area, and puts forward effected and economic new protection methods

    本文對陜西地區的邊坡防護狀況進行了研究,分析各種防護型式的防護效果及其經濟效益,並結合國內外的防護新技術,對傳統防護型式和新型防護型式進行了對比分析,提出陜西地區在以後的防護工程中應該遵循的原則,並研究了黃土高邊坡的破壞機理和穩定性判斷的方法,提出巖土邊坡有效、經濟的新型防護措施及其施工工藝。
  4. Three - dimensional finite element analysis of spandrel groove high slope stability of xiluodu hydropower station in jinsha river, china

    溪洛渡水電站拱肩槽高邊坡穩定性的三維有限元分析
  5. From the aspect of the coupling action of geological and engineering conditions, this paper analyzes their influences on high slope stability. the result shows that constructional surface, lithology, slope angle and height are the most influential factors. provided that a slope angle in a stepped slope is constant, the slope stability is very sensitive to the height / width ratios of steps, and the best design for the slope is to make the height of each step no more than one - third of the total height and the height / width ratio between 1 : 0. 2 - 0. 3

    從地質與工程耦合作用出發,分析了地質因素和工程條件對高邊坡穩定性的影響,指出結構面、巖性以及坡角和坡高是邊坡穩定性的重要影響因素,在邊坡角一定的前提下臺階狀邊坡的臺階高寬比對邊坡穩定性影響山十分明顯,一般以每級臺階的高度不超過總坡高的1 / 3 ,高寬比在1 : 0 . 2 0 . 3之間為最佳設計。
  6. Based on the discuss of the geologic environment of the high slope of spandrel groove jinping i hydroelectric power station. and the engineering geological conditions of rock mass are carefully studied in the paper. the modified csmr are adopted to perform the classification of the slope rock mass, the results of which are combined with the macroscopic stability of the high slope. on the basis of these, the methods of geological diagnosis and the finite element analysis are applied to analyze and compute the overall stability of the high slope

    本文在闡明錦屏一級水電站壩區巖體的形成和演化特徵的基礎上,詳細研究了拱肩槽高邊坡巖體的結構特徵及岸坡巖體淺表生改造特徵,建立了岸坡巖體淺表生改造與岸坡演化模式,分析研究了巖體的物理力學性質,採用修正的csmr法對拱肩槽高邊坡的巖體質量進行分級研究,在此上基礎之上,採用地質分析判斷和有限元分析等方法,對高邊坡整體穩定性進行了系統分析、計算與評價;應用塊體理論對高邊坡的局部穩定性進行了分析計算,確定局部不穩定塊體的規模、出露范圍,從而對拱肩槽高邊坡的局部穩定性有了系統全面的認識和了解。
  7. This paper primary research and achievements that concerned about the dynamic stability for jindui city artificial filled relax high slope has been made as follow : ( 一 ) in the nature condition, utilizing finite - element method and engineering geology technique, gained the type, mechanism, rule of the deformation and destruction of the slope as below : the type of unitary destroy ; the shallow part destruction

    本文主要從以下幾個方面對金堆城排廢場人工堆積鬆散高邊坡進行動力穩定性研究: (一)利用有限元模擬結果,結合野外工程地質調繪,得到研究區人工堆積高邊坡在自然條件下,有如下幾種變形及破壞類型:整體破壞( a ) ? ?蠕滑拉裂型、整體破壞( b ) ? ?拉裂滑移型、表部破壞( a ) ? ?細溝、沖溝型、表部破壞( b ) ? ?滑塌型。
  8. Technology of consolidation and protection for high slope of cut

    路塹高邊坡的加固與防護技術
  9. Basic tests on the prestressing force anchor of a high slope project

    路塹高邊坡錨固工程預應力錨索基本試驗
  10. 3d limit analysis of stability of high slope at intake of huge hydropower station

    水電站進水口高邊坡穩定性三維極限分析
  11. The choice dam type is especial importance, during the designed research of the rock - fill dam, particular under the rock - fill dam with very deeply cover layer, the stress and strain of the middle wall and cutting interpenetration wall of the dam foundation is mostly sensitive, whether the. design of dam is scientific and reasonable, it is very important for cutting interpenetration and stability of the dam, the article offer the reference for the design of cutting interpenetration in the foundation with deep cover with earth the water conservancy in xiaban zone, based on the study and analysis the design of cutting seep in the foundation with deep cover with earth, cutting interpenetration concrete wall and the joining model of cutting interpenetration material in body of dam and the applying effect in the practical worko based on the foundation which absorbed and summarize the achievement of design and research in the inter and outer country, for the project of the clay vertical middle wall and vertical cutting interpenetration, the asphalt concrete vertical middle wall and vertical cutting interpenetration the clay inclined middle wall and the lever carpet layer cutting interpenetration, respectively in terms of the different stage of complete period sluice period and working condition, adopting nonlinear calculate and analysis with the finite element method ; carrying the analysis and study with the 3d finite element method as to the different joining model of the left bank high slope cutting interpenetration body and the foundation concert cutting interpenetration wall ; carrying the analysis and study with the 3d finite element method as to the effect of the wall stress and strain because of the different elasticity modulus of the concert cutting interpenetration wall through the analysis and study with the different project. have comparatively all - around comprehended the various model dam, particular the distribute rule of stress and strain of the cutting interpenetration system, provide for the important evidence of the plastic area size the join model of the foundation cutting interpenetrate wall and dam body cutting interpenetrate system the choice of the dam model and the design of the structure of the dam body, the result of research and advice have very importance value in design and building for the similarity project

    工程設計中,壩型的選取顯得尤為重要,特別對于壩基有深厚覆蓋層的堆石壩,心墻和壩基防滲墻的應力和變形是壩體、壩基最敏感的部位,設計方案是否安全、科學和合理,對大壩防滲和穩定起到至觀重要的作用。本文研究分析了國內外深厚覆蓋層基礎防滲設計、壩基混凝土防滲墻與壩體防滲體銜接形式及工程實際應用效果,為下坂地水利樞紐工程深厚覆蓋層基礎防滲設計的方案選擇提供了參考;在吸收和歸納了國內外堆石壩的設計研究成果的基礎上,對粘土心墻和壩基垂直防滲方案、瀝青混凝土心墻和壩基垂直防滲方案以及粘土斜心墻和壩基水平鋪蓋防滲方案,分別按竣工期和蓄水運行期的不同工作情況進行了有限元非線性計算分析;對左岸高陡邊坡的大壩防滲體與基礎混凝土防滲墻的不同結合型式進行了三維有限元靜力計算分析和研究;對混凝土防滲墻不同彈性模量對墻體應力和變位的影響進行了三維有限元靜力計算分析和研究。通過對不同方案的計算分析和研究,比較全面的了解了各方案壩體,尤其是防滲體的應力和變形分佈規律,為壩型選擇、壩體結構設計、基礎防滲墻與壩體防滲體的結合型式以及塑性區大小的確定提供了重要依據。
  12. Combined with the project of " stabilization and shoring optimizing of high slope in jinliwen highroad ", this problem was studied and following conclusion was given : 1. in order to meet the requirements of environment protection, many shoring forms such as sns ( safety netting system ) and synthetic shoring have been developed and applied to slope protection

    本文就這一問題,結合「金麗溫高速公路高邊坡穩定支護優化」課題,進行了一些工作,並得到如下結論: 1由於環境保護的要求,近年來,發展了柔性支護( snssafetynettingsystem )和綜合防護等多種支護形式,這些支護形式越來越廣泛的應用於工程當中。
  13. It is proved that the stability of rock mass high slope is mostly affected by lots of discontinuous structural faces like joints and faults, etc. it makes the rock mass be different from intact rocks completely in mechanical properties. so it is necessary for us to do some research on the deformation failure mechanism, and accordingly, we should do some research on the evolvement course and evaluation methods of stability about rock mass high slope

    工程實踐證明,節理巖體高邊坡的穩定性取決于邊坡中的不連續結構面,如節理、裂隙、軟弱面和不同巖層的分界面,這類結構面的存在使巖體變形破壞的特性與完整巖石截然不同,因此,有必要加強對節理巖體高邊坡變形破壞機制的研究及相應的節理巖體高邊坡穩定性評價方法的研究。
  14. Observation and analysis of blasting vibration on the north high slope of jinduicheng open pit mine

    金堆城露天礦北幫振動觀測與分析
  15. Safety analysis and application of rock deformation for high slope

    高邊坡巖體變形安全性分析及其應用
  16. Designing retailing wall for high slope taking advantage of the bedrock

    充分利用基巖設計高邊坡擋土墻
  17. Excavation blasting of high slope in guizhou guangzhao hydropower station

    貴州光照水電站高邊坡開挖爆破
  18. Apart from that, comprehensive damage degree is presented and its function equations are established in this paper, with exploration of the conception of applying comprehensive damage degree to the evaluation of slope stability and in its treatment. with that as a basis, seven indicators for high slope stability evaluation are put forward

    此外,還提出了綜合損傷度,建立了邊坡綜合損傷度的函數表達式,並探討了利用綜合損傷度評價邊坡的穩定性以及進行邊坡治理的基本思路,在此基礎上提出了地質條件與工程條件共同作用的7個巖質高邊坡穩定性評價指標。
  19. The data from xinbi high - slope shows that it ' s a stable slope. 3. the result of elasto - plastic finite element analysis shows that : ( 1 ) excavated - slope face would induce loose belt in rock ; ( 2 ) horizontal ground stress, joined rockmass and weak sandwich would make great unfavorable influence on slope stabilization and axial force of rock bolt

    有限元數值分析結果表明:邊坡的開挖會使坡面巖體產生松動帶;構造水平地應力、結構面、軟弱夾層對坡體穩定及支護在坡體上的錨桿的受力情況有較大的不利影響。
  20. During the course of design and construction of highway, for the purpose of length, turning radius and longitudinal gradient, we have to construct a lot of high slope engineerings. so the slip of roadbed ' s slope often happen

    在公路的設計、建設過程中,為滿足直線長度、轉彎半徑及縱坡的坡度等要求,不得不劈山填谷,從而形成大量的高邊坡工程。
分享友人